Travel Alerts South West Washington

Travel Alerts
MODERATE IMPACT
I-5
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15) Traffic Impacts: Monday, July 28 to Friday, Aug. 1: Daytime and nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Nighttime closures and flaggers on Mellen Street, from 7p.m. to 7 a.m. Drivers should follow signed detours between Ellsbury Street South and Marsh Avenue.
Last Updated: 7/25/2014 10:47 AM
From milepost 80 to milepost 85 More
LOW IMPACT
I-5
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93) Traffic Impacts: Monday, July 28 to Thursday, July 31: Daytime, left and right shoulder closures, on both directions of I-5, from Northeast 39th Street to 99th Street. Thursday, July 31: Nighttime, ramp closures, southbound Main Street on-ramp to the southbound Northeast 39th Street off-ramp, and northbound Northeast 39th Street on-ramp to Main Street off-ramp.
Last Updated: 7/25/2014 11:15 AM
From milepost 2 to milepost 5 More
LOW IMPACT
I-5
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Traffic Impacts: Monday, July 28 to Friday, Aug. 1: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. NOTE: There will be intermittent shoulder closures on both directions of I-5 between mileposts 11.47 and 13.82 from Friday, July 11 to Friday, August 15.
Last Updated: 7/25/2014 10:55 AM
At milepost 11 More
LOW IMPACT
I-5
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08) Traffic Impacts: Monday, July 28 to Saturday, Aug. 2: Daytime and nighttime, single-lane closures on both directions of I-5. NOTE: The posted speed limit will be reduced to 60 mph, both directions, throughout the construction zone. Workers will be present and working beyond the shoulder during daylight hours, 7 days a week.
Last Updated: 7/25/2014 10:49 AM
From milepost 20 to milepost 21 More
LOW IMPACT
I-5
I-5 Both Directions - Salmon Creek Interchange Project (I-205, mileposts 36.07 to 36.83 and I-5 mileposts 6.95 to 9.51) Monday, July 28 to Friday, Aug. 1: Daytime, alternating, single-lane closures, northbound on I-205. Sunday, July 27 to Thursday, July 31: Nighttime, alternating single-lane closures on both directions of I-205 and I-5. Monday, July 28, off-ramp closure, southbound on I-205 to the NE 134th Street on-ramp.
Last Updated: 7/25/2014 10:38 AM
From milepost 7 to milepost 10 More
LOW IMPACT
I-5
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46) Traffic Impacts: No scheduled traffic impacts.
Last Updated: 7/3/2014 9:12 AM
From milepost 10 to milepost 20 More
Western
Zoom to Vancouver Zoom to East Clark County Zoom to Centralia/Chehalis Zoom to East Clark County
South Central
Alerts Legend

Zoom in on the map to view more routes.
If you do not see the route you are looking for,
no problems have been reported.

Interstate:
I-5  I-205 
US Highways:
State Highways:
Countywide:
No Travel Alerts have been reported at this time.