Return to Map

HIGHEST IMPACT
SR 410 Both Directions - SR 410 west of Chinook Pass is closed to traffic due to fire activity and will remain closed until at least Wednesday. The eastbound closure is at the junction of SR 123 at milepost 65, which is just west of the summit of Chinook Pass. The westbound closure is at Bumping River Road at milepost 88.5. Bumping River Road is closed. Last Updated: 9/18/2017 11:01 PM More Info
From milepost 65 to milepost 89
HIGH IMPACT
US 12 Both Directions - Monday, Sept. 18 to Thursday, Sept. 21: A single-lane in either direction of US 12, between Packwood and White Pass, will be closed daily, from 8 a.m. to 6 p.m., for paving repair work.
NOTE: Drivers should expect delays of up to 20 minutes through the work zone. Last Updated: 9/15/2017 2:32 PM More Info
From milepost 134 to milepost 143
HIGH IMPACT
SR 14 Both Directions - Update - To keep traffic moving on SR 14 through the Columbia River Gorge, weight restrictions will remain in place until both directions of I-84 in Oregon are open. Vehicles over 10,000 GVW are prohibited in both directions of SR 14 between Washougal (milepost 19) and US 197 in Dallesport (milepost 84). Local deliveries are allowed. Last Updated: 9/15/2017 8:57 AM More Info
From milepost 19 to milepost 85
MODERATE IMPACT
US 12 Both Directions - US 12 Rimrock Lake Vicinity milepost 159 to 168: Through Saturday Nov. 11 US-12 traffic is detoured onto Tieton Reservoir Road 24 hours per day, 7 days per week. There is a 10 width restriction in place. Use caution as the detour goes through open range and cattle may be on the roadway. The detour will add approximately 30 minutes to your travel time. Last Updated: 9/19/2017 12:17 PM More Info
From milepost 159 to milepost 168
MODERATE IMPACT
I-82 Both Directions - I-82 milepost 132 Columbia River Bridge: Eastbound traffic is shifted to the westbound Columbia River bridge into Oregon. The eastbound speed limit is reduced to 40 mph. Westbound traffic is reduced to a single lane with a reduced speed limit of 55 mph. Until the end of October approximately 1,000 agriculture trucks a day will be entering from the SR 14 on ramp to I-82 eastbound. Drivers should use caution as slow moving truck merge onto the detour. Last Updated: 9/18/2017 11:06 PM More Info
At milepost 132
MODERATE IMPACT
US 12 Both Directions - US 12 White Pass milepost 151 to 166 Paving: Tuesday Sept. 19 through Friday Sept. 22, traffic should be prepared for alternating one-way traffic control in two separate locations during daytime hours from milepost 166 near Rimrock to milepost 151 near White Pass. Drivers should plan for delays up to 40 minutes during the day. Last Updated: 9/18/2017 11:04 PM More Info
From milepost 151 to milepost 166
MODERATE IMPACT
SR 14 Both Directions - Monday, Sept. 18 to the morning of Saturday, Sept. 23: Drivers on both directions of SR 14, between the intersection of SR 14 and US 97, and Cliffs Road, may be alternated through a single-lane, nightly, from 6 p.m. to 6 a.m., for paving repair work.
NOTE: Drivers should expect delays of up to 20 minutes throughout the work zone. Last Updated: 9/15/2017 2:30 PM More Info
From milepost 101 to milepost 109
MODERATE IMPACT
US 97 Both Directions - Monday, Sept. 18 to the morning of Saturday, Sept. 23: Drivers on both directions of US 97, between Timmer Lane and Kushi Creek, may be alternated through a single-lane nightly, from 6 p.m. to 6 a.m., for paving repair work. Last Updated: 9/15/2017 2:28 PM More Info
From milepost 26 to milepost 32
LOW IMPACT
I-82 Eastbound - I-82 eastbound milepost 24 Selah Creek Bridge: Through Monday Sept. 25, eastbound traffic is reduced to a single lane 24 hours a day, seven days a week. Minimal traffic delays are anticipated. Last Updated: 9/19/2017 7:32 AM More Info
At milepost 24
LOW IMPACT
I-90 Westbound - I-90 westbound milepost 123 to 122: Thursday September 21 from 7 a.m. to 3:30 p.m. the right lane will be closed for a paving operation. Last Updated: 9/19/2017 6:58 AM More Info
From milepost 123 to milepost 122
LOW IMPACT
US 12 Both Directions - US 12 milepost 134 to 142 between Packwood and White Pass paving: Drivers should expect delays of up to 20 minutes through the work zone. Last Updated: 9/18/2017 11:11 PM More Info
From milepost 134 to milepost 142
LOW IMPACT
I-90 Eastbound - Renslow Bridge I-90, milepost 119 to 121: Single lane closure, 24 hrs a day, 7 days a week through Tuesday, Sept. 19, and again from Sept. 25 through Oct. 5. Last Updated: 9/18/2017 11:10 PM More Info
From milepost 119 to milepost 121
LOW IMPACT
SR 24 Both Directions - SR-24 milepost 2 Birchfield Road to milepost 3 Beaudry Road: This week traffic lanes will be shifted to the north while the contractor widens the south side of the highway. No lane closures are anticipated. Last Updated: 9/18/2017 10:55 PM More Info
From milepost 2 to milepost 3
LOW IMPACT
I-90 Westbound - I-90 westbound milepost 125 to 124: Tuesday Sept. 19 from 7 a.m. to 3:30 p.m. the right lane will be closed for a paving operation. Last Updated: 9/18/2017 9:18 PM More Info
From milepost 125 to milepost 124
LOW IMPACT
I-90 Westbound - I-90 westbound milepost 124 to 123: Wednesday Sept. 20 from 7 a.m. to 3:30 p.m. the right lane will be closed for a paving operation. Last Updated: 9/18/2017 9:17 PM More Info
At milepost 124
LOWEST IMPACT
SR 22 Both Directions - SR-22 milepost 34 to milepost 36: Thursday Sept. 21 from 8 a.m. to 4 p.m. each day, there will be flagged traffic control for pavement repair work. This work is weather dependent. Last Updated: 9/19/2017 4:16 PM More Info
From milepost 34 to milepost 36
LOWEST IMPACT
SR 225 Both Directions - SR-225 milepost 1.5 to milepost 3: Thursday Sept. 21 from 8 a.m. to 4 p.m. each day, there will be flagged traffic control for pavement repair work. This work is weather dependent. Last Updated: 9/19/2017 4:13 PM More Info
From milepost 2 to milepost 3
LOWEST IMPACT
SR 225 Both Directions - SR-225 milepost 1.5 to 3 both north and southbound: Tuesday Sept. 19 from 8 a.m. to 4 p.m. there will be a flagged traffic control for pavement sealing work. Last Updated: 9/19/2017 7:27 AM More Info
At milepost 3
LOWEST IMPACT
I-82 Both Directions - I-82 milepost 26 to milepost 31 both east and westbound: Monday Sept. 18 through Thursday Sept. 21 from 6:30 a.m. to 4 p.m. single lane closures for pavement sealing work. Last Updated: 9/19/2017 6:57 AM More Info
From milepost 26 to milepost 31
LOWEST IMPACT
US 97 Both Directions - US 97 milepost 61 to 75: No significant traffic impacts anticipated this week. Last Updated: 9/18/2017 11:06 PM More Info
From milepost 61 to milepost 75
LOWEST IMPACT
SR 240 Both Directions - Tri-Cities Vicinity Paving: No significant traffic impacts anticipated this week. Last Updated: 9/18/2017 11:05 PM More Info
From milepost 31 to milepost 34
LOWEST IMPACT
US 97 Both Directions - US-97 milepost 134 Dolarway Intersection: The intersection is in roundabout configuration, make sure to turn right when entering the roundabout. Last Updated: 9/18/2017 11:04 PM More Info
At milepost 134
LOWEST IMPACT
SR 240 Both Directions - SR-240 milepost 25.5 to milepost 26.5: No significant traffic impacts anticipated this week. Last Updated: 9/18/2017 10:54 PM More Info
From milepost 26 to milepost 27