Return to Map

LOW IMPACT
SR 397 Both Directions - SR 397 Cable Bridge, milepost 18: Monday, April 24 through Wednesday, May 3, Traffic across the cable bridge will be shifted to one side of the bridge to allow the contractor to remove all the asphalt off half of the bridge, complete deck repair, install a water proofing membrane and pave new HMA. Traffic will be reduced to one lane in each direction and shifted onto the southbound side of the bridge until May 3. Drivers should use caution and expect minor delays over the bridge. Last Updated: 4/28/2017 7:55 AM More Info
At milepost 18