HIGHEST IMPACT
I-5 Southbound - On the I-5 southbound off-ramp to Airport Way (MP 166) there is an obstruction blocking the ramp. The Incident Response Team and the State Patrol have arrived on the scene. Last Updated: 7/30/2014 7:44 AM More Info
At milepost 166
HIGHEST IMPACT
US 2 Both Directions - US 2 remains closed from Coles Corner milepost 84.75 to Leavenworth at milepost 99 due to fire activity, with no estimated time for reopening. SR 207 and the Chumstick Highway are open as a detour for vehicles less than 26,000 lbs. Local delivery trucks over 26,000 lbs. allowed. Last Updated: 7/30/2014 9:34 AM More Info
From milepost 85 to milepost 99
HIGHEST IMPACT
SR 520 Both Directions - On SR 520 eastbound & westbound at Evergreen Point Floating Bridge (MP 3) all lanes will be closed today at 12:00 PM due to boat traffic. Drivers should anticipate a delay of up to 30 minutes or consider using an alternate route. Last Updated: 7/30/2014 10:04 AM More Info
At milepost 3
HIGH IMPACT
I-5 Both Directions - Wednesday, July 30 - A concert that begins at 8:00 p.m. at Key Arena will cause additional congestion on highways leading into Seattle, including I-5, I-90, SR 520 and SR 99. Last Updated: 7/24/2014 10:50 AM More Info
From milepost 162 to milepost 174
HIGH IMPACT
US 97A Both Directions - US 97A is closed from milepost 223 at the junction with SR 971, through the Knapps Hill Tunnel, to milepost 230.5 at Pat & Mike's just south of Chelan. There is a detour in place onto SR 971 over Navarre Coulee Road and South Lakeshore Drive. Motorists traveling between Wenatchee and Chelan can also use US 2 and US 97 on the east side of the Columbia River. The closure will be in place from 6:00 AM Wednesday, July 30th until 8:00 PM Thursday, July 31st. Last Updated: 7/30/2014 9:33 AM More Info
From milepost 223 to milepost 231
HIGH IMPACT
US 97A Both Directions - Wednesday and Thursday traffic is detoured off of US 97A onto SR 971 (South Lakeshore Drive/Navarre Coulee Rd.) between Pat and Mike's and the Knapps Hill Tunnel where a crew is chip sealing. Last Updated: 7/28/2014 11:55 AM More Info
From milepost 223 to milepost 231
HIGH IMPACT
SR 520 Westbound - Monday, July 28 to the morning of Thursday, July 31 - The 84th Avenue Northeast on-ramp to westbound SR 520 will close nightly from 11 p.m. to 5 a.m. for concrete pouring work. Last Updated: 7/24/2014 12:52 PM More Info
At milepost 5
HIGH IMPACT
SR 520 Westbound - Monday, July 28 to the morning of Thursday, July 31 - All lanes of westbound SR 520 between 92nd Avenue Northeast and Montlake Boulevard will close nightly from 11 p.m. to 5 a.m. for concrete pouring work. Last Updated: 7/24/2014 12:51 PM More Info
From milepost 5 to milepost 1
MODERATE IMPACT
I-5 Both Directions - Tuesday, July 8 to November - Both directions of I-5 near the Stillaguamish River Bridge have been reduced to two lanes until bridge work is complete in November. Drivers should be prepared for some delays throughout the day. The heaviest northbound congestion is expected Thursdays and Fridays 3-6 p.m., and Saturdays and Sundays 11 a.m. to 4 p.m. The heaviest southbound congestion is expected Sundays 4 to 6 p.m. Drivers should plan for up to 35 minutes of extra travel time during these hours. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
MODERATE IMPACT
I-5 Southbound - All southbound I-5 traffic is reduced to two lanes and will use a new crossover across the median to two lanes of northbound I-5 across the Stillaguamish River Bridge, crossing back over on the other side of the bridge, until the project is complete in November. Northbound I-5 is reduced to two lanes from SR 530 to 236th Street Northeast as well. Drivers should prepare for a 55 mile per hour speed limit in both directions in the work zone. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
MODERATE IMPACT
US 2 Northbound - Monday through Thursday, 6 a.m. to 8 p.m., expect lane shifts and shoulder closures in the four lane section. In the two lane section, some 20 minute delays with flaggers and a pilot car may be necessary. This week, crews will be grinding pavement in preparation for paving. Speed through the work zone will be reduced to 45. When outside lanes and shoulders are closed, bicyclists and pedestrians will be bussed through the work zone. Last Updated: 7/28/2014 11:45 AM More Info
From milepost 64 to milepost 72
MODERATE IMPACT
US 2 Both Directions - Monday through Thursday, from 7 a.m. to 7 p.m., expect the Eastbound lanes west of the Stevens Pass summit to be closed and traffic shifted to the Westbound lanes during the day with all four lanes unrestricted overnight where crews are stabilizing a rock slope above the highway. Last Updated: 7/14/2014 2:47 PM More Info
From milepost 61 to milepost 64
MODERATE IMPACT
SR 9 Both Directions - On SR 9 northbound & southbound from Evans Dr (MP 57) to SR 542 (MP 79) there is a slow-moving maintenance operation affecting all lanes. Last Updated: 7/30/2014 7:56 AM More Info
From milepost 57 to milepost 79
MODERATE IMPACT
SR 9 Northbound - Monday, July 28 to Friday, Aug. 1 – One lane of northbound SR 9 may be closed daily near Front Street from 7 a.m. to 3 p.m. for construction. Flaggers will direct traffic through the work zone. Last Updated: 7/24/2014 3:09 PM More Info
From milepost 97 to milepost 99
MODERATE IMPACT
SR 9 Both Directions - Wednesday, July 30 to Friday, Aug. 1 – Drivers should expect one-lane closures on SR 9 between Doran Road and SR 542 from 7 a.m. to 7 p.m. for paving work. Flaggers and pilot cars will guide traffic through the work zone. Drivers should expect a variable speed limit through the work zone. This work is weather-dependent. Last Updated: 7/24/2014 3:07 PM More Info
From milepost 69 to milepost 80
MODERATE IMPACT
SR 20 Both Directions - Eastbound & westbound traffic is alternating on SR 20 from Moen Rd (MP 92) to Jackman Creek Rd (MP 93) due to roadwork. Last Updated: 7/30/2014 7:40 AM More Info
From milepost 92 to milepost 93
MODERATE IMPACT
SR 20 Both Directions - Eastbound & westbound traffic is alternating on SR 20 at Cascade River Rd (MP 106) due to maintenance. Last Updated: 7/30/2014 7:23 AM More Info
At milepost 106
MODERATE IMPACT
SR 520 Westbound - Monday, July 28 to the morning of Friday, Aug. 1 - The right lane of westbound SR 520 between the east highrise and Montlake Boulevard will close nightly from 9 p.m. to 6 a.m. for concrete pouring work. Last Updated: 7/24/2014 12:53 PM More Info
From milepost 4 to milepost 1
MODERATE IMPACT
SR 522 Eastbound - Tuesday, July 29 to the morning of Thursday, August 21 - The SR 522 ramp to eastbound US 2 will be closed around-the-clock from 10 p.m. Tuesday, July 29 to 12:01 a.m. Thursday, August 21 for bridge repaving. Drivers will follow a short detour to access US 2. Last Updated: 7/28/2014 10:36 AM More Info
At milepost 25
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – Up to three lanes of southbound I-405 between Northeast 85th Street and Northeast 70th Street will close starting at 7 p.m. nightly for pavement grinding and lane restriping work. Two lanes will close at 8 p.m., and three lanes will close at 10:30 p.m. One lane will open by 4:30 a.m. and all lanes by 5 a.m. each day. Last Updated: 7/28/2014 11:22 AM More Info
From milepost 18 to milepost 18
LOW IMPACT
I-405 Northbound - Thursday, July 31 to the morning of Friday, August 1 – The northbound I-405 off-ramp to Northeast 85th Street will close from 10 p.m. to 6 a.m. for guardrail installation work. Last Updated: 7/25/2014 10:42 AM More Info
From milepost 14 to milepost 15
LOW IMPACT
I-405 Southbound - Tuesday, July 29 to the morning of Thursday, July 31 – The Northeast 128th Street on-ramp to southbound I-405 will close from 8 p.m. to 5 a.m. for barrier and electrical work. Last Updated: 7/25/2014 10:40 AM More Info
At milepost 21
LOW IMPACT
I-405 Southbound - Tuesday, July 29 to the morning of Thursday, July 31 – The southbound I-405 off-ramp to Northeast 128th Street will close from 8 p.m. to 5 a.m. nightly for barrier and electrical work. Last Updated: 7/25/2014 10:40 AM More Info
At milepost 21
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast 128th Street on-ramp to northbound I-405 will close from midnight to 6 a.m. nightly for barrier and electrical work. Last Updated: 7/25/2014 10:37 AM More Info
At milepost 21
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The northbound I-405 off-ramp to Northeast 128th Street will close from midnight to 6 a.m. nightly for utility work. Last Updated: 7/25/2014 10:37 AM More Info
At milepost 21
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The northbound I-405 off-ramp to Northeast 124th Street/Totem Lake Boulevard will close from 10 p.m. to 6 a.m. nightly for roadway excavation and paving work. Last Updated: 7/25/2014 10:36 AM More Info
At milepost 20
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast 85th Street on-ramp to southbound I-405 will close from 10 p.m. to 6 a.m. nightly for roadway excavation and paving work. Last Updated: 7/25/2014 10:36 AM More Info
At milepost 18
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast 70th Street on-ramp to southbound I-405 will close from 8 p.m. to 6 a.m. nightly for roadway excavation and paving work. Last Updated: 7/25/2014 10:32 AM More Info
At milepost 17
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The southbound I-405 off-ramp to Northeast 70th Street will close from 9 p.m. to 6 a.m. nightly for electrical, paving, roadway excavation and lane restriping work. Last Updated: 7/25/2014 10:32 AM More Info
At milepost 17
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast 70th Street on-ramp to northbound I-405 will close from 9 p.m. to 6 a.m. nightly for survey and sawcutting work. Last Updated: 7/25/2014 10:31 AM More Info
At milepost 17
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The northbound I-405 off-ramp to Northeast 70th Street will close from 9 p.m. to 6 a.m. nightly for survey and sawcutting work. Last Updated: 7/25/2014 10:31 AM More Info
At milepost 17
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The SR 527 ramp to southbound I-405 will close from 10 p.m. to 5 a.m. nightly for electrical and striping work (Weather and temperature dependent). Last Updated: 7/25/2014 10:20 AM More Info
At milepost 27
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The southbound I-405 off-ramp to Northeast 160th Street will close from 11 p.m. to 5 a.m. nightly for sign structure work. Last Updated: 7/25/2014 10:20 AM More Info
At milepost 23
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast 160th Street on-ramp to southbound I-405 will close from 8 p.m. to 5 a.m. nightly for electrical work. Last Updated: 7/25/2014 10:19 AM More Info
At milepost 23
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The eastbound and westbound SR 520 ramps to northbound I-405 will close from 10 p.m. to 4 a.m. nightly for electrical work. Last Updated: 7/25/2014 10:19 AM More Info
At milepost 15
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The northbound I-405 ramp to westbound SR 520 will close from 11 p.m. to 4 a.m. nightly for bridge work. Last Updated: 7/25/2014 10:18 AM More Info
At milepost 15
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast Eighth Street on-ramp to northbound I-405 will close from 11 p.m. to 5 a.m. nightly for paving work. Last Updated: 7/25/2014 10:18 AM More Info
At milepost 14
LOW IMPACT
SR 203 Both Directions - Monday, July 28 to Friday, August 1 - A single lane of SR 203 from Monroe to Carnation will be closed from 8:30 a.m. to 3 p.m. daily for a variety of roadwork. Traffic will be flagged through the work zone. Last Updated: 7/24/2014 8:06 AM More Info
From milepost 5 to milepost 24
LOW IMPACT
SR 215 Both Directions - expect lane shifts, shoulder closures and pedestrian detours as crews continue to upgrade sidewalks and repair drainage issues. At the intersection of US 97 and SR 215, expect shoulder closures for trench excavation and installation of illumination system conduits. The traffic islands and sidewalk ramps will be reconstructed to meet ADA standards. Expect lane shifts, flaggers and closures at night for pavement grinding. Last Updated: 7/21/2014 3:40 PM More Info
From milepost 0 to milepost 7
LOW IMPACT
SR 522 Both Directions - Monday, July 28 to the morning of Friday, August 1 - A single lane of SR 522 from Fales/Echo Lake Road to US 2 will be closed from 10 p.m. to 5 a.m. nightly for paving work. Last Updated: 7/25/2014 10:22 AM More Info
From milepost 20 to milepost 25
LOW IMPACT
SR 522 Both Directions - Monday, July 28 to the morning of Friday, August 1 - A single lane of 164th Street at the SR 522 interchange will be closed from 8 p.m. to 5 a.m. nightly for utility and drainage work. Last Updated: 7/25/2014 10:20 AM More Info
At milepost 23
LOW IMPACT
SR 530 Both Directions - Monday, July 28 to Saturday, August 2 - Traffic will be flagged through in both directions of SR 530 in Oso from 6 a.m. to 6 p.m. daily to allow trucks to load and unload material. Wait times have typically been about 5 minutes. Last Updated: 7/24/2014 7:54 AM More Info
From milepost 36 to milepost 39