Return to Map

LOW IMPACT
US 101 Both Directions - US 101 Bone River Bridge Replacement Project (mileposts 41.7 to 45.32) Traffic impacts: Traffic is reduced to a single, alternating lane with a temporary traffic signal. NOTE: The speed limit on US 101 through the project area is temporarily reduced to 25 mph. Last Updated: 5/17/2013 10:35 AM
From milepost 42 to milepost 46
Report Detail: Project Engineer: Denys Tak, Phone: (360) 442-1341 Find project information at: www.wsdot.wa.gov/projects/us101/boneriverbridge/