Return to Map

HIGHEST IMPACT
I-5 Northbound - Update 5:19 PM : On I-5 northbound just south of Lake City Way / SR 522 (MP 170) there is a collision blocking the 2 right lanes. Fire Assistance has arrived on the scene. Last Updated: 8/1/2014 5:21 PM More Info
At milepost 170
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15) Monday, Aug. 4 to Friday, Aug. 8: Daytime and nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Nighttime closures and flaggers on Mellen Street and Ellsbury Street. Monday, Aug. 4 to Friday, Aug. 8: Nighttime, on and off-ramp closures on both directions of Mellen Street, from 10 p.m. Monday, Aug. 4 to 6 a.m. Friday, Aug. 8. Last Updated: 8/1/2014 9:19 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - Tuesday, July 8 to November - Both directions of I-5 near the Stillaguamish River Bridge have been reduced to two lanes until bridge work is complete in November. Drivers should be prepared for some delays throughout the day. The heaviest northbound congestion is expected Thursdays and Fridays 3-6 p.m., and Saturdays and Sundays 11 a.m. to 4 p.m. The heaviest southbound congestion is expected Sundays 4 to 6 p.m. Drivers should plan for up to 35 minutes of extra travel time during these hours. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
MODERATE IMPACT
I-5 Southbound - All southbound I-5 traffic is reduced to two lanes and will use a new crossover across the median to two lanes of northbound I-5 across the Stillaguamish River Bridge, crossing back over on the other side of the bridge, until the project is complete in November. Northbound I-5 is reduced to two lanes from SR 530 to 236th Street Northeast as well. Drivers should prepare for a 55 mile per hour speed limit in both directions in the work zone. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93) Monday, Aug. 4 to Wednesday, Aug. 6: Daytime, and nighttime, single and double-lane closures, with intermittent shoulder closures, on northbound I-5, from Northeast 39th Street to 99th Street, from 10 p.m. Monday, to 7 a.m. Wednesday. Thursday, Aug. 7 to Friday, Aug. 8: Nighttime, single and double-lane closures on I-5, northbound, from 10 p.m. Thursday, to 7 a.m. Friday. Last Updated: 8/1/2014 9:55 AM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Friday, Aug. 1 to Monday, Aug. 4: Nighttime, full-lane closure of the left, southbound lane on I-5, between mileposts 13.74 to 12.88, Friday, from 9 p.m. to 8 a.m., Saturday, from 7 p.m. to 9 am., Sunday, 9 p.m. to 6 a.m. Monday, Aug. 4 to Friday, Aug. 8: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. Last Updated: 8/1/2014 9:31 AM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08) Traffic Impacts: Monday, Aug. 1 to Saturday, Aug. 9: Daytime and nighttime, single-lane closures on both directions of I-5. NOTE: The posted speed limit will be reduced to 60 mph, both directions, throughout the construction zone. Workers will be present and working beyond the shoulder during daylight hours, 7 days a week. Last Updated: 8/1/2014 9:20 AM More Info
From milepost 20 to milepost 21
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, mileposts 36.07 to 36.83 and I-5 mileposts 6.95 to 9.51) Sunday, Aug. 3 to Wednesday, Aug. 6: Nighttime, alternating single-lane closures on both directions of I-205 and I-5. Sunday, Aug. 3 to Wednesday, Aug. 6: Nighttime, ramp closures, both on and off-ramps at NE 134th Street and I-205, and both on-and off-ramps at NE 139th Street and I-5. Last Updated: 8/1/2014 8:26 AM More Info
From milepost 7 to milepost 10
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46) Traffic Impacts: No scheduled traffic impacts. Last Updated: 7/3/2014 9:12 AM More Info
From milepost 10 to milepost 20