MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass rock blasting closure scheduled Wednesday has been cancelled. Closure Thursday starting at 7 p.m. and lasting one hour or more. During blasting closures eastbound traffic will stopped at Gold Creek milepost 56, and westbound traffic will be stopped at milepost 62, Cabin Creek. No services are available past exit 53 eastbound and exit 70 westbound during blasting closures. Last Updated: 5/4/2016 9:22 AM More Info
From milepost 56 to milepost 62
MODERATE IMPACT
I-90 Westbound - Right Lane Closure on I-90 westbound at milepost 68 for WSDOT maintenance work. Last Updated: 5/4/2016 7:05 AM More Info
At milepost 68
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 57 to 60: Daytime: Monday through Friday noon, drivers should prepare for intermittent rolling slowdowns and possible added travel time in both directions. Nighttime: Monday night May 2 through Saturday morning May 7, eastbound traffic will be reduced to one lane each night. Motorists may experience added travel time and delays. I-90 is closed to bicycles in both directions between the Hyak interchange (Exit 54) and Stampede Pass interchange (exit 62). Last Updated: 5/2/2016 9:38 AM More Info
From milepost 57 to milepost 60
MODERATE IMPACT
I-90 Westbound - I-90 Oakes Ave Interchange to Peoh Rd. mileposts 84 to 87: Westbound traffic will be reduced to one lane 24 hours per day, weekdays. Both lanes will be open on the weekends. Westbound Oaks Ave. Exit 84 will be closed Monday through Friday. In mid May to mid June, Oaks Ave will be closed 24 hours per day. Drivers can access Cle Elum via the Peoh Road Bridge interchange at exit 85. Westbound on ramp at MP 85 will be closed during the same time frame. Last Updated: 5/2/2016 8:36 AM More Info
From milepost 84 to milepost 87
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 62 to 69 Snoqualmie Pass Wildlife Bridge: Motorists will encounter night time lane closures Monday thru Thursday in both directions of travel. Minor delays should be anticipated.
Scheduled rock blasting-related closure:
Tuesday, May 3 through Thursday, May 5. Starting a 7 p.m., traffic will be stopped eastbound at milepost 56 near Gold Creek and westbound at milepost 63 near Cabin Creek for rock blasting. Last Updated: 5/1/2016 8:45 PM More Info
From milepost 62 to milepost 69
MODERATE IMPACT
I-90 Eastbound - Tuesday, May 3, to the morning Friday, May 6 – The northbound Rainier Avenue South on-ramp to eastbound I-90 will be closed from 9 p.m. to 5 a.m. nightly for construction work. A signed detour will be in place. Last Updated: 4/28/2016 10:33 PM More Info
At milepost 3
MODERATE IMPACT
I-90 Eastbound - Sunday, May 1, to the morning of Friday, May 6 – Two right lanes of eastbound I-90 from I-5 to Rainier Avenue South will be closed from 9 p.m. to 5 a.m. nightly for construction work. Last Updated: 4/28/2016 10:33 PM More Info
From milepost 0 to milepost 3
MODERATE IMPACT
I-90 Eastbound - Sunday, May 1, to the morning of Friday, May 6 – Two right lanes of eastbound I-90 in the Mount Baker Tunnel will be closed from 9 p.m. to 5 a.m. nightly for construction work. Last Updated: 4/28/2016 10:33 PM More Info
From milepost 4 to milepost 5
LOW IMPACT
I-90 Eastbound - I-90 milepost 137 Vantage Bridge: Both east and westbound: Daytime width restriction of 14’ from 6 a.m. to 8 p.m. Expect one lane to be closed as crews install containment nets above the roadway. Last Updated: 5/2/2016 8:31 AM More Info
At milepost 137
LOWEST IMPACT
I-90 Eastbound - I-90 milepost 63 Eastbound: No impacts to traffic other than shoulder closures. No delays are anticipated. Last Updated: 5/4/2016 1:20 AM More Info
At milepost 63
LOWEST IMPACT
I-90 Eastbound - I-90 milepost 67 to 69 Eastbound: Work will resume in Spring of 2016. Last Updated: 5/4/2016 1:20 AM More Info
From milepost 67 to milepost 69
LOWEST IMPACT
I-90 Westbound - I-90 westbound milepost 34 to milepost 37: Monday, May 2 to Friday, May 6 between the hours of 6 a.m. and 4:30 p.m., the right two lanes will be closed for concrete panel replacement. During the evening hours beginning at 4:30 p.m. the double lane closure will be reduced to a single lane closure. Last Updated: 5/4/2016 1:16 AM More Info
From milepost 34 to milepost 37
LOWEST IMPACT
I-90 Eastbound - I-90 eastbound milepost 47 to milepost 52 Monday, May 2 to Thursday, May 5 between the hours of 6 a.m. and 4:30 p.m., there will be a mobile sweeping operation on the left shoulder. Last Updated: 5/4/2016 1:15 AM More Info
From milepost 47 to milepost 52
LOWEST IMPACT
I-90 Both Directions - I-90 Elk Heights Vicinity both directions: Monday through Friday during the day, traffic will be reduced to one lane. Traffic delays are not anticipated. Last Updated: 5/4/2016 1:15 AM More Info
From milepost 87 to milepost 93
LOWEST IMPACT
I-90 Eastbound - I-90 eastbound milepost 52 to milepost 56: Monday, May 2 to Thursday, May 5 from 6 a.m. to 4:30 p.m., there will be a right lane closure each day for catch basin cleaning. Last Updated: 5/4/2016 1:14 AM More Info
From milepost 52 to milepost 56
LOWEST IMPACT
I-90 Westbound - I-90 westbound milepost 62 to 64: Work to begin the summer of 2016. Last Updated: 5/1/2016 8:43 PM More Info
From milepost 62 to milepost 64