Return to Map

HIGHEST IMPACT
SR 18 Eastbound - On the SR 18 eastbound off-ramp to northbound SR 167 (MP 3) there is a collision partially blocking the ramp. Last Updated: 7/23/2014 10:52 AM More Info
At milepost 3
HIGH IMPACT
I-5 Both Directions - Wednesday, July 23 - A Seattle Mariners baseball game that begins at 12:40 p.m. at Safeco Field will cause additional congestion on highways leading into Seattle, including I-5, I-90, SR 520 and SR 99. Last Updated: 7/23/2014 7:42 AM More Info
From milepost 162 to milepost 174
HIGH IMPACT
I-90 Westbound - Westbound I-90 is reduced to one through lane at Bellevue Way Southeast through 5 a.m. Friday, July 25 for expansion joint repair. There will be three lanes open from approximately Bellevue Way Southeast to East Mercer Way. Also closed, The Bellevue Way general purpose on-ramp to westbound I-90 closed around-the-clock. All drivers will use the HOV ramp. And, The southbound I-405 HOV ramp to westbound I-90 closed around-the-clock. All drivers will use the general purpose ramp. Last Updated: 7/17/2014 3:27 PM More Info
At milepost 9
HIGH IMPACT
I-90 Westbound - Westbound I-90 will be reduced to one lane at Bellevue Way Southeast from 9:30 p.m. Friday, July 18 until 5 a.m. Friday, July 25 for expansion joint repair work. This is a 24/7, week-long closure. Through 5 a.m. Monday, July 21 the following ramps will also be closed. Bellevue Way S.E. HOV on-ramp to westbound I-90 closed around-the-clock. Drivers will use the general purpose ramp. Southbound I-405 HOV ramp to westbound I-90 closed around-the-clock. Drivers use the general purpose ramp Last Updated: 7/17/2014 11:40 AM More Info
At milepost 9
HIGH IMPACT
I-405 Southbound - Friday, July 18 to the morning of Friday, July 25 - The southbound I-405 HOV ramp to westbound I-90 closed around-the-clock. All drivers will use the general purpose ramp. Last Updated: 7/17/2014 3:37 PM More Info
At milepost 11
HIGH IMPACT
US 101 Southbound - Road work on US 101 southbound from milepost 199.0 near Bedrock Rd to milepost 194.0 near Whitcomb Dimmel Rd beginning at 9:20 am on July 23, 2014 until about 3:00 pm. Last Updated: 7/23/2014 9:26 AM More Info
From milepost 199 to milepost 194
HIGH IMPACT
US 101 Southbound - Road work on US 101 southbound from milepost 314.0 near Williams Ct to milepost 318.0 near Hamma Hamma Rec Area Rd beginning at 8:16 am on July 23, 2014 until about 5:00 pm. Last Updated: 7/23/2014 8:30 AM More Info
From milepost 314 to milepost 318
HIGH IMPACT
US 101 Southbound - Road work on US 101 southbound at milepost 175.8 near Clearwater Honor Camp Rd beginning at 7:24 am on July 23, 2014 until about 6:00 pm. Last Updated: 7/23/2014 7:45 AM More Info
At milepost 176
HIGH IMPACT
SR 7 Both Directions - Road work on SR 7 both directions from milepost 33.0 near Dean Kreger Rd to milepost 34.0 near 384th St E beginning at 5:57 am on July 23, 2014 until about 4:30 pm. Last Updated: 7/23/2014 5:59 AM More Info
From milepost 33 to milepost 34
HIGH IMPACT
SR 8 Westbound - Road work on SR 8 westbound at milepost 18.0 near Wilson Rd beginning at 8:31 am on July 23, 2014 until about 4:00 pm. Last Updated: 7/23/2014 8:38 AM More Info
At milepost 18
HIGH IMPACT
SR 99 Northbound - The annual Seafair Torchlight Run will close the northbound SR 99 top deck of the Alaskan Way Viaduct on Saturday, July 26, 2014 between the West Seattle Freeway and Western Ave from 5:30 p.m. until approximately 7:45 p.m. The runners will be on the top deck from S Royal Brougham Way to the Western Ave exit. Drivers should expect much heavier than normal traffic on the viaduct and on downtown streets following the end of the Torchlight Run and the Torchlight Parade events. Last Updated: 7/22/2014 1:10 PM More Info
From milepost 29 to milepost 32
HIGH IMPACT
SR 104 Westbound - Road work on SR 104 westbound at milepost 12.0 near Shine Rd beginning at 9:51 am on July 23, 2014 until about 3:00 pm. Last Updated: 7/23/2014 9:54 AM More Info
At milepost 12
HIGH IMPACT
SR 108 Both Directions - Road work on SR 108 both directions from milepost 1.1 near Fourth St to milepost 3.0 near Elma Hickland Rd beginning at 9:53 am on July 23, 2014 until about 5:00 pm. Last Updated: 7/23/2014 9:59 AM More Info
From milepost 1 to milepost 3
HIGH IMPACT
SR 109 Both Directions - Road work on SR 109 both directions from milepost 4.0 near Breckenridge Dr to milepost 14.0 near Burrows Rd beginning at 8:09 am on July 23, 2014 until about 4:30 pm. Last Updated: 7/23/2014 8:12 AM More Info
From milepost 4 to milepost 14
HIGH IMPACT
SR 162 Both Directions - Road work on SR 162 both directions at milepost 6.1 near 128th St E beginning at 7:23 am on July 23, 2014 until about 3:00 pm. Last Updated: 7/23/2014 7:28 AM More Info
At milepost 6
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15) Traffic Impacts: Monday, July 21, to Friday, July 25: Daytime and nighttime, intermittent, alternating lane and shoulder closures, in both directions of I-5. Nighttime closures on Mellen St. and Ellsbury St, with flaggers, for drainage work, from 9 p.m. to 6 a.m. Monday, July 21: Nighttime, off-ramp closure, northbound on Mellen Street, from 10 p.m. Monday, July 21 to 5 a.m. Tuesday, July 22. Last Updated: 7/18/2014 10:01 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - Tuesday, July 8 to November - Both directions of I-5 near the Stillaguamish River Bridge have been reduced to two lanes until bridge work is complete in November. Drivers should be prepared for some delays throughout the day. The heaviest northbound congestion is expected Thursdays and Fridays 3-6 p.m., and Saturdays and Sundays 11 a.m. to 4 p.m. The heaviest southbound congestion is expected Sundays 4 to 6 p.m. Drivers should plan for up to 35 minutes of extra travel time during these hours. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
MODERATE IMPACT
I-5 Southbound - All southbound I-5 traffic is reduced to two lanes and will use a new crossover across the median to two lanes of northbound I-5 across the Stillaguamish River Bridge, crossing back over on the other side of the bridge, until the project is complete in November. Northbound I-5 is reduced to two lanes from SR 530 to 236th Street Northeast as well. Drivers should prepare for a 55 mile per hour speed limit in both directions in the work zone. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
MODERATE IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25- The left lane of southbound I-405 between SR 520 and Southeast 8th Street will close nightly from 8 p.m. to 5 a.m. for paving work. Last Updated: 7/17/2014 11:16 AM More Info
From milepost 15 to milepost 13
MODERATE IMPACT
SR 9 Northbound - On SR 9 northbound at 84th St NE (MP 21) the right turn lane is closed due to roadwork. Last Updated: 7/23/2014 8:02 AM More Info
At milepost 21
MODERATE IMPACT
SR 9 Both Directions - Washington State Patrol officers will escort vehicles during filming operations Wednesday and Thursday, July 23 and July 24, 2014, on SR 9 between Cathcart Way and U.S. 2, from 10:00 a.m. and 2:00 p.m. Last Updated: 7/22/2014 12:56 PM More Info
From milepost 6 to milepost 13
MODERATE IMPACT
SR 105 Both Directions - Road work on SR 105 both directions at milepost 40.0 near Gray St beginning at 7:14 am on July 23, 2014 until about 4:30 pm. Last Updated: 7/23/2014 7:17 AM More Info
At milepost 40
MODERATE IMPACT
SR 203 Both Directions - Northbound & southbound traffic is alternating on SR 203 from 203rd St SE (MP 21) to Ben Howard Rd (MP 23) due to roadwork. Last Updated: 7/23/2014 9:11 AM More Info
From milepost 21 to milepost 23
MODERATE IMPACT
SR 410 Both Directions - Eastbound & westbound traffic is alternating on SR 410 just east of Mud Mountain Rd (MP 33) due to maintenance. Last Updated: 7/23/2014 9:09 AM More Info
At milepost 33
MODERATE IMPACT
SR 520 Westbound - Monday, July 21 to the morning of Friday, July 25 - The SR 202 on-ramp to westbound SR 520 will close nightly from 9 p.m. to 5 a.m. for paving work. Last Updated: 7/17/2014 11:06 AM More Info
At milepost 13
MODERATE IMPACT
SR 520 Northbound - Monday, July 21 to the morning of Friday, July 25 - The West Lake Sammamish Parkway on-ramp to westbound SR 520 will close nightly from 9 p.m. to 5 a.m. for paving work. Last Updated: 7/17/2014 11:04 AM More Info
At milepost 12
MODERATE IMPACT
SR 520 Westbound - Monday, July 21 to the morning of Friday, July 25 - Two right lanes of westbound SR 520 between West Lake Sammamish Parkway and Northeast 60th Street will close nightly from 8 p.m. to 5 a.m. for paving work. Last Updated: 7/17/2014 11:02 AM More Info
At milepost 12
MODERATE IMPACT
SR 520 Westbound - Tuesday, July 22 to the morning of Saturday, July 26 - The westbound SR 520 off-ramp to 108th Avenue Northeast will close nightly from 10 p.m. to 5 a.m. for culvert repair. Last Updated: 7/16/2014 2:56 PM More Info
At milepost 6
MODERATE IMPACT
SR 520 Westbound - Monday, June 2 to the morning of Friday, June 6 - The right lane of eastbound and westbound SR 520 between the east highrise and Montlake Boulevard will close nightly from 9 p.m. to 6 a.m. for material delivery and electrical work. Last Updated: 5/29/2014 11:39 AM More Info
From milepost 4 to milepost 1
MODERATE IMPACT
SR 522 Both Directions - Monday, July 21 to the morning of Friday, July 25 - The ramps from SR 522 to 164th Street Southeast will be closed nightly for drainage installation. Westbound will be closed from 7 p.m. to 5 a.m. and eastbound will be closed from 8 p.m. to 5 a.m. A detour will be in place. Last Updated: 7/18/2014 10:23 AM More Info
At milepost 23
MODERATE IMPACT
SR 527 Both Directions - Monday, July 21 to the morning of Friday, July 25 - Up to three lanes in either direction of SR 527 from I-405 to SR 524 will be closed daily from 11 p.m. to 5 a.m. for grinding and paving work. Up to two lanes in either direction of 214th/217th/220th St. SE will also be closed. Lanes will start closing at 9 p.m. Last Updated: 7/17/2014 9:30 AM More Info
From milepost 3 to milepost 4
LOW IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25 – The SR 527 ramp to southbound I-405 will close from 10 p.m. to 5 a.m. nightly for electrical work. Last Updated: 7/21/2014 11:50 AM More Info
At milepost 27
LOW IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25 – The southbound I-405 on-ramp to Northeast 160th Street will close from 11 p.m. to 5 a.m. nightly for sign structure work. Last Updated: 7/21/2014 11:50 AM More Info
At milepost 23
LOW IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25 – The Northeast 160th Street on-ramp to southbound I-405 will close from 8 p.m. to 5 a.m. nightly for electrical work (Brickyard P&R will be accessible by METRO). Last Updated: 7/21/2014 11:49 AM More Info
At milepost 23
LOW IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25 – The Northeast 128th Street on-ramp to southbound I-405 will close from 8 p.m. to 5 a.m. nightly for barrier and electrical work. Last Updated: 7/21/2014 11:49 AM More Info
At milepost 21
LOW IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25 – The southbound I-405 off-ramp to Northeast 128th Street will close from 8 p.m. to 5 a.m. nightly for barrier and electrical work. Last Updated: 7/21/2014 11:48 AM More Info
At milepost 21
LOW IMPACT
I-405 Northbound - Monday, July 21 to the morning of Friday, July 25 – The Northeast 128th Street on-ramp to northbound I-405 will close from midnight to 6 a.m. nightly for barrier and electrical work. Last Updated: 7/21/2014 11:48 AM More Info
At milepost 21
LOW IMPACT
I-405 Northbound - Monday, July 21 to the morning of Friday, July 25 – The northbound I-405 off-ramp to Northeast 128th Street will close from midnight to 6 a.m. nightly for barrier and electrical work. Last Updated: 7/21/2014 11:47 AM More Info
At milepost 21
LOW IMPACT
I-405 Northbound - Monday, July 21 to the morning of Friday, July 25 – The northbound I-405 off-ramp to Northeast 124th Street/Totem Lake Boulevard will close from 10 p.m. to 6 a.m. nightly for electrical work. Last Updated: 7/21/2014 11:46 AM More Info
At milepost 20
LOW IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25 – The Northeast 85th Street on-ramp to southbound I-405 will close from 10 p.m. to 6 a.m. nightly for roadway excavation work. Last Updated: 7/21/2014 11:45 AM More Info
At milepost 18
LOW IMPACT
I-405 Northbound - Monday, July 21 to the morning of Friday, July 25 – The northbound I-405 off-ramp to Northeast 85th Street will close from 10 p.m. to 6 a.m. nightly for electrical work. Last Updated: 7/21/2014 11:45 AM More Info
At milepost 18
LOW IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25 – The southbound I-405 off-ramp to Northeast 85th Street will close from 9 p.m. to 6 a.m. nightly for roadway excavation and paving work. Last Updated: 7/21/2014 11:44 AM More Info
At milepost 18
LOW IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25 – The southbound I-405 off-ramp to Northeast 70th Street will close from 9 p.m. to 6 a.m. nightly for roadway excavation work. Last Updated: 7/21/2014 11:44 AM More Info
At milepost 17
LOW IMPACT
I-405 Northbound - Monday, July 21 to the morning of Friday, July 25 – The Northeast 70th Street on-ramp to northbound I-405 will close from 9 p.m. to 6 a.m. nightly for electrical, survey and sawcutting work. Last Updated: 7/21/2014 11:43 AM More Info
At milepost 17
LOW IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25 – The Northeast 70th Street on-ramp to southbound I-405 will close from 8 p.m. to 6 a.m. nightly for roadway excavation and paving work. Last Updated: 7/21/2014 11:43 AM More Info
At milepost 17
LOW IMPACT
I-405 Northbound - Monday, July 21 to the morning of Friday, July 25 – The northbound I-405 off-ramp to Northeast 70th Street will close from 9 p.m. to 6 a.m. nightly for survey and sawcutting work. Last Updated: 7/21/2014 11:42 AM More Info
At milepost 17
LOW IMPACT
I-405 Northbound - Monday, July 21 to the morning of Friday, July 25 – The eastbound and westbound SR 520 ramps to northbound I-405 will close from 10 p.m. to 4 a.m. nightly for electrical work. Last Updated: 7/21/2014 11:42 AM More Info
At milepost 15
LOW IMPACT
I-405 Northbound - Monday, July 21 to the morning of Friday, July 25 – The northbound I-405 ramp to westbound SR 520 will close from 11 p.m. to 4 a.m. nightly for bridge work. Last Updated: 7/21/2014 11:41 AM More Info
At milepost 15
LOW IMPACT
I-405 Northbound - Monday, July 21 to the morning of Friday, July 25 – The Northeast Eighth Street on-ramp to northbound I-405 will close from 11 p.m. to 5 a.m. nightly for paving work. Last Updated: 7/21/2014 11:41 AM More Info
At milepost 14
LOW IMPACT
I-405 Southbound - Monday, July 21 to the morning of Friday, July 25 – One lane of southbound I-405 between Northeast 85th Street and Northeast 70th Street will close from 7 p.m. to 5 a.m. nightly for roadway excavation work. Last Updated: 7/21/2014 11:39 AM More Info
From milepost 18 to milepost 18
LOW IMPACT
I-405 Northbound - Monday, July 21 to the morning of Friday, July 25 – One lane of northbound I-405 between Northeast Eighth Street and SR 520 will close from 7:30 p.m. to 5 a.m. nightly for paving work. Last Updated: 7/21/2014 11:39 AM More Info
From milepost 14 to milepost 15
LOW IMPACT
SR 6 Both Directions - SR 6, Willapa River Bridge - Bridge Replacement (mileposts 6.86 to 7.26) Traffic Impacts: Monday, July 21 to Thursday, July 24: No scheduled traffic impacts. Thursday, July 3: Starting Thursday, July 3, the speed limit on SR 6 will return to 55 mph. Last Updated: 7/18/2014 9:50 AM More Info
From milepost 7 to milepost 8
LOW IMPACT
SR 9 Both Directions - Monday, July 21 to Friday, July 25 - A single lane of 188th Street Southeast west of SR 9 will be closed from 8 a.m. to 4 p.m. daily for road work. Traffic will be flagged through the closure. Last Updated: 7/17/2014 9:23 AM More Info
At milepost 3
LOW IMPACT
SR 9 Both Directions - Tuesday, July 22 and Wednesday, July 23 - A single lane of SR 9 from 132nd Street Northeast to Highland Drive will be closed from 8 a.m. to 3 p.m. daily for chip seal and sweeping work. A pilot car will help guide traffic through. Last Updated: 7/17/2014 9:00 AM More Info
From milepost 24 to milepost 29
LOW IMPACT
SR 105 Both Directions - SR 105, Smith Creek and North River - Bridge Replacements (mileposts 6.25 to 13.65) Traffic Impacts: Sunday, July 20 to Saturday, July 26: Daytime, intermittent, single-lane closures with flagger. The speed limit is 55 mph in the project area. Last Updated: 7/18/2014 9:43 AM More Info
From milepost 6 to milepost 14
LOW IMPACT
SR 203 Both Directions - Monday, July 21 to Friday, July 25 - A single lane of SR 203 from Monroe to Duvall will be closed from 8:30 a.m. to 3 p.m. for grinding and paving work. Traffic will be flagged through the work zone. Last Updated: 7/17/2014 9:27 AM More Info
At milepost 24
LOW IMPACT
SR 520 Westbound - Monday, July 21 to the morning of Friday, July 25 - The westbound SR 520 off-ramp to Northeast 51st Street will close nightly from 9 p.m. to 5 a.m. for paving work. Last Updated: 7/17/2014 11:05 AM More Info
At milepost 11
LOW IMPACT
SR 522 Both Directions - Monday, July 21 to the morning of Friday, July 25 - A single lane of SR 522 from Fales/Echo Lake Road to US 2 will be closed from 10 p.m. to 4 a.m. nightly for drainage installation. A pilot car will guide traffic through the closure. Last Updated: 7/18/2014 10:25 AM More Info
From milepost 20 to milepost 25
LOWEST IMPACT
I-5 Northbound - I-5, Northbound on-ramp, at the Chamber Way Interchange (milepost 79.0) Thursday, July 24 to Friday, July 25: Daytime, shoulder closures near the Chamber Way interchange, east of the northbound on-ramp, for roadside maintenance. Last Updated: 7/18/2014 10:13 AM More Info
At milepost 79