SR 14 Both Directions - SR 14, Camas-Washougal Widening and Interchange (mileposts 11.93 to 15.54)
Traffic Impacts:
• Saturday, May 5 – Friday, May 11: Daytime intermittent flagging throughout the project area. Expect up to 20-minute delays.
• Monday, May 7 – Thursday, May 10: Nighttime single lane closures and flagging from 8 p.m. to 6 a.m. at the West Camas Slough Bridge.
• NOTE: All SR 14 highway traffic has been shifted onto a frontage road with a reduced speed limit of 25 mph and roundabouts.
Last Updated: 5/4/2012 9:38 AM
From milepost 7 to milepost 16
More