Return to Map

MODERATE IMPACT
I-5 Both Directions - Monday, Aug. 25 to the morning of Friday, Aug. 29 – One lane of the northbound and southbound I-5 Nooksack River bridges will be closed from 7 p.m. to 5 a.m. for preparation and bridge painting. Drivers should be prepared for slightly narrower lanes. The speed limit through the work zone is reduced from 70 to 60 mph. Last Updated: 8/22/2014 10:59 AM More Info
At milepost 263
MODERATE IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08) Traffic Impacts: Sunday, Aug. 24 to Friday, Aug. 29: Daytime and nighttime, single-lane closures on both directions of I-5. Thursday Aug. 21 to Friday, Aug. 29: Daytime traffic is shifted to the left lanes on both directions of I-5, with nighttime, double-lane closures on I-5 northbound. Last Updated: 8/22/2014 10:08 AM More Info
From milepost 20 to milepost 21
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (MP 79.81 to 84.15) Saturday, Aug. 23: Daytime, single-lane closures with flaggers on Mellen Street, from 6 a.m. to 5 p.m. Monday, Aug. 25 to Friday, Aug. 29: Nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Intermittent daytime and nighttime closures and flaggers on Mellen Street and Ellsbury Street. Monday, Aug. 25 to Thursday, Aug. 28: Nighttime, I-5, southbound Mellen Street on and off-ramp closures. Last Updated: 8/22/2014 10:06 AM More Info
From milepost 80 to milepost 85
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93) Friday, Aug. 22 to Saturday, Aug. 23: Nighttime, single and double-lane closures, on southbound I-5, from 99th Street to NE 39th Street, from 8 p.m. Friday, to 7 a.m. Saturday. Sunday, Aug. 24: Nighttime, single and double-lane closures, on I-5 southbound from NE 99th Street to NE 39th Street, from 8 p.m. Sunday, to 5 a.m. Monday. Last Updated: 8/22/2014 10:42 AM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Friday, Aug. 22 to Monday, Aug. 25: Full-lane closure on SR 501-Pioneer St. between North 45th Avenue and South 56th Place, from 10 p.m. Friday, to 5 a.m. Monday. Monday, Aug. 25 to Friday, Aug. 29: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. Last Updated: 8/22/2014 10:25 AM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46) Traffic Impacts: No scheduled traffic impacts. Last Updated: 8/22/2014 10:22 AM More Info
From milepost 10 to milepost 20
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Aug. 25 to Friday, Aug. 29: Daytime, intermittent, alternating, single-lane closures and rolling slowdowns on both directions of I-205. Monday, Aug. 25 to Friday, Aug. 29: Nighttime, intermittent, alternating, single-lane closures on both directions of I-5 and I-205. From 10 p.m. Monday, to 7 a.m. Friday, on I-5, and from 8 p.m. Monday, to 6 a.m. Friday, on I-205, and single-lane closures on NE 134th St. Last Updated: 8/22/2014 9:11 AM More Info
From milepost 7 to milepost 10
LOWEST IMPACT
I-5 Southbound - I-5, Southbound, between SR 500 and Mill Plain (mileposts 1.99 to 1.32) Wednesday, Aug. 27 to Thursday, Aug. 28: Daytime, shoulder closures, for roadside maintenance. Last Updated: 8/22/2014 10:55 AM More Info
From milepost 2 to milepost 2