Return to Map

HIGHEST IMPACT
I-5 Northbound - Road work on I-5 northbound from milepost 127.2 near Union Ave to milepost 128.8 near Lakewood City Limits beginning at 9:46 pm on July 30, 2014 until about 4:00 am on July 31, 2014. Last Updated: 7/30/2014 10:00 PM More Info
From milepost 127 to milepost 129
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound from milepost 103.5 near Deschutes Pkwy to milepost 105.0 near Olympia City Limits beginning at 9:25 pm on July 30, 2014 until about 6:00 am on July 31, 2014. Last Updated: 7/30/2014 9:28 PM More Info
From milepost 104 to milepost 105
MODERATE IMPACT
I-5 Northbound - Road work on I-5 northbound at milepost 133.5 near I 705-SR 7-Pacific Ave beginning at 10:58 pm on July 30, 2014 until about 4:00 am on July 31, 2014. Last Updated: 7/30/2014 11:06 PM More Info
At milepost 133
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15) Monday, July 28 to Friday, Aug. 1: Daytime and nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Nighttime closures and flaggers on Mellen Street, from 7 p.m. to 7 a.m. Thursday, July 31 to Friday, Aug. 1: Nighttime, northbound on-ramp on I-5 at MP 77 will be closed, and single-lane closure on I-5 southbound at MP 76.5, from 12 a.m. to Thursday, July 31, to 6 a.m. Friday, Aug. 1. Last Updated: 7/29/2014 12:59 PM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - Monday, July 28 to the morning of Friday, Aug. 1 – One lane of the northbound and southbound I-5 Nooksack River bridges will be closed from 7 p.m. to 5 a.m. for preparation and bridge painting. Drivers should be prepared for slightly narrower lanes. The speed limit through the work zone is reduced from 70 to 60 mph. Last Updated: 7/24/2014 3:03 PM More Info
At milepost 263
MODERATE IMPACT
I-5 Both Directions - Tuesday, July 8 to November - Both directions of I-5 near the Stillaguamish River Bridge have been reduced to two lanes until bridge work is complete in November. Drivers should be prepared for some delays throughout the day. The heaviest northbound congestion is expected Thursdays and Fridays 3-6 p.m., and Saturdays and Sundays 11 a.m. to 4 p.m. The heaviest southbound congestion is expected Sundays 4 to 6 p.m. Drivers should plan for up to 35 minutes of extra travel time during these hours. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
MODERATE IMPACT
I-5 Southbound - All southbound I-5 traffic is reduced to two lanes and will use a new crossover across the median to two lanes of northbound I-5 across the Stillaguamish River Bridge, crossing back over on the other side of the bridge, until the project is complete in November. Northbound I-5 is reduced to two lanes from SR 530 to 236th Street Northeast as well. Drivers should prepare for a 55 mile per hour speed limit in both directions in the work zone. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, mileposts 36.07 to 36.83 and I-5 mileposts 6.95 to 9.51) Sunday, July 27 to Friday, Aug. 1: Daytime and nighttime, alternating, single-lane closures on both directions of I-5 and I-205. Wednesday, July 30: Daytime, and nighttime, double-lane closures, on I-5 northbound, near NE 134th Street. Last Updated: 7/30/2014 2:27 PM More Info
From milepost 7 to milepost 10
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93) Traffic Impacts: Monday, July 28 to Thursday, July 31: Daytime, left and right shoulder closures, on both directions of I-5, from Northeast 39th Street to 99th Street. Thursday, July 31: Nighttime, ramp closures, southbound Main Street on-ramp to the southbound Northeast 39th Street off-ramp, and northbound Northeast 39th Street on-ramp to Main Street off-ramp. Last Updated: 7/25/2014 11:15 AM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Traffic Impacts: Monday, July 28 to Friday, Aug. 1: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. NOTE: There will be intermittent shoulder closures on both directions of I-5 between mileposts 11.47 and 13.82 from Friday, July 11 to Friday, August 15. Last Updated: 7/25/2014 10:55 AM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08) Traffic Impacts: Monday, July 28 to Saturday, Aug. 2: Daytime and nighttime, single-lane closures on both directions of I-5. NOTE: The posted speed limit will be reduced to 60 mph, both directions, throughout the construction zone. Workers will be present and working beyond the shoulder during daylight hours, 7 days a week. Last Updated: 7/25/2014 10:49 AM More Info
From milepost 20 to milepost 21
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46) Traffic Impacts: No scheduled traffic impacts. Last Updated: 7/3/2014 9:12 AM More Info
From milepost 10 to milepost 20