Travel Alerts South Central Washington

Travel Alerts
MODERATE IMPACT
I-90
I-90 Eastbound - I-90 milepost 137 eastbound Vantage Bridge painting: Drivers can expect short delays as traffic merges down to one lane 24 hours a day, 7 days a week. Friday afternoons, holidays, and EVENT weekends (June 23 & 24) will experience significant congestion with delays ranging from 20 minutes to 2 hours during peak traffic times. Drivers may consider taking an alternate route using US-97, I-82 or SR-24. Loads over 14 feet wide are prohibited through the project area.
Last Updated: 6/23/2016 4:17 AM
At milepost 137 More
MODERATE IMPACT
US 12
US 12 Both Directions - US 12 White Pass milepost 141 to 166: A traffic signal will direct traffic through a single lane near repair areas. Eastbound and westbound drivers will encounter alternating one lane traffic through the project in two to three locations, 24 hours a day, 7 days a week. Delays up to 30 minutes are anticipated in both directions.
Last Updated: 6/20/2016 10:01 PM
From milepost 141 to milepost 166 More
MODERATE IMPACT
SR 142
SR 142 Both Directions - Beginning Friday, May 20 until further notice: Drivers on both directions of SR 142 will alternate through a single-lane over the Spring Creek Bridge , around-the-clock, for bridge maintenance work. Note: The speed limit is reduced to 25 mph in the area
Last Updated: 6/16/2016 3:41 PM
At milepost 30 More
LOW IMPACT
US 12
US 12 Both Directions - US-12 milepost 202 to 203 (Yakima Vicinity, from 16th Ave. Interchange to I-82 Interchange): Monday night through Friday morning traffic in both directions will be reduced to one lane at night. Minimal delays are anticipated.
Last Updated: 6/25/2016 2:12 AM
From milepost 202 to milepost 203 More
LOW IMPACT
I-90
I-90 Both Directions - I-90 milepost 106 to 126,Paving: June 26 to June 30:
•Daily Lane closures: On I-90 between mp 106 and mp 126. One lane will be closed in both directions between 6am-9pm. Expect delays. Posted speed limit is lowered to 60 MPH, advisory speed through the work zone is 45 MPH.
•Night Work: Ramp closures Canyon Road and I-82 7pm to 7am. Signed detours will be in place.
•Night Work: Lane shift on the ramps at the Kittitas exit mp 115 7 pm to 7 am. The exit will remain open.
Last Updated: 6/25/2016 2:03 AM
From milepost 106 to milepost 126 More
LOW IMPACT
I-82
I-82 Eastbound - I-82 milepost 82 to milepost 92 paving: Monday through Friday between 7 a.m. and 7 p.m., motorists will experience single lane closures and narrowed traffic lanes eastbound. One lane of traffic will be open at all times. The regulatory speed limit is reduced to 60 mph during the hours of work activity. Throughout the week the off and on ramps will be closed intermittently.
Last Updated: 6/20/2016 9:59 PM
From milepost 82 to milepost 92 More
LOW IMPACT
SR 224
SR 224 Both Directions - SR-224/SR-225 Benton City intersection improvements: Monday and Tuesday between 7 a.m. and 5:30 p.m. when traveling through the work zone motorists will experience intermittent 15 minute delays.
Last Updated: 6/18/2016 9:51 AM
At milepost 0 More
LOW IMPACT
SR 240
SR 240 Both Directions - SR-240 between milepost 25 near Twin Bridges Road to milepost 27 near Kingsgate Way: Mondays through Fridays during daylight hours, drivers should prepare for potential delays in both directions as crews will be working beyond the shoulder.
Last Updated: 6/18/2016 9:35 AM
From milepost 25 to milepost 27 More
Central
South West
Zoom to Tri Cities
South East
Alerts Legend

Zoom in on the map to view more routes.
If you do not see the route you are looking for,
no problems have been reported.

Interstate:
I-82  I-90 
US Highways:
US 12 
State Highways:
Countywide:
No Travel Alerts have been reported at this time.