MODERATE IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08) Traffic Impacts: Sunday, Aug. 24 to Friday, Aug. 29: Daytime and nighttime, single-lane closures on both directions of I-5. Thursday Aug. 21 to Friday, Aug. 29: Daytime traffic is shifted to the left lanes on both directions of I-5, with nighttime, double-lane closures on I-5 northbound. Last Updated: 8/22/2014 10:08 AM More Info
From milepost 20 to milepost 21
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (MP 79.81 to 84.15) Saturday, Aug. 23: Daytime, single-lane closures with flaggers on Mellen Street, from 6 a.m. to 5 p.m. Monday, Aug. 25 to Friday, Aug. 29: Nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Intermittent daytime and nighttime closures and flaggers on Mellen Street and Ellsbury Street. Monday, Aug. 25 to Thursday, Aug. 28: Nighttime, I-5, southbound Mellen Street on and off-ramp closures. Last Updated: 8/22/2014 10:06 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
SR 508 Both Directions - SR 508 to SR 7 - Paving and Sealing Road improvements (mileposts 0.20 to 32.84) Traffic Impacts: Monday, Aug. 25 to Friday, Aug. 29: Daytime, single-lane closures with pilot car for paving and sealing along SR 508, from 7 a.m. to 7 p.m. Last Updated: 8/22/2014 10:40 AM More Info
From milepost 0 to milepost 33
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction Traffic Impacts: SR 508 is restricted to vehicles weighing more than seven tons. Trucks and large passenger vehicles should follow posted detour signs: Eastbound drivers, take Leonard Road to US 12. Westbound drivers, take Cinebar Road to Silver Creek Road/SR 122 to US 12. Last Updated: 3/14/2014 10:53 AM More Info
At milepost 14
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93) Friday, Aug. 22 to Saturday, Aug. 23: Nighttime, single and double-lane closures, on southbound I-5, from 99th Street to NE 39th Street, from 8 p.m. Friday, to 7 a.m. Saturday. Sunday, Aug. 24: Nighttime, single and double-lane closures, on I-5 southbound from NE 99th Street to NE 39th Street, from 8 p.m. Sunday, to 5 a.m. Monday. Last Updated: 8/22/2014 10:42 AM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Friday, Aug. 22 to Monday, Aug. 25: Full-lane closure on SR 501-Pioneer St. between North 45th Avenue and South 56th Place, from 10 p.m. Friday, to 5 a.m. Monday. Monday, Aug. 25 to Friday, Aug. 29: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. Last Updated: 8/22/2014 10:25 AM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46) Traffic Impacts: No scheduled traffic impacts. Last Updated: 8/22/2014 10:22 AM More Info
From milepost 10 to milepost 20
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Aug. 25 to Friday, Aug. 29: Daytime, intermittent, alternating, single-lane closures and rolling slowdowns on both directions of I-205. Monday, Aug. 25 to Friday, Aug. 29: Nighttime, intermittent, alternating, single-lane closures on both directions of I-5 and I-205. From 10 p.m. Monday, to 7 a.m. Friday, on I-5, and from 8 p.m. Monday, to 6 a.m. Friday, on I-205, and single-lane closures on NE 134th St. Last Updated: 8/22/2014 9:11 AM More Info
From milepost 7 to milepost 10
LOW IMPACT
I-205 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Aug. 25 to Friday, Aug. 29: Daytime, intermittent, alternating, single-lane closures and rolling slowdowns on both directions of I-205. Monday, Aug. 25 to Friday, Aug. 29: Nighttime, intermittent, alternating, single-lane closures on both directions of I-5 and I-205. From 10 p.m. Monday, to 7 a.m. Friday, on I-5, and from 8 p.m. Monday, to 6 a.m. Friday, on I-205, and single-lane closures on NE 134th St. Last Updated: 8/22/2014 9:11 AM More Info
From milepost 36 to milepost 38
LOW IMPACT
US 101 Both Directions - US 101 - Middle Nemah River Bridge Replacement (mileposts 33.04 to 33.99) Traffic Impacts: No scheduled traffic impacts. Last Updated: 5/16/2014 9:06 AM More Info
From milepost 33 to milepost 34
LOW IMPACT
US 101 Both Directions - US 101, Astoria Megler Bridge Painting Project (milepost 0.00 to 0.72) – ODOT A 35 mph speed limit through the construction zone will be maintained for the duration of the project. Expect single-lane traffic and 20-minute delays anytime on weekdays and weekends. Last Updated: 1/19/2012 11:49 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 4 Both Directions - SR 4, Ocean Beach Highway Sanitary Sewer Replacement (mileposts 60.3 to 60.8) Sunday, Aug. 24 to Friday, Aug. 29: Daytime, and nighttime, single-lane closures, westbound on Ocean Beach Highway, between Washington Way and 15th Avenue, from 8 p.m. Sunday, Aug, 24 to 10 a.m. Friday, Aug. 29. Last Updated: 8/22/2014 10:35 AM More Info
From milepost 60 to milepost 61
LOW IMPACT
SR 6 Both Directions - SR 6, Willapa River Bridge - Bridge Replacement (mileposts 6.86 to 7.26) Traffic Impacts: Monday, Aug. 25 to Friday, Aug. 29: No scheduled traffic impacts. Last Updated: 8/22/2014 9:55 AM More Info
From milepost 7 to milepost 8
LOW IMPACT
SR 14 Both Directions - SR 14 at Bridge of the Gods (milepost 41.6) Drivers crossing the Bridge of the Gods should expect intermittent delays of up to 20 minutes. Last Updated: 4/4/2014 1:34 PM More Info
At milepost 42
LOW IMPACT
SR 105 Both Directions - SR 105, Smith Creek and North River - Bridge Replacements (mileposts 6.25 to 13.65) Traffic Impacts: Sunday, Aug. 24 to Friday, Aug. 29: Daytime, intermittent, single-lane closures with flagger. The speed limit is 55 mph in the project area. Last Updated: 8/22/2014 9:54 AM More Info
From milepost 6 to milepost 14
LOW IMPACT
SR 411 Both Directions - SR 411, City of Kelso - West Main Street Realignment (mileposts 1.50 to 1.75) Traffic Impacts: Monday, Aug. 18 to Friday, Aug. 22: No scheduled traffic impacts. NOTE: Access on SR 411 between Washington and Grant is now open to through-traffic. The intersection of SR 411 and Main Street/Allen Street is controlled by a four-way stop. Last Updated: 8/15/2014 11:28 AM More Info
From milepost 2 to milepost 2
LOW IMPACT
SR 411 Both Directions - SR 411, City of Castle Rock - Front Avenue Improvement (mileposts 12.6 to 13.2) Traffic Impacts: No scheduled traffic impacts. Last Updated: 12/20/2013 8:44 AM More Info
From milepost 13 to milepost 14
LOW IMPACT
SR 433 Both Directions - SR 433 at the Lewis and Clark Bridge (milepost 0.0) Traffic Impacts: Monday, Aug. 25 to Friday, Aug. 29: No Scheduled traffic impacts. Last Updated: 8/22/2014 9:08 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 502 Both Directions - SR 502 Widening from I-5 to Battle Ground (MP 0.59 to 6.61) Monday, Aug. 25 to Friday, Aug. 29: Multiple, daytime, intermittent, single-lane closures with flaggers, throughout the 6 mile length of the project limits, from 9 a.m. to 3 p.m. daily. Saturday, Aug. 23: Daytime, intermittent, single-lane closures with flaggers, throughout the 6 mile length of the project limits, from 6 a.m. to 2 p.m. Last Updated: 8/22/2014 10:24 AM More Info
From milepost 1 to milepost 7
LOW IMPACT
SR 504 Both Directions - SR 504, Both directions between Hummocks Trail east to Loowit viewpoint (mileposts 45.0 to 52.0) SR 504 has been closed for the winter season starting Saturday, Nov. 16. Last Updated: 11/22/2013 2:34 PM More Info
From milepost 45 to milepost 52
LOW IMPACT
SR 507 Both Directions - SR 507, Yew Street Intersection Improvements (mileposts 0.22 to 0.32) Traffic Impacts: No scheduled traffic impacts. Last Updated: 8/22/2014 10:41 AM More Info
From milepost 0 to milepost 1
LOWEST IMPACT
I-5 Southbound - I-5, Southbound, between SR 500 and Mill Plain (mileposts 1.99 to 1.32) Wednesday, Aug. 27 to Thursday, Aug. 28: Daytime, shoulder closures, for roadside maintenance. Last Updated: 8/22/2014 10:55 AM More Info
From milepost 2 to milepost 2
LOWEST IMPACT
SR 6 Both Directions - SR 6, Rock Creek East and West Bridges - Replacement (mileposts 25.95 to 26.94) Traffic Impacts: Monday, Aug. 18 to Saturday, Aug. 23: Daytime, intermittent, single-lane closures with flaggers from 6 a.m. to 4:30 p.m. for excavation work. Last Updated: 8/15/2014 11:34 AM More Info
From milepost 26 to milepost 27
LOWEST IMPACT
SR 105 Both Directions - SR 105, Both directions, between Park Street and Hammond Road (mileposts 1.40 to 2.0) Tuesday, Aug. 26 to Thursday, Aug. 28: Daytime, single-lane traffic with flaggers and pilot car for paving and roadside maintenance. Last Updated: 8/22/2014 10:49 AM More Info
From milepost 1 to milepost 2
LOWEST IMPACT
SR 401 Both Directions - SR 401, Both directions, between Megler Ferry Landing and Mile Post Marker 3.00 (mileposts 1.70 to 3.21) Monday, Aug. 25 to Friday, Aug. 29: Daytime, single-lane and shoulder closures for roadside maintenance. Last Updated: 8/22/2014 10:48 AM More Info
From milepost 2 to milepost 4
LOWEST IMPACT
SR 411 Both Directions - SR 411 - Huntington Avenue Sidewalk Improvements (mileposts 12.46 to 12.7) Traffic Impacts: Monday, Aug. 18 to Friday, Aug. 22: No scheduled traffic impacts. Last Updated: 8/15/2014 11:28 AM More Info
From milepost 12 to milepost 13