Washington State Travel Alerts

Travel Alerts
HIGHEST IMPACT
I-5
I-5 Both Directions - Friday, Oct. 24 to the morning of Saturday, Oct. 25 - Both directions of I-5 between SR 599 and Boeing Access Road will close from 11:59 p.m. Friday to 6 a.m. Saturday for Seattle City Light work. The first lane on I-5 will close at 9 p.m., the second at 10 p.m., the third at 11 p.m. and all lanes will be closed by midnight. Drivers will follow signed detours around the closures.
Last Updated: 10/21/2014 8:23 AM
From milepost 156 to milepost 161 More
MODERATE IMPACT
I-5
I-5 Both Directions - Monday, Oct. 20 to Friday, Oct. 24: A single-lane in both directions of I-5 at the North Fork Lewis River Bridge will be closed around-the-clock for painting work.
Last Updated: 10/17/2014 12:57 PM
At milepost 20 More
MODERATE IMPACT
I-5
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08)
Friday, Oct. 17 to the morning of Saturday, Oct. 18: Both direction of I-5 will be reduced to a single lane near the North Fork Lewis River from 10 p.m. to 8 a.m. Saturday, Oct 18 to the morning of Sunday, Oct. 19: Both directions of I-5 near the North Fork Lewis River Bridge will be reduced to a single lane from 11 p.m. to 9 a.m. for bridge painting work.
Last Updated: 10/17/2014 12:24 PM
From milepost 20 to milepost 21 More
MODERATE IMPACT
I-5
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (MP 79.81 to 84.15) Monday, Oct. 20 to Friday, Oct. 24: Drivers should expect possible nighttime delays with single-lane and shoulder closures, on both directions of I-5 through Centralia, for striping work. Monday through Wednesday, from 8 p.m. to 5 a.m. Thursday, from 9 p.m. to 5 a.m. and Friday, from 10 p.m. to 7 a.m. Work is weather dependent.
Last Updated: 10/17/2014 12:22 PM
From milepost 80 to milepost 85 More
MODERATE IMPACT
I-5
I-5 Southbound - I-5, Southbound, Gee Creek Rest Area Facility Improvements (milepost 12.0)
Traffic Impacts:
The southbound I-5 Gee Creek Rest Area is closed from Sept. 8 until Thanksgiving for facility improvements.
Last Updated: 10/10/2014 1:27 PM
At milepost 12 More
LOW IMPACT
I-5
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93)
Friday, Oct. 17 to the morning of Friday, Oct. 24: Drivers should be prepared for occasional, nighttime, intermittent lane and ramp closures on both directions of I-5 between NE 99th and NE 39th Street for paving and striping work nightly from 8 p.m. to 6 a.m.
Last Updated: 10/17/2014 1:26 PM
From milepost 2 to milepost 5 More
LOW IMPACT
I-5
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Monday, Oct. 20 to Friday, Oct. 24: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation.
Last Updated: 10/17/2014 1:03 PM
At milepost 11 More
LOW IMPACT
I-5
I-5 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Oct. 20 to Friday, Oct. 24: Drivers should be prepared for daily daytime intermittent lane closures on Northbound I-205 near Salmon Creek from 6 a.m. to 2 p.m.
Last Updated: 10/17/2014 12:04 PM
From milepost 7 to milepost 10 More
Zoom to Northwest
Zoom to North Central
Zoom to Northeast
Zoom to Western
Zoom to Puget Sound
Zoom to Central
Zoom to Eastern
Zoom to Southwest
Zoom to South Central
Zoom to Southeast
Zoom to Northwest Zoom to North Central Zoom to Northeast Zoom to Western Zoom to Puget Sound Zoom to Central Zoom to Eastern Zoom to Southwest Zoom to South Central Zoom to Southeast
Alerts Legend

Zoom in on the map to view more routes.
If you do not see the route you are looking for,
no problems have been reported.

Interstate:
I-5  I-82  I-90  I-205 
US Highways:
Countywide:
No Travel Alerts have been reported at this time.