US 101 Both Directions - US 101 Bone River Bridge Replacement Project (mileposts 41.7 to 45.32)
Traffic impacts:
Traffic is reduced to a single, alternating lane with a temporary traffic signal.
NOTE: The speed limit on US 101 through the project area is temporarily reduced to 25 mph.
Last Updated: 6/7/2013 12:02 PM
From milepost 42 to milepost 46