Return to Map

HIGHEST IMPACT
US 2 Both Directions - US 2 remains closed from Coles Corner milepost 84.75 to Leavenworth at milepost 99 due to fire activity, with no estimated time for reopening. SR 207 and the Chumstick Highway are open as a detour for vehicles less than 26,000 lbs. Local delivery trucks over 26,000 lbs. allowed. Last Updated: 7/25/2014 8:06 AM More Info
From milepost 85 to milepost 99
MODERATE IMPACT
I-90 Both Directions - Rock blasting closures scheduled Monday through Thursday at 8:00 p.m. lasting one hour or more. During blasting I-90 will be closed milepost 56 near Gold Creek to milepost 61 near Price Creek. During closures there are no services eastbound past milepost 53 and westbound past milepost 70. I-90 is closed to bicycles both directions from Hyak Exit 54 to Stampede Pass exit 62. Last Updated: 7/25/2014 2:25 PM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90/Snoqualmie Pass Vic.–PCCP Rehab EB/Storm water Retrofit/Delineation Current Week Traffic Advisory: I-90 milepost 47 to 55.2 EB: Right lane closures 24 hours a day. Work hours are primarily Mon night July 28 through Sat morning Aug 2 from 10 p.m. to 9 a.m. A center lane will be closed continuously during the week, this will require traffic to shift to the right or left. WB: Single lane closures 24 hours a day Mon night July 28 through Sat morning August 2 from 10 pm to 9am Last Updated: 7/25/2014 1:27 PM More Info
From milepost 47 to milepost 55
MODERATE IMPACT
US 2 Northbound - Monday through Thursday, 6 a.m. to 8 p.m., from the Stevens Pass summit, east, expect some lane shifts and shoulder closures, but two way traffic will be maintained as crews are grinding pavement in preparation for paving. Speed is reduced to 45 during work hours. Bicyclists and pedestrians will be bussed through the work zone when the outside lane and shoulder are closed. Last Updated: 7/21/2014 3:37 PM More Info
From milepost 64 to milepost 72
MODERATE IMPACT
US 2 Both Directions - Monday through Thursday, from 7 a.m. to 7 p.m., expect the Eastbound lanes west of the Stevens Pass summit to be closed and traffic shifted to the Westbound lanes during the day with all four lanes unrestricted overnight where crews are stabilizing a rock slope above the highway. Last Updated: 7/14/2014 2:47 PM More Info
From milepost 61 to milepost 64
MODERATE IMPACT
SR 410 Both Directions - 0.47 Miles to 1.45 Miles East of Chinook Pass – Rock Scaling SR 410, MP 69 to MP 71 Current Week Traffic Advisory: SR 410, 0.47 miles to 1.45 miles east of Chinook Pass summit: Monday, July 28 through Friday August 1, motorists can expect 30 minute delays between the hours of 6 a.m. to 4:30 p.m. Mon through Thur and from 6 a.m. to noon on Fridays. No work scheduled Saturdays and Sundays. Motorist can access US 12 and SR 123 as alternate routes. Last Updated: 7/25/2014 11:57 AM More Info
From milepost 69 to milepost 71
LOW IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 56 to 61: Drivers should prepare for intermittent rolling slowdowns both directions Monday through Friday, July 28 through August 1, during daytime hours. Nighttime Restrictions: Traffic will be reduced to one lane both directions, Monday through Friday, July 28 through August 1, during nighttime hours only. Last Updated: 7/25/2014 2:28 PM More Info
From milepost 56 to milepost 61
LOW IMPACT
I-90 Both Directions - I-90 milepost 61 to 65 Price Creek Paving: EB: Nightly single lane closures Mon through Fri, from 10 p.m. until 9 a.m.. Aug 4 the eb off and on ramps at Stampede Pass Interchange will be closed from 10 pm. until 9 am. for paving. Aug 5 the eb off and on ramps at Cabin Creek Interchange will be closed from 10 pm until 9 am for paving. WB: Nightly single lane closures can be expected Mon through Fri from 10 pm. until 9 am.. There will be intermittent short term ramp closures at the Cabin Creek Last Updated: 7/25/2014 1:48 PM More Info
From milepost 61 to milepost 65
LOW IMPACT
SR 410 Both Directions - SR 410 milepost 26 to 57.5: Monday, July 28 through Wednesday, July 30 and Friday, August 1, motorists can expect one lane flagger controlled traffic with delays of 15 minutes during daylight hours, Friday until 4 pm.. Note: There will be no project activity on Thursday, July 31 allowing for unrestricted access for the Ramrod Bicycle event. Last Updated: 7/25/2014 11:41 AM More Info
From milepost 26 to milepost 58
LOWEST IMPACT
I-90 Both Directions - I-90 Easton Hill paving MP 65 to 67: Work will resume in the summer of 2014. Last Updated: 7/25/2014 9:55 AM More Info
From milepost 65 to milepost 67
LOWEST IMPACT
I-90 Both Directions - Bicycle Alternate Route: I-90 is closed to bicycles in both directions between Hyak (Exit 54) and Stampede Pass interchange (exit 62) because there is no shoulder for bicycles to use. Bicyclists can use the John Wayne Pioneer Trail, weather permitting, as an alternate route. Last Updated: 7/25/2014 9:55 AM More Info
From milepost 54 to milepost 62
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations: US 12 milepost 133 to 134, milepost 153 to 154, and milepost 165 to 166: Monday, July 28 through Friday Aug. 1, during daylight hours, traffic will be reduced to one lane for bridge maintenance. Work will only be performed at one location at a time. Last Updated: 7/25/2014 2:31 PM More Info
From milepost 133 to milepost 166
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations: US 12 milepost 199 to milepost 198.4 in both directions: Monday, July 28 through Wednesday, July 30, 8:30 a.m. to 3:30 p.m., traffic will be reduced to one lane for bridge maintenance. Work will only be performed at one location at a time. Traffic control will consist of signs, cones, barrels and VMS messaging to direct traffic flow. Last Updated: 7/25/2014 11:14 AM More Info
From milepost 199 to milepost 199
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations: US 12 milepost 166 to milepost 151, Monday through Thursday during daylight hours, WSDOT crews will be grinding areas of pavement with alternating one lane traffic control. Drivers can expect possible 30 minute delays. Last Updated: 7/25/2014 9:53 AM More Info
From milepost 166 to milepost 151