Southwest Washington Travel Alerts

Travel Alerts
HIGH IMPACT
I-5
I-5 Both Directions - Maintenance on I-5 both directions at milepost 33. The crew will have a single lane closure beginning at 9:55 am on June 25, 2018 until further notice.
Last Updated: 6/25/2018 9:59 AM
At milepost 33 More
HIGH IMPACT
I-5
I-5 Southbound - Beginning Tuesday, May 29, until further notice: A single-lane of southbound I-5, between Todd Road and milepost 25, will be closed around-the-clock, for paving and bridge work. The speed limit through the work zone has been reduced to 60 mph. All southbound lanes of I-5 have been shifted through the work zone, there are no lane changes allowed through this area. The work is weather dependent.
Last Updated: 6/22/2018 11:55 AM
From milepost 28 to milepost 26 More
HIGH IMPACT
SR 4
SR 4 Both Directions - Beginning Monday, Feb. 12, until further notice: Traffic on both directions of SR 4, between Bunker Hill Road and Germany Creek Road, will alternate through a single-lane, around-the-clock, using a temporary traffic signal. Work to stabilize the hillside will begin in summer 2018. The speed limit through this area has been reduced to 25 mph.
Last Updated: 6/22/2018 11:35 AM
From milepost 49 to milepost 51 More
HIGH IMPACT
SR 409
SR 409 Both Directions - Beginning Monday, June 25 until further notice: Traffic on both directions of the SR 409 Puget Island Bridge will alternate through a single-lane around-the-clock for bridge painting and deck repair work. No overwidth loads permitted across the bridge during the single-lane closure.
Last Updated: 6/22/2018 11:33 AM
From milepost 3 to milepost 4 More
HIGH IMPACT
SR 504
SR 504 Both Directions - Beginning Monday, Oct. 30, until further notice: Traffic on both directions of SR 504, near Wooster Creek at milepost 17.0, will be shifted to a temporary single-lane, by-pass route, controlled by an automated traffic signal, around-the-clock, during construction. NOTE: Users of the highway will need to watch for advanced signs notifying them of the single-lane detour ahead. NOTE: All work is weather dependent.
Last Updated: 12/8/2017 12:27 PM
From milepost 17 to milepost 18 More
HIGH IMPACT
SR 105
SR 105 Both Directions - Beginning Monday, Sept. 18, until further notice: A single lane of the highway is closed between Eagle Hill Road and Panoramic Lane, around-the-clock, for erosion protection work.
NOTE: The speed limit has been reduced to 25 mph through this area.
Last Updated: 11/21/2017 2:12 PM
From milepost 19 to milepost 21 More
MODERATE IMPACT
SR 508
SR 508 Both Directions - Maintenance on SR 508 both directions at milepost 29.5 near Mosswood Road. The crew will be alternating traffic through the work zone beginning at 8:30 am on June 25, 2018 until further notice.
Last Updated: 6/25/2018 8:35 AM
At milepost 30 More
MODERATE IMPACT
SR 508
SR 508 Both Directions - Maintenance on SR 508 both directions at milepost 7.1 near Hyak Road. The crew will be alternating traffic through the work zone beginning at 8:19 am on June 25, 2018 until further notice.
Last Updated: 6/25/2018 8:25 AM
At milepost 7 More
Western
Zoom to Vancouver Zoom to East Clark County Zoom to Centralia/Chehalis Zoom to East Clark County
South Central
Alerts Legend

Zoom in on the map to view more routes.
If you do not see the route you are looking for,
no problems have been reported.

Interstate:
I-5 
US Highways:
State Highways:
Countywide:
No Travel Alerts have been reported at this time.