Return to Map

HIGHEST IMPACT
I-5 Southbound - Update 8:31 AM : On the I-5 southbound on-ramp from SR599 (MP 156) there is a collision blocking the right lane. Medical Aid, Fire Assistance, the Incident Response Team, Tow Assistance, and the State Patrol have arrived on the scene. Last Updated: 7/7/2015 8:32 AM More Info
At milepost 156
HIGH IMPACT
I-5 Both Directions - Tuesday, July 7 – A Seattle Mariners game that begins at 7:10 p.m. at Safeco Field will cause additional congestion on highways leading into Seattle, including I-5, I-90, SR 520 and SR 99. Last Updated: 6/29/2015 6:15 PM More Info
From milepost 162 to milepost 174
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15)
Traffic Impacts: Monday, July 6 to the morning of Friday, July 10: A single-lane of the southbound I-5 off-ramp to Harrison Avenue will be closed nightly, from 8 p.m. to 6 a.m. for excavation, paving and striping work. Last Updated: 7/2/2015 2:26 PM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15)
Traffic Impacts: Monday, July 6 to the morning of Thursday, July 9: Drivers can expect intermittent single-lane closures in both directions of I-5 between Chamber Way and Harrison Avenue nightly from 8 p.m. until 5 a.m. for excavation, embankment, illumination, paving and guardrail work. Last Updated: 7/2/2015 2:26 PM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15)
Traffic Impacts: Thursday, July 9 to the morning of Friday, July 10: Drivers can expect intermittent, single-lane closures on both directions of I-5 between Chamber Way and Harrison Avenue, nightly, from 9 p.m. to 5 a.m., for excavation, embankment, illumination, paving and guardrail work. Last Updated: 7/2/2015 2:23 PM More Info
From milepost 80 to milepost 85
LOW IMPACT
I-5 Southbound - Tuesday, July 7 - The on-ramp from Samish Way to southbound I-5 will be closed from 8 a.m. to 4 p.m. for guardrail repair. A signed detour will be in place. Last Updated: 7/6/2015 10:05 AM More Info
At milepost 252
LOW IMPACT
I-5 Northbound - I-5: Clark County - Discovery Corridor Wastewater Transmission System (milepost 10.75)
Traffic Impacts: Monday, July 6 to morning of Friday, July 10: Up to two lanes of northbound I-5 will be closed between Northeast 179th Street and SR 502 from 9 p.m. to 5 a.m. nightly for sewer line installation work. Last Updated: 7/2/2015 2:34 PM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15)
Traffic Impacts: Friday, July 10 to the morning of Saturday, July 11: Drivers can expect intermittent, single-lane closures on both directions of I-5 between Chamber Way and Harrison Avenue, nightly, from 10 p.m. to 5 a.m., for excavation, embankment, illumination, paving and guardrail work. Last Updated: 7/2/2015 2:27 PM More Info
From milepost 80 to milepost 85
LOW IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15)
Traffic Impacts: Monday, July 6 to the morning of Friday, July 10: A single-lane on the Mellen Street couplet bridge will be closed, from 7 p.m. to 7 a.m., for striping work. Last Updated: 7/2/2015 2:27 PM More Info
From milepost 80 to milepost 85
LOW IMPACT
I-5 Both Directions - Monday, July 6 to the morning of Friday, July 10 - A single lane in each direction of I-5 near Main Street will be closed from 7 p.m. to 6 a.m. nightly for bridge painting. Last Updated: 7/2/2015 10:50 AM More Info
From milepost 263 to milepost 264
LOW IMPACT
I-5 Southbound - Monday, July 6, to the morning of Friday, July 10 - The southbound I-5 off-ramps to Southcenter Boulevard and SR 518/Sea-Tac Airport will be closed from 11 p.m. to 5 a.m. for paving work. Last Updated: 7/1/2015 5:23 PM More Info
At milepost 155
LOW IMPACT
I-5 Southbound - Monday, July 6, to the morning of Friday, July 10 - Up to four right lanes of southbound I-5 from SR 104/Northeast 205th Street to Northeast 117th Street will be closed from 7 p.m. to 5 a.m. nightly for electrical and permanent striping work. Last Updated: 7/1/2015 5:06 PM More Info
From milepost 177 to milepost 174
LOW IMPACT
I-5 Northbound - Monday, July 6 - The left lane of northbound I-5 near Bow Hill Road will be closed from 9 a.m. to 3 p.m. for guardrail repair. Last Updated: 7/1/2015 2:01 PM More Info
From milepost 235 to milepost 236