MODERATE IMPACT
SR 500 Both Directions -
SR 500, St. Johns Blvd. Interchange (mileposts 0.42 to 1.55)
Monday, May 20 to Friday, May 24: Daytime single lane and shoulder closures on both directions of St. Johns Boulevard and the on- and off-ramps. Daytime single lane closures on 39th, 42nd and 44th Streets. Trucks entering and exiting the work zone. Last Updated: 5/17/2013 10:29 AM
From milepost 0 to milepost 2
Report Detail: Project Engineer: Leon Winger, Phone: (360) 905-1500
Find project information at: http://www.wsdot.wa.gov/projects/sr500/stjohnsinterchange