Return to Map

HIGHEST IMPACT
SR 123 Both Directions - SR 123 Cayuse Pass (elev. 4,675 feet) is closed for the season within the boundaries of Mount Rainier National Park between Crystal Mountain Boulevard and the Stevens Canyon Road entrance. Last Updated: 11/17/2017 10:27 AM More Info
From milepost 3 to milepost 17
MODERATE IMPACT
I-82 Both Directions - I-82 milepost 132 Columbia River Bridge: Eastbound traffic is shifted to the westbound Columbia River bridge into Oregon. The speed limit is reduced to 40 mph. Westbound traffic is reduced to a single lane. Last Updated: 11/20/2017 8:00 AM More Info
At milepost 132
MODERATE IMPACT
US 12 Both Directions - US-12 Rimrock Lake Vicinity milepost 159 to 168: – US-12 east of White Pass is now open to traffic in both directions. Since September, traffic was detoured around Rimrock Lake while contractor crews scaled rocks above the slopes near the Rimrock Tunnel. Last Updated: 11/20/2017 8:00 AM More Info
From milepost 159 to milepost 168
MODERATE IMPACT
SR 410 Both Directions - SR 410 Chinook Pass (elev. 5,430 feet) is closed for the season between Crystal Mountain Boulevard, about 12 miles northwest of the summit, and Morse Creek, five miles east of the summit for the season. Last Updated: 11/20/2017 8:00 AM More Info
From milepost 57 to milepost 74
MODERATE IMPACT
I-82 Eastbound - Rest Area on I-82 eastbound at milepost 25 is closed until further notice due to a water line repair. Last Updated: 11/20/2017 7:59 AM More Info
At milepost 25
LOW IMPACT
SR 240 Both Directions - SR 240 milepost 26 between Twin Bridges and Kingsgate: Monday Nov. 20 through Wednesday Nov. 22 from 7:30 a.m. to 4 p.m., drivers can expect intermittent single lane closures. Last Updated: 11/20/2017 8:11 AM More Info
At milepost 26
LOW IMPACT
US 12 Both Directions - US 12 both directions milepost 200 near 40th Ave interchange: Monday Nov. 20 during day light hours, drivers can expect signal lane closures as crew install new traffic signs.
Tuesday Nov. 21, traffic will be directed to the off and on ramps at 16th Ave. has crew install new signs on the 16th Ave. overpass. Last Updated: 11/20/2017 8:00 AM More Info
At milepost 200
LOW IMPACT
I-82 Both Directions - I-82 milepost 55 to milepost 59 both directions: Tuesday Nov. 21 between 9 a.m. and 3 p.m. drivers may experience rolling slowdowns as crew install overhead power lines across the highway. This is a Pacific Power project, and their contractor crews are replacing overhead power lines crossing I-82 west of the I-82 - SR 223/Van Belle Road - Exit 58 Interchange. Last Updated: 11/20/2017 7:59 AM More Info
From milepost 55 to milepost 59