Return to Map

MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 47 to 55: Lane closures Monday night through Saturday both directions 10 p.m. to 9 a.m. Be alert for traffic revisions and lane shifts. Daytime single lane closures Monday through Saturday. Last Updated: 9/20/2014 10:51 AM More Info
From milepost 47 to milepost 55
MODERATE IMPACT
I-90 Both Directions - Rock blasting closures scheduled Monday through Thursday at 6:30 p.m. lasting for one hour or more. During blasts crews will close I-90 eastbound at Gold Creek milepost 56 and westbound at Price Creek milepost 61. There are no services past Exit 53 eastbound or past Exit 70 westbound during blast closures. Last Updated: 9/20/2014 10:43 AM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 56 to 61: Daytime Restrictions: Drivers should prepare for occasional rolling slowdowns both directions, Monday through Friday, during daytime hours.
Nighttime Restrictions: Traffic will be reduced to one lane in both directions, Monday through Friday, during nighttime hours. Last Updated: 9/19/2014 9:05 PM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 61 to 65: Intermittent lane closures Monday through Friday from 10:00 p.m. until 9:00 a.m. the following morning. Last Updated: 9/19/2014 8:59 PM More Info
From milepost 61 to milepost 65
MODERATE IMPACT
I-90 Both Directions - I-90 mileposts 65 to 67: No impacts to traffic this week. Intermittent lane closures Monday through Friday from 10:00 p.m. until 9:00 a.m. the following morning. Last Updated: 9/19/2014 8:59 PM More Info
From milepost 65 to milepost 67
MODERATE IMPACT
I-90 Eastbound - Saturday, Sept. 20 to the morning of Sunday, Sept. 21 - Two right lanes of eastbound I-90 at SR 900 will close from 8 p.m. to 5 a.m. for paving work. Last Updated: 9/10/2014 10:53 AM More Info
At milepost 14
MODERATE IMPACT
SR 9 Both Directions - Friday, September 19 to Monday, September 22 - Both directions of 32nd Street Southeast just west of SR 9 will be closed from 9 p.m. Friday to 5 a.m. Monday for a variety of roadway work. A signed detour will be in place. Last Updated: 9/19/2014 8:12 AM More Info
At milepost 13
MODERATE IMPACT
SR 285 Both Directions - On SR 285-North Wenatchee Avenue on Saturday and Sunday ONLY, 6 a.m. to 1 p.m., expect one of the outside lanes to closed where our Under Bridge Inspection Truck is being used to perform a scheduled structural and safety inspection of the bridges over the Wenatchee River at the north end of town. Last Updated: 9/19/2014 4:39 PM More Info
From milepost 4 to milepost 5
MODERATE IMPACT
SR 522 Westbound - Saturday, September 20 to the morning of Sunday, September 21: The ramp from westbound SR 522 to 164th Street will be closed from 10 p.m. to 9 a.m. for paving work. Last Updated: 9/19/2014 11:12 AM More Info
At milepost 23
MODERATE IMPACT
SR 522 Both Directions - Saturday, September 20 to the morning of Sunday, September 21 - SR 522 will be reduced to one lane between US 2 and Fales/Echo Lake roads from 10 p.m. to 9 a.m. for paving work. A pilot car will lead traffic through the open lane. Last Updated: 9/18/2014 1:17 PM More Info
From milepost 25 to milepost 19
MODERATE IMPACT
SR 522 Both Directions - **DRIVER ALERT**Tuesday, September 2 to the morning of Wednesday, October 1 - The ramp from SR 522 to eastbound US 2 will be closed around-the-clock from 10 p.m. Tuesday, September 2 to 5 a.m. Wednesday, October 1 for work on the 179th Bridge. Drivers will follow a signed detour. Last Updated: 8/29/2014 10:38 AM More Info
At milepost 25
LOW IMPACT
I-90 Both Directions - Bicycle Alternate Route: I-90 is closed to bicycles in both directions between Hyak (Exit 54) and Stampede Pass interchange (exit 62) because there is no shoulder for bicycles to use. Bicyclists can use the John Wayne Pioneer Trail, weather permitting, as an alternate route. Last Updated: 9/20/2014 4:03 AM More Info
From milepost 54 to milepost 62
LOW IMPACT
US 2 Both Directions - On US 2 east of the Stevens Pass summit, the paving is complete. Monday through Friday, 6 a.m. to 8 p.m., expect lane shifts for shoulder finishing, raising survey monuments, installing guideposts and other work.
Speed is still reduced to 45 and when necessary, bicyclists and pedestrians will continue be bussed around the work zone. Last Updated: 9/19/2014 4:28 PM More Info
From milepost 64 to milepost 72
LOW IMPACT
SR 410 Both Directions - SR 410 mileposts 69 to 71, east of Chinook Pass summit: Monday, Sept. 22 through Thursday, Sept. 25, 7 a.m. to 5:30 p.m., motorists can expect 30 minute delays. No work is scheduled Friday through Sunday. Motorist can access US 12 and SR 123 as alternate routes. Last Updated: 9/19/2014 8:57 PM More Info
From milepost 69 to milepost 71
LOWEST IMPACT
I-90 Westbound - Maintenance/Utility Operations: I-90 westbound milepost 50, Denny Creek Bridge: Monday, Sept. 22 through Thursday, Sept. 25, from 7:30 a.m. to 4 p.m. the right lane will be closed for bridge maintenance. Last Updated: 9/20/2014 10:52 AM More Info
At milepost 50
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations:
US 12 milepost 143: Monday, Sept. 22 through Wednesday, Sept. 24, during daylight hours, expect single lane closures for utility crew work on the bridge. Last Updated: 9/20/2014 11:34 PM More Info
At milepost 143
LOWEST IMPACT
US 12 Northbound - Clear Creek Falls Viewpoint – Rock fall Mesh Repair
US 12 – Milepost 154.42 to Milepost 154.45
Current Week Traffic Advisory: Friday, Sept. 19 through Wednesday, Sept. 24, and Saturday, Sept. 27, 7 a.m. to 5:30 p.m., motorist can expect 30 minute delays Last Updated: 9/20/2014 4:17 AM More Info
At milepost 154