Return to Map

HIGH IMPACT
SR 241 Both Directions - SR 241 milepost 1: Roadway is closed to all traffic until repairs to bridge are completed. State Route 223 to State Route 22 is the alternate route. As well as a signed detour route utilizing local roads. Last Updated: 7/25/2014 9:54 AM More Info
At milepost 1
MODERATE IMPACT
US 97 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23, SR 14 mileposts 100.5 to 102.0) Traffic Impacts: Monday, July 28 to Thursday, July 31: Daytime, single-lane closures, with flaggers. Last Updated: 7/25/2014 11:09 AM More Info
From milepost 2 to milepost 3
MODERATE IMPACT
SR 14 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23 and SR 14 mileposts 100.5 to 102.0) Traffic Impacts: Monday, July 28 to Thursday, July 31: Daytime, single-lane closures, with flaggers. Last Updated: 7/25/2014 11:08 AM More Info
From milepost 100 to milepost 102
MODERATE IMPACT
US 197 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 MP 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, July 28 to Friday, Aug. 1: Daytime, intermittent, single-lane closures with flaggers and pilot car, on SR 14, SR 141 and SR 141 Spur. Monday, July 28 to Tuesday, July 29: Nighttime, full-lane closures, both directions of SR 14, between mileposts 76 to 81 from 8 p.m. Monday July 28 to 6 a.m. Tuesday, July 29. Last Updated: 7/25/2014 2:19 PM More Info
From milepost 1 to milepost 4
MODERATE IMPACT
SR 410 Both Directions - 0.47 Miles to 1.45 Miles East of Chinook Pass – Rock Scaling SR 410, MP 69 to MP 71 Current Week Traffic Advisory: SR 410, 0.47 miles to 1.45 miles east of Chinook Pass summit: Monday, July 28 through Friday August 1, motorists can expect 30 minute delays between the hours of 6 a.m. to 4:30 p.m. Mon through Thur and from 6 a.m. to noon on Fridays. No work scheduled Saturdays and Sundays. Motorist can access US 12 and SR 123 as alternate routes. Last Updated: 7/25/2014 11:57 AM More Info
From milepost 69 to milepost 71
LOW IMPACT
SR 14 Both Directions - SR 14 at Bridge of the Gods (milepost 41.6) Drivers crossing the Bridge of the Gods should expect intermittent delays of up to 20 minutes. Last Updated: 4/4/2014 1:34 PM More Info
At milepost 42
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations: US 12 milepost 133 to 134, milepost 153 to 154, and milepost 165 to 166: Monday, July 28 through Friday Aug. 1, during daylight hours, traffic will be reduced to one lane for bridge maintenance. Work will only be performed at one location at a time. Last Updated: 7/25/2014 2:31 PM More Info
From milepost 133 to milepost 166
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations: US 12 milepost 199 to milepost 198.4 in both directions: Monday, July 28 through Wednesday, July 30, 8:30 a.m. to 3:30 p.m., traffic will be reduced to one lane for bridge maintenance. Work will only be performed at one location at a time. Traffic control will consist of signs, cones, barrels and VMS messaging to direct traffic flow. Last Updated: 7/25/2014 11:14 AM More Info
From milepost 199 to milepost 199
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations: US 12 milepost 166 to milepost 151, Monday through Thursday during daylight hours, WSDOT crews will be grinding areas of pavement with alternating one lane traffic control. Drivers can expect possible 30 minute delays. Last Updated: 7/25/2014 9:53 AM More Info
From milepost 166 to milepost 151
LOWEST IMPACT
SR 142 Both Directions - SR 142, Both directions, between Fisher Hill Road and Horseshoe Bend Road (mileposts 3.0 to 15.0) Monday, July 28 to Thursday, July 31: Daytime, single-lane and shoulder closures with flagger for roadside and ditch maintenance. Last Updated: 7/25/2014 11:17 AM More Info
From milepost 3 to milepost 15