Seattle Area Traffic and Cameras

Traveler Notice

Closure of SR 99 in Seattle starts Friday
Drivers should prepare for a full closure of SR 99 from South Spokane Street to Valley Street starting at 10 p.m. Friday after the Seahawks game. The highway will reopen by 5 a.m. Wednesday, August 27. Drivers should consider using alternate routes and plan for heavy congestion and delays. For details, check out our What’s Happening Now webpage.

Seattle Area Alerts

As of 8/20/2014 9:20 PM

Blocking Incidents
  • None reported
Construction Closures
  • Wednesday, Aug. 20 to the morning of Friday, Aug. 22 - Eastbound and Westbound SR 164 between Highpoint Street and SR 410 will be shifted nightly from 8 p.m. to 5 a.m. for permanent striping work. Eastbound and westbound traffic will be able to travel through the project area.
  • Monday, Aug. 18 to the morning of Friday, Aug. 22 - The West Lake Sammamish Parkway ramp to westbound SR 520 will close nightly 10 p.m. to 5 a.m. for pavement repair work.
  • Wednesday, Aug. 20 to the morning of Friday, Aug. 22 -Two left lanes of westbound SR 520 between West Lake Sammamish Parkway and Northeast 60th Street will close nightly 8 p.m. to 5 a.m. for pavement repair work.
  • Tuesday, July 29 to the morning of Thursday, August 21 - The SR 522 ramp to eastbound US 2 will be closed around-the-clock from 10 p.m. Tuesday, July 29 to 12:01 a.m. Thursday, August 21 for bridge repaving. Drivers will follow a short detour to access US 2.
  • Monday, August 18 to the morning of Friday, August 22 - A single lane of 164th Street at the SR 522 interchange will be closed from 8 p.m. to 5 a.m. nightly for utility and drainage work.
  • Monday, August 18 to the morning of Friday, August 22 - A single lane of SR 522 from the Snohomish River Bridge to 164th Street will be closed nightly from 9 p.m. to 5 a.m. for rumble strip removal.
  • Monday, August 18 to Friday, August 22 - The right lane of westbound SR 528 near SR 9 will be closed from 9 a.m. to 2 p.m. for electrical work.
  • *DRIVER ALERT* Wednesday, Aug. 20 to the morning of Thursday, Aug. 21 - The southbound I-405 on-ramp to eastbound SR 520 will close from 9 p.m. to 5 a.m. for pavement repair work.
  • Monday, Aug. 18 - the morning of Friday, Aug. 22 -- Up to two southbound lanes SR 99 will be closed between South Atlantic Street and South Spokane Street from 9 p.m. to 5 a.m. each night.
  • Monday, Aug. 18 - The morning of Friday, Aug. 22 - Up to two northbound lanes of SR 99 will be closed between South Spokane Street and South Atlantic Street from 10 p.m. to 5 a.m. each night.
  • *DRIVER ALERT* Wednesday, Aug. 20 to the morning of Thursday, Aug. 21 - The westbound SR 520 on-ramp to southbound I-405 will close from 9 p.m. to 5 a.m. for pavement repair work.
  • Wednesday, Aug. 20 to the morning of Friday, Aug. 22 -Eastbound and westbound Northeast 124th Street to Southbound I-405 will close nightly from 9 p.m. to 5 a.m. for pavement repair work. Drivers will follow a signed detour.
  • Monday, Aug. 18 to the morning of Friday, Aug. 22 - The HOV lane of southbound I-405 between SR 520 and Northeast 6th Street will close nightly from 8 p.m. to 5 a.m. for paving work.
  • Monday, August 18 to the morning of Thursday, August 21 – The northbound I-405 ramp to westbound SR 520 will close from 11 p.m. to 4 a.m. nightly for bridge widening work.
  • Monday, August 18 to the morning of Friday, August 22 – The southbound I-405 off-ramp to Northeast 160th Street will close nightly from 11 p.m. to 5 a.m. nightly for retaining wall work.
  • Monday, August 18 to the morning of Friday, August 22 – The Northeast 160th Street on-ramp to southbound I-405 will close from 8 p.m. to 5 a.m. nightly for paving work.
  • Monday, August 18 to the morning of Friday, August 22 – The eastbound and westbound SR 522 ramps to southbound I-405 will close from 10 p.m. to 5 a.m. nightly for retaining wall and electrical work. They will not close if the Northeast 160th Street off-ramp to southbound I-405 closes.
  • Monday, August 18 to the morning of Friday, August 22 – The northbound I-405 off-ramp to Northeast 124th Street/Totem Lake Boulevard will close from 10 p.m. to 6 a.m. nightly for paving work. It will not close if the NE 160th Street on-ramp to southbound I-405 or the northbound off-ramp to NE 160th Street closes.
  • Monday, August 18 to the morning of Thursday, August 21 – The northbound I-405 off-ramp to Northeast 128th Street will close from midnight to 6 a.m. nightly for electrical work.
  • Monday, August 18 to the morning of Thursday, August 21 – The Northeast 128th Street on-ramp to northbound I-405 will close from midnight to 6 a.m. nightly for electrical work.
  • Monday, August 18 to the morning of Thursday, August 21 – The southbound I-405 off-ramp to Northeast 128th Street will close nightly from 8 p.m. to 4:50 a.m. nightly for barrier and electrical work.
  • Monday, August 18 to the morning of Thursday, August 21 – The Northeast 128th Street on-ramp to southbound I-405 will close from 8 p.m. to 4:50 a.m. nightly for electrical work.
  • Tuesday, August 19 to the morning of Thursday, August 21 – The southbound I-405 off-ramp to Northeast 70th Street will close from 9 p.m. to 6 a.m. nightly for lane restriping work.
  • Tuesday, August 19 to the morning of Thursday, August 21 – The Northeast 85th Street on-ramp to southbound I-405 will close from 10 p.m. to 6 a.m. nightly for lane restriping work.
  • Wednesday, August 20 to the morning of Friday, August 22 – One lane of southbound I-405 between I-5 in Lynnwood and SR 527 will close from 7 p.m. to 5 a.m. nightly for lane striping work. (Weather and temperature dependent).
  • Wednesday, Aug. 20 to the morning of Thursday, Aug. 21 - The northbound SR 167 off-ramp to SR 516 will close from 9 p.m. to 5 a.m. for paving work. Drivers will follow a signed detour.
  • Wednesday, Aug. 20 to the morning of Thursday, Aug. 21 - The right lane of the westbound SR 520 on-ramp to southbound I-5 will close from 10 p.m. to 5 a.m. for pavement patching.
  • Monday, Aug. 18 to the morning of Friday, Aug. 22 - The right lane of westbound and eastbound SR 520 between the east highrise and Montlake Boulevard will close nightly from 9 p.m. to 6 a.m. for material delivery and electrical equipment install.
  • Monday, Aug. 18 to the morning of Friday, Aug. 22. - The westbound SR 520 off-ramp to Northeast 51st and Northeast 40th Streets will close nightly 9 p.m. to 5 a.m. for pavement repair work.
  • Monday, August 18 to the morning of Friday, August 22 - Up to three lanes in either direction of SR 527 from I-405 to SR 524 will be closed daily from 11 p.m. to 5 a.m. for grinding and paving work. Up to two lanes in either direction of 214th/217th/220th St. SE will also be closed. Lanes will start closing at 9 p.m.
  • Wednesday, August 20 to the morning of Friday, August 22 – One lane of southbound I-405 between SR 522 and Northeast 160th Street will close from 7 p.m. to 5 a.m. nightly for electrical work.
  • Tuesday, August 18 to the morning of Friday, August 22 – One lane of southbound I-405 between Northeast 85th Street and Northeast 70th Street will close from 7 p.m. to 5 a.m. nightly for lane restriping and paving work.
  • Monday, Aug. 18 to the morning of Friday, Aug. 22 – One lane of the northbound and southbound I-5 Nooksack River bridges will be closed from 7 p.m. to 5 a.m. for preparation and bridge painting. Drivers should be prepared for slightly narrower lanes. The speed limit through the work zone is reduced from 70 to 60 mph.
  • Monday, Aug. 18 to the morning of Friday, Aug. 22 – One lane of northbound SR 9 may be closed daily near Front Street from 7 a.m. to 3 p.m. for construction. Flaggers will direct traffic through the work zone.
  • Monday, Aug. 18 to the morning of Friday, Aug. 22 – Drivers should expect lane and shoulder closures on SR 539 between Horton Road and SR 546/East Badger Road from 7 a.m. and 3 p.m. for construction. Flaggers will direct traffic through the work zone.
  • Monday, Aug. 18 to the morning of Friday, Aug. 22 – One lane of SR 539 will be closed near the border daily from 7 a.m. to 5 p.m. for clearing and drainage work. Flaggers will direct traffic through the work zone.
  • Monday, Aug. 18 to Thursday, Aug. 21 – One lane of SR 20 will be closed west of Alfred Street near Rockport State Park from 7 a.m. to 5:30 p.m. for PUD of Skagit County to construct a retaining wall. Flaggers will control traffic through the work zone.
  • **DRIVER ALERT Tuesday, August 19 to the morning of Thursday, August 21** - Both directions of SR 530 in Oso will be closed around the clock from 9 p.m. Tuesday to 4 a.m. Thursday for culvert and pavement work. Traffic will be detoured to the Seattle City Light Access Road.
Special Events
  • None reported
Snoqualmie Pass on I-90 City of Redmond traffic cameras City of Lynnwood traffic cameras Tacoma area camera map City of Seattle traffic cameras City of Bellevue traffic cameras Express lanes information Mukilteo to Clinton Ferry Monroe and Sultan area camera map Mt Vernon and Stanwood area camera map City of Issaquah - Traffic Cameras SR 520 Bridge Toll Rates Auburn Traffic Conditions 112th Ave SE 112th St SW, NB 112th St SW, SB 124th Ave NE 128th St SW 148th Ave NE 148th St SW 150th Ave SE 15th St NW 164th St SW 18th Ave S (Near Rainier Ave) 204th St SE, NB 204th St SE, SB 220th St SW 236th St SW 41st St SE 44th Ave W 47th St SE 60th St SE, SB 73rd St SE, NB 76th Ave SE 76th St SW (north) 77th St SE 84th Ave S 92nd Ave NE Albro Pl Beverly Park Rd Boeing Access Rd Coal Creek Pkwy Delmar Dr E Duwamish River East end of the SR 520 Floating Bridge Enchanted Pkwy I-405/SR 167 Interchange I-405/SR 169 Interchange I-405/SR 520 Interchange I-405/SR 522 Interchange I-405/SR 524 Interchange (Filbert Rd) I-405: NE 124th St I-405: SE 20th St, NB I-405: SE 8th St I-405: Sunset Blvd I-405: Talbot Rd S I-405: West Valley Highway (SR 181) I-5/I-405 Interchange (Alderwood) I-5/I-90 Interchange (8th Ave S) I-5/SR 18 Interchange I-5/SR 516 Interchange I-5: 116th St NE I-5: 128th St NE I-5: 12th St NE I-5: 144th St NE I-5: 26th St NE I-5: 88th St NE I-5: SR 528 I-5: S Rose St (Mid-Boeing Field) I-5: SR 529 I-5: SR 531 I-5: SR 599 Interchange I-90 Bridge Midspan I-90/I-405 Interchange (Factoria) I-90: 163rd Ave SE I-90: Bellevue Way SE I-90: E Mercer Way I-90: Front St I-90: Island Crest Way I-90: Shorewood I-90: Shorewood West I-90: SR 18 I-90: Sunset Way I-90: W Lk Sammamish Pkwy Lake City Way Lk Wash Blvd Marine View Dr Mercer St Montlake Ramp N Northgate Way NE 116th St NE 132nd St NE 145th St NE 160th St NE 175th St NE 195th St NE 195th St NE 30th St NE 44th St NE 45th St NE 51st St NE 53rd St NE 85th St NE 85th St NE 8th St NE Park Dr Pacific Ave Paine Field Blvd Paradise Lake Rd (Looking North) Paradise Lake Rd (Looking South) Pine St Redmond Way Roanoke St S 178th St S 180th St S 188th St S 200th St S 222nd St S 260th St S 277th St S 288th St S 320th St S 375th St S Holgate St SE 64th St Southcenter Spokane St SR 167: Willis St SR 18: 244th Ave SE SR 18: Auburn Way SR 18: C St SR 18: SE 231st St SR 18: SR 169 Interchange SR 18: Tiger Mountain SR 18: West Valley Hwy SR 18: Weyerhaeuser Way SR 202: 204th Ave NE SR 202: E Lake Sammamish Pkwy SR 202: Sahalee Way SR 516 at SR 18 SR 518: SR 99 Interchange SR 520: Bellevue Way NE (104th Ave NE) SR 520: W Lk Sammamish Pkwy SR 522 and 68th Ave Interchange SR 522: Ballinger Way (SR 104) SR 522: Echo Lake Rd SR 522: Fales Rd SR 522: S Campus Way SR 522: SR 202 SR 522: SR 9 SR 525: 5th St SR 525: SR 99 Interchange SR 526 SR 526: Evergreen Way SR 527, Median SR 527: 132nd St SE / SR 96 SR 527: 164th St SE SR 529: Snohomish River SR 9: 124th St SE SR 9: 152nd SE SR 9: 164th SE SR 9: 228th St SE SR 9: Cathcart Way SR 9: Harvey Field SR 9: Lowell-Larimer Rd SR 9: Marsh Rd SR 9: SR 524 SR 9: SR 204 SR 9: Lundeen Pkwy SR 9: Soper Hill Rd SR 9: SR 92 SR 900 SR 99: King St Northbound SR 99: S Atlantic St SR 99: S Michigan St SR 99: SR 599 Interchange SR 99: W Marginal Way US 2:  SR 204 Interchange US 2: Homeacres Rd US 2: SR 9 Interchange West Highrise, E Yesler Way I-90: 133rd Ave SE SR 167 at 23rd St SW