I-5 Northbound - Update 9:48 PM : On the I-5 northbound on-ramp from Mercer St (MP 167) there is a collision partially blocking the ramp. The State Patrol has arrived on the scene. Last Updated: 10/21/2014 9:50 PM More Info
At milepost 167
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound at milepost 125.2 near New York Ave beginning at 8:25 pm on October 21, 2014 until about 5:00 am on October 22, 2014. Last Updated: 10/21/2014 8:27 PM More Info
At milepost 125
HIGH IMPACT
I-5 Northbound - Road work on I-5 northbound from milepost 114.0 near Mcallister Creek to milepost 115.0 near Nisqually beginning at 8:21 pm on October 21, 2014 until about 5:00 am on October 22, 2014. Last Updated: 10/21/2014 8:25 PM More Info
From milepost 114 to milepost 115
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound from milepost 133.5 near I 705-SR 7-Pacific Ave to milepost 132.8 near M St beginning at 8:15 pm on October 21, 2014 until about 6:00 am on October 22, 2014. Last Updated: 10/21/2014 8:21 PM More Info
From milepost 133 to milepost 133
MODERATE IMPACT
I-5 Both Directions - Monday, Oct. 20 to Friday, Oct. 24: A single-lane in both directions of I-5 at the North Fork Lewis River Bridge will be closed around-the-clock for painting work. Last Updated: 10/17/2014 12:57 PM More Info
At milepost 20
MODERATE IMPACT
I-5 Southbound - Monday, Oct. 20 to the morning of Friday, Oct. 24: Southbound I-5 will be reduced to a single-lane near the North Fork Lewis River Bridge nightly from 9:30 p.m. to 5:30 a.m. for painting work. Last Updated: 10/17/2014 12:56 PM More Info
At milepost 20
MODERATE IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08)
Friday, Oct. 17 to the morning of Saturday, Oct. 18: Both direction of I-5 will be reduced to a single lane near the North Fork Lewis River from 10 p.m. to 8 a.m. Saturday, Oct 18 to the morning of Sunday, Oct. 19: Both directions of I-5 near the North Fork Lewis River Bridge will be reduced to a single lane from 11 p.m. to 9 a.m. for bridge painting work. Last Updated: 10/17/2014 12:24 PM More Info
From milepost 20 to milepost 21
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (MP 79.81 to 84.15) Monday, Oct. 20 to Friday, Oct. 24: Drivers should expect possible nighttime delays with single-lane and shoulder closures, on both directions of I-5 through Centralia, for striping work. Monday through Wednesday, from 8 p.m. to 5 a.m. Thursday, from 9 p.m. to 5 a.m. and Friday, from 10 p.m. to 7 a.m. Work is weather dependent. Last Updated: 10/17/2014 12:22 PM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - Sunday, Oct. 19 to the morning of Friday, Oct. 24 – One lane of the northbound and southbound I-5 Nooksack River bridges will be closed from 7 p.m. to 5 a.m. for bridge painting and clean-up. Drivers should be prepared for slightly narrower lanes. The speed limit through the work zone is reduced from 70 to 60 mph. Last Updated: 10/17/2014 8:20 AM More Info
At milepost 263
MODERATE IMPACT
I-5 Southbound - I-5, Southbound, Gee Creek Rest Area Facility Improvements (milepost 12.0)
Traffic Impacts:
The southbound I-5 Gee Creek Rest Area is closed from Sept. 8 until Thanksgiving for facility improvements. Last Updated: 10/10/2014 1:27 PM More Info
At milepost 12
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93)
Friday, Oct. 17 to the morning of Friday, Oct. 24: Drivers should be prepared for occasional, nighttime, intermittent lane and ramp closures on both directions of I-5 between NE 99th and NE 39th Street for paving and striping work nightly from 8 p.m. to 6 a.m. Last Updated: 10/17/2014 1:26 PM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Monday, Oct. 20 to Friday, Oct. 24: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. Last Updated: 10/17/2014 1:03 PM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Oct. 20 to Friday, Oct. 24: Drivers should be prepared for daily daytime intermittent lane closures on Northbound I-205 near Salmon Creek from 6 a.m. to 2 p.m. Last Updated: 10/17/2014 12:04 PM More Info
From milepost 7 to milepost 10