Seattle Area Traffic and Cameras

Traveler Notice

For information about all of today's lane and ramp closures, please see the What’s Happening Now webpage.

Seattle Area Alerts

As of 8/28/2014 4:13 AM

Blocking Incidents
  • None reported
Construction Closures
  • **DRIVER ALERT Thursday, August 21 to Friday, August 29** - No left turns from any direction at the intersection of SR 9 and 84th Street Northeast will be allowed from 9 p.m. Thursday, Aug. 21 through noon on Friday, Aug. 29 for roundabout construction. Drivers will follow signed detours. Northbound and southbound traffic on SR 9 will remain open at all times. Right hand turns will be allowed.
  • Monday, Aug. 25 to the morning of Friday, Aug. 29 - Eastbound and Westbound SR 164 between Highpoint Street and SR 410 will be shifted nightly from 8 p.m. to 5 a.m. for construction work. Eastbound and westbound traffic will be able to travel through the project area.
  • Tuesday, Aug. 26 to the morning of Thursday, Aug. 28 - One lane of eastbound SR 520 at West Lake Sammamish Parkway will close nightly from 9 p.m. to 5 a.m. for expansion joint seal and electrical work.
  • Wednesday, Aug. 27 to the morning of Thursday, Aug. 28 - Two left lanes of westbound SR 520 between SR 202 and Northeast 60th Street will close from 8 p.m. to 5 a.m. for expansion joint seal and electrical work.
  • Monday, August 25 to the morning of Friday, August 29 - A single lane of 164th Street at the SR 522 interchange will be closed from midnight to 5 a.m. nightly for drainage work.
  • Monday, August 25 to Friday, August 29 - The right lane of westbound SR 528 near SR 9 will be closed from 9 a.m. to 2 p.m. daily for electrical work.
  • Wednesday, Aug. 27 to the morning of Thursday, Aug. 28 - The eastbound I-90 off-ramp to Bellevue Way Southeast will close from 9 p.m. to 5 a.m. for concrete pouring work
  • Wednesday, Aug. 27 to the morning of Thursday, Aug. 28 - The southbound I-405 ramp to eastbound SR 520 will close from 9 p.m. to 5 a.m. for expansion joint seal and electrical work.
  • Wednesday, Aug. 27 to the morning of Friday, Aug. 29 - Up to three right lanes of southbound I-5 between SR 104 and Northeast 155th Street will close nightly from 8 p.m. to 5 a.m. for concrete panel saw cutting. The first lane will close at 8 p.m., the second at 9 p.m., with three lanes closed by 11 p.m.
  • Monday, Aug. 25 to the morning of Friday, Aug. 29 - Up to three left lanes of southbound I-405 between SR 520 and Southeast 6th Street will close nightly from 8 p.m. to 5 a.m. for lighting and paving work.
  • Wednesday, Aug. 27 to the morning of Friday, Aug. 29 - The eastbound and westbound Northeast 124th Street on-ramp to southbound I-405 will close nightly from 9 p.m. to 5 a.m. for pavement repair.
  • Monday, Aug. 25 to the morning of Friday, Aug. 29 - The right lane of westbound SR 520 between the east highrise and Montlake Boulevard will close nightly from 9 p.m. to 6 a.m. for electrical equipment installation.
  • Monday, August 25 to the morning of Friday, August 29 - Up to three lanes in either direction of SR 527 from I-405 to SR 524 will be closed daily from 11 p.m. to 5 a.m. for grinding and paving work. Up to two lanes in either direction of 214th/217th/220th St. SE will also be closed. Lanes will start closing at 9 p.m.
  • Monday, Aug. 25 to the morning of Friday, Aug. 29 – One lane of the northbound and southbound I-5 Nooksack River bridges will be closed from 7 p.m. to 5 a.m. for preparation and bridge painting. Drivers should be prepared for slightly narrower lanes. The speed limit through the work zone is reduced from 70 to 60 mph.
  • Wednesday, Aug. 27 to Thursday, Aug. 28 – One lane of SR 9 between Doran Road and SR 542 will be closed from 7 a.m. to 5 p.m. for road work. Flaggers will control traffic in the work zone.
  • Monday, Aug. 25 to Thursday, Aug. 28 – One lane of northbound SR 9 may be closed daily near Front Street from 7 a.m. to 3 p.m. for construction. Flaggers will direct traffic through the work zone.
  • Monday, Aug. 25 to Thursday, Aug. 28 – Drivers should expect lane and shoulder closures on SR 539 between Horton Road and SR 546/East Badger Road from 7 a.m. and 3 p.m. for construction. Flaggers will direct traffic through the work zone.
  • Monday, Aug. 25 to Thursday, Aug. 28 – One lane of SR 539 will be closed near the border daily from 7 a.m. to 5 p.m. for clearing and drainage work. Flaggers will direct traffic through the work zone.
  • Monday, Aug. 25 to Thursday, Aug. 28 – One lane of SR 20 will be closed west of Alfred Street near Rockport State Park from 7 a.m. to 5:30 p.m. for PUD of Skagit County to construct a retaining wall. Flaggers will control traffic through the work zone.
Special Events
  • None reported
Snoqualmie Pass on I-90 City of Redmond traffic cameras City of Lynnwood traffic cameras Tacoma area camera map City of Seattle traffic cameras City of Bellevue traffic cameras Express lanes information Mukilteo to Clinton Ferry Monroe and Sultan area camera map Mt Vernon and Stanwood area camera map City of Issaquah - Traffic Cameras SR 520 Bridge Toll Rates Auburn Traffic Conditions 112th Ave SE 112th St SW, NB 112th St SW, SB 124th Ave NE 128th St SW 148th Ave NE 148th St SW 150th Ave SE 15th St NW 164th St SW 18th Ave S (Near Rainier Ave) 204th St SE, NB 204th St SE, SB 220th St SW 236th St SW 41st St SE 44th Ave W 47th St SE 60th St SE, SB 73rd St SE, NB 76th Ave SE 76th St SW (north) 77th St SE 84th Ave S 92nd Ave NE Albro Pl Beverly Park Rd Boeing Access Rd Coal Creek Pkwy Delmar Dr E Duwamish River East end of the SR 520 Floating Bridge Enchanted Pkwy I-405/SR 167 Interchange I-405/SR 169 Interchange I-405/SR 520 Interchange I-405/SR 522 Interchange I-405/SR 524 Interchange (Filbert Rd) I-405: NE 124th St I-405: SE 20th St, NB I-405: SE 8th St I-405: Sunset Blvd I-405: Talbot Rd S I-405: West Valley Highway (SR 181) I-5/I-405 Interchange (Alderwood) I-5/I-90 Interchange (8th Ave S) I-5/SR 18 Interchange I-5/SR 516 Interchange I-5: 116th St NE I-5: 128th St NE I-5: 12th St NE I-5: 144th St NE I-5: 26th St NE I-5: 88th St NE I-5: SR 528 I-5: S Rose St (Mid-Boeing Field) I-5: SR 529 I-5: SR 531 I-5: SR 599 Interchange I-90 Bridge Midspan I-90/I-405 Interchange (Factoria) I-90: 163rd Ave SE I-90: Bellevue Way SE I-90: E Mercer Way I-90: Front St I-90: Island Crest Way I-90: Shorewood I-90: Shorewood West I-90: SR 18 I-90: Sunset Way I-90: W Lk Sammamish Pkwy Lake City Way Lk Wash Blvd Marine View Dr Mercer St Montlake Ramp N Northgate Way NE 116th St NE 132nd St NE 145th St NE 160th St NE 175th St NE 195th St NE 195th St NE 30th St NE 44th St NE 45th St NE 51st St NE 53rd St NE 85th St NE 85th St NE 8th St NE Park Dr Pacific Ave Paine Field Blvd Paradise Lake Rd (Looking North) Paradise Lake Rd (Looking South) Pine St Redmond Way Roanoke St S 178th St S 180th St S 188th St S 200th St S 222nd St S 260th St S 277th St S 288th St S 320th St S 375th St S Holgate St SE 64th St Southcenter Spokane St SR 167: Willis St SR 18: 244th Ave SE SR 18: Auburn Way SR 18: C St SR 18: SE 231st St SR 18: SR 169 Interchange SR 18: Tiger Mountain SR 18: West Valley Hwy SR 18: Weyerhaeuser Way SR 202: 204th Ave NE SR 202: E Lake Sammamish Pkwy SR 202: Sahalee Way SR 516 at SR 18 SR 518: SR 99 Interchange SR 520: Bellevue Way NE (104th Ave NE) SR 520: W Lk Sammamish Pkwy SR 522 and 68th Ave Interchange SR 522: Ballinger Way (SR 104) SR 522: Echo Lake Rd SR 522: Fales Rd SR 522: S Campus Way SR 522: SR 202 SR 522: SR 9 SR 525: 5th St SR 525: SR 99 Interchange SR 526 SR 526: Evergreen Way SR 527, Median SR 527: 132nd St SE / SR 96 SR 527: 164th St SE SR 529: Snohomish River SR 9: 124th St SE SR 9: 152nd SE SR 9: 164th SE SR 9: 228th St SE SR 9: Cathcart Way SR 9: Harvey Field SR 9: Lowell-Larimer Rd SR 9: Marsh Rd SR 9: SR 524 SR 9: SR 204 SR 9: Lundeen Pkwy SR 9: Soper Hill Rd SR 9: SR 92 SR 900 SR 99: King St Northbound SR 99: S Atlantic St SR 99: S Michigan St SR 99: SR 599 Interchange SR 99: W Marginal Way US 2:  SR 204 Interchange US 2: Homeacres Rd US 2: SR 9 Interchange West Highrise, E Yesler Way I-90: 133rd Ave SE SR 167 at 23rd St SW