Return to Map

HIGH IMPACT
SR 104 Both Directions - From 11 p.m. to 4 a.m. each weeknight through Saturday morning, July 29, construction crews will intermittently close the SR 104 Hood Canal Bridge to vehicular traffic. During the five-hour timeframes, crews will open the bridge to traffic several times to ease congestion. The traffic openings will be unscheduled and performed as workloads allow.
http://bit.ly/2rqfS4r Last Updated: 7/25/2017 3:45 PM More Info
From milepost 15 to milepost 16