Washington State Travel Alerts

Travel Alerts
MODERATE IMPACT
US 2 Both Directions - On US 2 through Tumwater Canyon Monday through Thursday 7 a.m. to 7 p.m., expect up to 20 minute delays with single lane flagger/pilot car controlled traffic for chip sealing.
Last Updated: 7/21/2017 5:16 PM
From milepost 90 to milepost 99
Report Detail
(US 2) NCR 2017 Pavement Rehabilitation and Seal - Contract #9006 Location: MP 90-99 Wenatchee River Bridge to Leavenworth Description: In this $9.6M project, Granite Construction is performing crack seal, chip seal, Asphalt paving, cushion course, and concrete pavement work on multiple routes in North Central Region. Work begins July 17 in Tumwater Canyon and should be complete at the end of August. Contact: Dan Lewis , Project Engineer (509) 667-2880
Traffic Cameras
Zoom to Northwest
Zoom to North Central
Zoom to Northeast
Zoom to Western
Zoom to Puget Sound
Zoom to Central
Zoom to Eastern
Zoom to Southwest
Zoom to South Central
Zoom to Southeast
Zoom to Northwest Zoom to North Central Zoom to Northeast Zoom to Western Zoom to Puget Sound Zoom to Central Zoom to Eastern Zoom to Southwest Zoom to South Central Zoom to Southeast
Alerts Legend

Zoom in on the map to view more routes.
If you do not see the route you are looking for,
no problems have been reported.

Interstate:
I-5  I-82  I-90  I-405 
US Highways:
Countywide:
No Travel Alerts have been reported at this time.