HIGH IMPACT
I-5 Northbound - Road work on I-5 northbound at milepost 132.0 near 38th St beginning at 9:00 pm on September 2, 2014 until about 5:00 am on September 3, 2014. Last Updated: 9/2/2014 9:06 PM More Info
At milepost 132
HIGH IMPACT
I-5 Northbound - Road work on I-5 northbound at milepost 122.7 near Berkeley St / Madigan Amc beginning at 8:00 pm on September 2, 2014 until about 5:00 am on September 3, 2014. Last Updated: 9/2/2014 8:27 PM More Info
At milepost 123
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound from milepost 122.0 near Lakewood to milepost 120.0 near Joint Base Lewis Mcchord beginning at 8:14 pm on September 2, 2014 until about 5:00 am on September 3, 2014. Last Updated: 9/2/2014 8:16 PM More Info
From milepost 122 to milepost 120
MODERATE IMPACT
I-5 Southbound - Tuesday, Sept. 2 to the morning of Friday, Sept. 5 - Up to three right lanes of southbound I-5 between SR 104 and Northeast 185th Street will close nightly from 8 p.m. to 5 a.m. for concrete panel saw cutting. The first lane will close at 8 p.m., the second at 9 p.m., with three lanes closed by 11 p.m. Last Updated: 8/29/2014 4:50 PM More Info
From milepost 177 to milepost 177
MODERATE IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08) Traffic Impacts: Tuesday, Sept. 2 to Friday, Sept. 5: Daytime and nighttime, single-lane closures on both directions of I-5. Tuesday, Sept. 2 to Friday, Sept. 5: Daytime traffic is shifted to the left lanes on both directions of I-5, with nighttime, double-lane closures on I-5 northbound. Last Updated: 8/29/2014 9:13 AM More Info
From milepost 20 to milepost 21
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (MP 79.81 to 84.15) Tuesday, Sept. 2 to Friday, Sept. 5: Nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Around-the-clock, intermittent lane closures with flaggers on Mellen Street and Ellsbury Street, with detours on Ellsbury St. and Marsh Avenue. Tuesday, Sept. 2 to Friday, Sept. 5: Nighttime, northbound and southbound, on and off-ramp closures on Mellen Street, from 10 p.m. to 5 a.m., nightly. Last Updated: 8/29/2014 9:09 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - Tuesday, Sept. 2 to the morning of Friday, Sept. 5 – One lane of the northbound and southbound I-5 Nooksack River bridges will be closed from 7 p.m. to 5 a.m. for preparation and bridge painting. Drivers should be prepared for slightly narrower lanes. The speed limit through the work zone is reduced from 70 to 60 mph. Last Updated: 8/28/2014 1:32 PM More Info
At milepost 263
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93) Tuesday, Sept. 2 to Friday, Sept. 5: No scheduled traffic impacts. Last Updated: 8/29/2014 9:29 AM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Tuesday, Sept. 2 to Friday, Sept. 5: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. Last Updated: 8/29/2014 9:16 AM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Tuesday, Sept. 2 to Friday, Sept. 5: Daytime, intermittent, alternating, single-lane closures and rolling slowdowns on both directions of I-205. Tuesday, Sept. 2 to Friday, Sept. 5: Nighttime, intermittent, alternating, single-lane closures on both directions of I-5 and I-205, from 8 p.m. Tuesday, to 8 a.m. Saturday. Tuesday, Sept. 2 to Friday, Sept. 5: Nighttime, single-lane closures on NE 134th Street. Last Updated: 8/29/2014 8:56 AM More Info
From milepost 7 to milepost 10
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46) Traffic Impacts: No scheduled traffic impacts. Last Updated: 8/22/2014 10:22 AM More Info
From milepost 10 to milepost 20
LOWEST IMPACT
I-5 Southbound - I-5, Southbound, between Fourth Plain BLVD and The Interstate Bridge (mileposts 1.91 to 0.00) Tuesday, Sept. 2 to Friday, Sept. 5: Daytime, intermittent, shoulder closures for roadside maintenance. Last Updated: 8/29/2014 9:35 AM More Info
From milepost 2 to milepost 0