Northeast Washington Cameras

Alerts

As of 7/18/2018 5:36 AM
Blocking Incidents
  • SR 21 milepost 145.5 at Gold Creek, 17 miles south of Republic has a one-lane bridge with a 10 mile per hour speed limit until further notice. Follow traffic control in place and yield to on-coming traffic.
  • Road closure for construction of a roundabout on Trent Avenue(SR/290) both directions at milepost 0.7 from Hamilton Street to Napa Street beginning at 6:00 am on April 16, 2018 until mid November. Select alternate route.
  • SR 20 MP 411 is now open for traffic. The road has been rebuilt with gravel. Motorcycles should use extreme caution through this area.
  • Rough roadway with loose gravel on SR 21 in both directions at milepost 174.5 near Tucker Rd beginning at 6:45 pm on April 27, 2018 until further notice. Motorcycles need caution and reduced speed.
  • Road closure for intersection improvements on Broadway Avenue between Marguerite Road and Locust Road from 6:00 am June 4, 2018 until 6:00 pm September 15, 20018. Select alternate route.
  • Mission Ave will be closed from Flora Rd to Barker Rd for road work beginning June 20, 2018 until October 31, 2018. Select alternate route.
  • City of Spokane - Lane restrictions in both directions of Greene Street at the Ermina Avenue intersection for signalization project until further notice.
  • Spokane County: Starting on Monday, May 14, 2018, Monroe Road will be closed at Dragoon Creek for bridge replacement. Motorist should use other routes. This project is scheduled until Oct. 31st 2018.
  • COS - Spokane Falls Boulevard closed for utility construction from Lincoln to Monroe Streets with a signed detour in place. Lincoln St access to River Park Square parking garage is open.
  • COS Sharp Avenue is closed between Ruby and Hamilton Street for road work beginning June 22 until further notice.
  • City of Spokane - Peaceful Valley Combined Sewer Overflow Project - Starting Monday May 7th, 2018 crews will close N Cedar St from Main to Water Ave and Main Avenue from Monroe to Cedar Streets until further notice for project construction.
Construction Closures
  • Extensive road construction and paving on SR 902 in both directions from MP 5.5 in Medical Lake to MP 12 near I-90, starting June 18th to August 14th. At times there will be piloted cars and detours in some places. Motorists can expect long delays and a 72 hour road closure July 19th to July 22nd. No construction work July 3rd and July 4th. Local businesses will remain accessible.
  • Single lane traffic in both directions on US 2 from Main to Cataldo for bridge work in Spokane beginning at 2:30 am on July 9, 2018 until 5:00 pm July 23rd, 24 hours a day. Motorists can expect very long delays and should consider other routes.
  • City of Spokane - Starting the week of Monday, July 9, Post Street will become a two-way street for one block at City Hall, between Spokane Falls Boulevard and the Mobius Science Center until further notice.
  • Asphalt paving and sidewalk ramp construction is underway. Drivers should expect lane restrictions.
  • US 2 is reduced to one lane in each direction with slow traffic, congestion, and possible delays.
  • COS - Monroe Street is closed between Montgomery and Indiana Avenue for construction for the North Monroe Corridor Project on the south end until further notice.
  • COS - Monroe Street is closed between Kiernan and Dalton Avenue for construction for the North Monroe Corridor Project on the north end until further notice.
  • COS - MLK Jr. Way is closed from Pine to Sherman Street. A detour is in place for the U District Pedestrian Bridge Project until further notice.
  • City of Spokane will have High Drive closed between 29th and 21st streets starting Monday June 11 until further notice. Motorist are advised to seek alternate routes.
  • Spokane County: Improvement of the Bigelow Gulch Corridor connecting Forker Road to Progress Road via a new alignment north of the existing intersection. Look for trucks entering roadway. Expect delays. This work is expected to continue through December 31, 2018.
  • Sprague Ave will have lane restrictions for road work from Sullivan Rd to Corbin Rd beginning June 20, 2018 until August 14, 2018. Expect delays.
  • On SR 17 at the Junction of US 2 north to SR 174-Leahy Junction.
    Tuesday and Wednesday 6 a.m. to 7 p.m. Expect less than 10 minute delays for alternating one-lane flagger/pilot car controlled traffic, intersection flagging, shoulder closures and mobile traffic control for pavement markings.
  • City of Spokane - Paving project on Southeast Boulevard between 29th Avenue and Regal Street. Motorist should expect traffic congestion and delays.
Special Events
  • None reported