Skip Top Navigation

Value Engineering

Project Selection for VE studies – WSDOT requires value engineering for structural projects over $20 million and all projects over $25 million. Projects with estimated total costs less than these amounts can apply value engineering to enhance performance of a facility, reduce cost, or as a tool to build consensus by engaging stakeholders.

2015 AASHTO Value Engineering Award Recipients - Congratulations to South Central Region and the Strategic Analysis Estimating Office. Their work on the SR 124 Monument Road/RR Xing project received honorable mention for Pre-Construction Engineering.

Project Due VE Studies

News