Seattle Area Traffic and Cameras

Traveler Notice

Know before you go
For details on all of today's closures in King/Snohomish counties, including the ongoing closure of the eastbound I-90 ramp to Bellevue Way Southeast, see the What’s Happening Now page.

Seattle Area Alerts

As of 9/18/2014 10:49 PM

Blocking Incidents
  • On the I-5 northbound express lanes on-ramp from 9th Avenue (MP 166) the ramp is closed due to construction. Access to the express lanes from Pike Street is unaffected.
Construction Closures
  • Thursday, Sept. 18 to the morning of Sept. 19 - The Northeast 40th Street and Northeast 51st off-ramp from westbound SR 520 will close from 9 p.m. to 5 a.m. for paving work.
  • Thursday, Sept. 18 to the morning of Sept. 19 - The West Lake Sammamish Parkway ramp to westbound SR 520 will close from 11 p.m. to 5 a.m. for paving work.
  • **DRIVER ALERT**Tuesday, September 2 to the morning of Wednesday, October 1 - The ramp from SR 522 to eastbound US 2 will be closed around-the-clock from 10 p.m. Tuesday, September 2 to 5 a.m. Wednesday, October 1 for work on the 179th Bridge. Drivers will follow a signed detour.
  • Monday, September 15 to the morning of Friday, September 19 - The ramp from 164th Street Southeast to eastbound SR 522 and the ramp from eastbound SR 522 to 164th Street Southeast will be closed nightly for a variety of work. The on-ramp will be closed from 7 p.m. to 5 a.m. and the off-ramp will be closed from 8 p.m. to 5 a.m. but the ramps will never be closed at the same time. Drivers will follow a signed detour.
  • Monday, September 15 to the morning of Friday, September 19 - A single lane of SR 522 from the Snohomish River Bridge to 164th Street Southeast will be closed nightly from 9 p.m. to 5 a.m. for grinding and other road work. Traffic will be flagged through the open lane.
  • Monday, September 15 to the morning of Friday, September 19 - A single lane on 164th Street Southeast at the SR 522 interchange will be closed nightly from 9 p.m. to 5 a.m. for drainage work.
  • DRIVER ALERT: Monday, September 8 to the morning Tuesday, September 23 - The eastbound I-90 exit to Bellevue Way Southeast will close 9 p.m. Monday, Sept. 8 continuously for 15 days until the morning of Tuesday, Sept. 23 for drainage, grading, and paving work.
  • On Thursday, Sept. 18 crews will close all lanes of southbound SR 99 between South Atlantic and South Spokane streets from 10 p.m. to 5 a.m.
  • Monday, Sept. 15 to the morning of Friday, Sept. 19 - Up to three right lanes of southbound I-5 between Northeast 185th Street and Northeast 130th Street will close nightly from 8 p.m. to 5 a.m. concrete panel replacement.
  • Monday, September 15 to the morning of Friday, September 19 – The northbound I-405 off-ramp to Northeast 70th Street will close from 9 p.m. to 6 a.m. nightly for electrical work. The bus ramp will reopen by 5 a.m. for transit use.
  • Monday, September 15 to the morning of Friday, September 19 – The Northeast 70th Street on-ramp to southbound I-405 will close from 8 p.m. to 6 a.m. nightly for paving work.
  • Monday, September 15 to the morning of Friday, September 19 – The Northeast 85th Street on-ramp to southbound I-405 will close from 10 p.m. to 6 a.m. nightly for paving work. This ramp will not close if the Northeast 70th Street on-ramp to southbound I-405 closes.
  • Monday, September 15 to the morning of Friday, September 19 – The southbound I-405 off-ramp to Northeast 70th Street will close from 9 p.m. to 6 a.m. nightly for paving work. This ramp will not close if the northbound I-405 off-ramp to Northeast 70th Street closes).
  • Monday, September 15 to the morning of Friday, September 19 – The southbound I-405 off-ramp to Northeast 85th Street will close from 9 p.m. to 6 a.m. nightly for paving and drainage work. This ramp will not close if the southbound I-405 off-ramp to Northeast 70th Street closes.
  • Monday, September 15 to the morning of Friday, September 19 – The northbound I-405 off-ramp to Northeast 124th Street/Totem Lake Boulevard will close from 10 p.m. to 6 a.m. nightly for shoulder work. This ramp will not close if the NE 160th Street on-ramp to southbound I-405 or the northbound I-405 off-ramp to Northeast 160th Street closes.
  • Monday, September 15 to the morning of Friday, September 19 – The northbound I-405 off-ramp to Northeast 128th Street will close from midnight to 6 a.m. nightly for electrical and drainage work.
  • Monday, September 15 to the morning of Friday, September 19 – The Northeast 128th Street on-ramp to northbound I-405 will close from midnight to 6 a.m. nightly for electrical, drainage and lane restriping work.
  • Monday, September 15 to the morning of Friday, September 19 – The southbound I-405 off-ramp to Northeast 128th Street will close from 8 p.m. to 4:50 a.m. nightly for electrical work.
  • Monday, September 15 to the morning of Friday, September 19 – The Northeast 128th Street on-ramp to southbound I-405 will close from 8 p.m. to 4:50 a.m. nightly for electrical work.
  • Monday, September 15 to the morning of Friday, September 19 – The northbound I-405 off-ramp to Northeast 160th Street will close from 11 p.m. to 6 a.m. nightly for paving work.
  • Monday, September 15 to the morning of Friday, September 19 – The Northeast 160th Street on-ramp to southbound I-405 will close from 8 p.m. to 5 a.m. nightly for paving work.
  • Monday, September 15 to the morning of Friday, September 19 – Up to two lanes of northbound I-405 between Northeast 70th Street and Northeast 85th Street will from 8 p.m. to 7 a.m. nightly for electrical work.
  • Wednesday, September 17 to the morning of Friday, September 19 – Up to two lanes of northbound I-405 between SR 527 and I-5 in Lynnwood will close from 7:30 p.m. to 6 a.m. nightly for tolling work.
  • Thursday, Sept. 18 to the morning of Friday, Sept. 19 - The three right lanes of southbound I-405 between SR 520 and Southeast 8th Street will close from 8 p.m. to 5 a.m. for paving.
  • Thursday, Sept. 18 to the morning of Friday, Sept. 19 - The 4th Street Northeast on- and off ramps and the Southeast 8th Street off ramp from southbound I-405 will close from 10 p.m. to 5 a.m. for paving work.
  • Thursday, Sept. 18 to the morning of Friday, Sept. 19 - The 108th and 12th Avenue Northeast on- and off-ramps to Sr 520 will close 10 p.m. to 5 a.m. for paving work.
  • Monday, September 15 to the morning of Friday, September 19 - Up to three lanes in either direction of SR 527 from I-405 to SR 524 will be closed daily from 11 p.m. to 5 a.m. for grinding and paving work. Up to two lanes in either direction of 214th/217th/220th St. SE will also be closed. Lanes will start closing at 9 p.m.
  • Monday, September 15 to the morning of Friday, September 19 – One lane of southbound I-405 between Northeast 85th Street and Northeast 70th Street will close from 7 p.m. to 5 a.m. nighty for paving work.
  • Monday, September 15 to the morning of Friday, September 19 – One lane of southbound I-405 between Northeast 124th Street and Northeast 85th Street will close from 7 p.m. to 5 a.m. nightly for paving and drainage work.
  • Wednesday, September 17 to the afternoon of Friday, September 19 – One lane of northbound I-405 between Northeast 195th Street and SR 527 will close from 7 p.m. to 1 p.m. nightly for tolling work.
  • Monday, Sept. 15 to the morning of Friday, Sept. 19 – One lane of the northbound and southbound I-5 Nooksack River bridges will be closed from 7 p.m. to 5 a.m. for preparation and bridge painting. Drivers should be prepared for slightly narrower lanes. The speed limit through the work zone is reduced from 70 to 60 mph.
  • Monday, Sept. 15 to the morning of Friday, Sept. 19 – One lane of SR 539 will be closed near the border daily from 7 a.m. to 5 p.m. for pavement work. Flaggers will direct traffic through the work zone.
  • Thursday, September 11 to Friday, September 19 - Drivers should expect traffic to be flagged in both directions from 6 a.m. to 6 p.m. daily for roadway work. Wait times have been about 10 minutes.
Special Events
  • The annual Tour de Whidbey will place cyclists on portions of SR 20 between Fort Casey State Park and Barrington Drive in Oak Harbor on Saturday, September 20, 2014, from 7:00 a.m. until 5:00 p.m.
  • The annual Tour de Whidbey will place cyclists on portions of SR 525, between Cultus Bay/Langley Rd and SR 20 on Saturday, September 20, 2014, between 7:00 a.m. and 5:00 p.m.
  • On Saturday, September 20, 2014, Uniformed Police Officers will intermittently control traffic at the end of the Northbound I-5 ramp to Nulle Road and at the Old Samish Road/Samish Way Overpass between 12:00 p.m. and 5:00 p.m., during the annual Bellingham Traverse event. Runners will also cross under I-5 at Exit 250.
  • Runners participating in the annual Bellingham Traverse event will cross SR 11 right of way on the eastbound trail crossing at Padden Creek, run eastbound from 24th St. to under I-5 Exit 250, and cyclists will ride northbound on SR 11 from Old Lake Samish Rd. to Cowgill Avenue. Uniformed officers will intermittently control traffic at the intersections of Old Samish Way and Cowgill Avenue to allow cyclists to safely pass through the intersections.
Snoqualmie Pass on I-90 City of Redmond traffic cameras City of Lynnwood traffic cameras Tacoma area camera map City of Seattle traffic cameras City of Bellevue traffic cameras Express lanes information Mukilteo to Clinton Ferry Monroe and Sultan area camera map Mt Vernon and Stanwood area camera map City of Issaquah - Traffic Cameras SR 520 Bridge Toll Rates Auburn Traffic Conditions 112th Ave SE 112th St SW, NB 112th St SW, SB 124th Ave NE 128th St SW 148th Ave NE 148th St SW 150th Ave SE 15th St NW 164th St SW 18th Ave S (Near Rainier Ave) 204th St SE, NB 204th St SE, SB 220th St SW 236th St SW 41st St SE 44th Ave W 47th St SE 60th St SE, SB 73rd St SE, NB 76th Ave SE 76th St SW (north) 77th St SE 84th Ave S 92nd Ave NE Albro Pl Beverly Park Rd Boeing Access Rd Coal Creek Pkwy Delmar Dr E Duwamish River East end of the SR 520 Floating Bridge Enchanted Pkwy I-405/SR 167 Interchange I-405/SR 169 Interchange I-405/SR 520 Interchange I-405/SR 522 Interchange I-405/SR 524 Interchange (Filbert Rd) I-405: NE 124th St I-405: SE 20th St, NB I-405: SE 8th St I-405: Sunset Blvd I-405: Talbot Rd S I-405: West Valley Highway (SR 181) I-5/I-405 Interchange (Alderwood) I-5/I-90 Interchange (8th Ave S) I-5/SR 18 Interchange I-5/SR 516 Interchange I-5: 116th St NE I-5: 128th St NE I-5: 12th St NE I-5: 144th St NE I-5: 26th St NE I-5: 88th St NE I-5: SR 528 I-5: S Rose St (Mid-Boeing Field) I-5: SR 529 I-5: SR 531 I-5: SR 599 Interchange I-90 Bridge Midspan I-90/I-405 Interchange (Factoria) I-90: 163rd Ave SE I-90: Bellevue Way SE I-90: E Mercer Way I-90: Front St I-90: Island Crest Way I-90: Shorewood I-90: Shorewood West I-90: SR 18 I-90: Sunset Way I-90: W Lk Sammamish Pkwy Lake City Way Lk Wash Blvd Marine View Dr Mercer St Montlake Ramp N Northgate Way NE 116th St NE 132nd St NE 145th St NE 160th St NE 175th St NE 195th St NE 195th St NE 30th St NE 44th St NE 45th St NE 51st St NE 53rd St NE 85th St NE 85th St NE 8th St NE Park Dr Pacific Ave Paine Field Blvd Paradise Lake Rd (Looking North) Paradise Lake Rd (Looking South) Pine St Redmond Way Roanoke St S 178th St S 180th St S 188th St S 200th St S 222nd St S 260th St S 277th St S 288th St S 320th St S 375th St S Holgate St SE 64th St Southcenter Spokane St SR 167: Willis St SR 18: 244th Ave SE SR 18: Auburn Way SR 18: C St SR 18: SE 231st St SR 18: SR 169 Interchange SR 18: Tiger Mountain SR 18: West Valley Hwy SR 18: Weyerhaeuser Way SR 202: 204th Ave NE SR 202: E Lake Sammamish Pkwy SR 202: Sahalee Way SR 516 at SR 18 SR 518: SR 99 Interchange SR 520: Bellevue Way NE (104th Ave NE) SR 520: W Lk Sammamish Pkwy SR 522 and 68th Ave Interchange SR 522: Ballinger Way (SR 104) SR 522: Echo Lake Rd SR 522: Fales Rd SR 522: S Campus Way SR 522: SR 202 SR 522: SR 9 SR 525: 5th St SR 525: SR 99 Interchange SR 526 SR 526: Evergreen Way SR 527, Median SR 527: 132nd St SE / SR 96 SR 527: 164th St SE SR 529: Snohomish River SR 9: 124th St SE SR 9: 152nd SE SR 9: 164th SE SR 9: 228th St SE SR 9: Cathcart Way SR 9: Harvey Field SR 9: Lowell-Larimer Rd SR 9: Marsh Rd SR 9: SR 524 SR 9: SR 204 SR 9: Lundeen Pkwy SR 9: Soper Hill Rd SR 9: SR 92 SR 900 SR 99: King St Northbound SR 99: S Atlantic St SR 99: S Michigan St SR 99: SR 599 Interchange SR 99: W Marginal Way US 2:  SR 204 Interchange US 2: Homeacres Rd US 2: SR 9 Interchange West Highrise, E Yesler Way I-90: 133rd Ave SE SR 167 at 23rd St SW