Return to Map

MODERATE IMPACT
I-82 Both Directions - I-82 milepost 132 Columbia River Bridge: Eastbound traffic is shifted to the westbound Columbia River bridge into Oregon. The speed limit is reduced to 40 mph. Westbound traffic is reduced to a single lane. Last Updated: 12/10/2017 7:32 AM More Info
At milepost 132
LOWEST IMPACT
I-82 Both Directions - I-82 – Bonneville Power Administration – Install Fiber Line MP 122 to MP 10 in Oregon: Monday Dec. 11 drivers should prepare for rolling slowdowns and possible added travel time in both directions of I-82 between the I-82/ Coffin Road - Exit 122 Interchange Vicinity and the I-82 / Powerline Road – Exit 5 Interchange in Oregon. Work will take place Monday, December 11, 2017, between the hours of 8 A.M. and 1 P.M., but could be moved to Tuesday – Friday depending on weather conditions. Last Updated: 12/10/2017 7:29 AM More Info
At milepost 122
LOWEST IMPACT
I-82 Both Directions - I-82 / US 97 – Yakima County Deck Rehabilitation I-82 MP 41 to 42, US 97 MP 37 to 38: I-82 milepost 41: 8 a.m. Monday Dec. 11 through 8 p.m. Tuesday Dec. 12, westbound traffic will be reduced to a single lane 24 hours per day. No impacts to traffic are anticipated.

US-97 milepost 37: 8 a.m. Wednesday Dec. 13 through 8 p.m. Thursday Dec. 14, traffic should be prepared for alternating one-way traffic control 24 hours per day. Minimal delays are anticipated. Last Updated: 12/10/2017 7:26 AM More Info
From milepost 41 to milepost 42