Return to Map

MODERATE IMPACT
I-90 Both Directions - I-90 milepost 56 to 61 east of the summit, traffic is reduced to one lane each direction 24 hours a day for building detours to be used this construction season. Drivers should be prepared for up to 2 hours of added travel time until April 25. To minimize added travel time, drivers should be over the pass before 8 a.m., travel after 8 p.m., or consider alternate routes. On Friday April 18 at 10 a.m., two lanes will be open to eastbound traffic until 8 p.m. Last Updated: 4/17/2014 3:25 PM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Eastbound - Indian John Rest Area eastbound milepost 89: The eastbound rest area will be closed Monday, April 21 at 6 a.m. until Thursday, April 24 at 7 p.m. Last Updated: 4/17/2014 2:37 PM More Info
From milepost 87 to milepost 89
MODERATE IMPACT
I-90 Both Directions - One lane will be open in each direction at all times. The speed through the work zones is reduced to 50 mph. Monday through Friday, 7 a.m. to 9 p.m., expect single lane closures and narrowed lanes where a crew is grinding off old pavement eastbound from the Vantage bridge. Monday and Tuesday, the paving crew will be finishing the westbound lanes down to the bridge. Wednesday through Friday, they'll switch and pave the eastbound lanes starting at the bridge. Last Updated: 4/11/2014 4:22 PM More Info
From milepost 137 to milepost 148
MODERATE IMPACT
US 12 Both Directions - US 12 White Pass: Traffic is restricted to one lane through the work zone seven days a week, 24 hours a day. Alternating traffic will be controlled by a traffic signal or flaggers. Motorists can expect delays up to 15 minutes. For freight-related restrictions please visit the Commercial Vehicle Services Road Restrictions Web page. Last Updated: 4/14/2014 7:25 PM More Info
At milepost 154
MODERATE IMPACT
SR 9 Both Directions - Monday, April 14 to Friday, April 18 - One lane in both directions of SR 9 will be closed daily between 212th Street Southeast and 184th Street Southeast for permanent signage installation. Northbound closures are from 7 a.m. to 2 p.m. and southbound is from 10 a.m. to 5 p.m. This work is weather-dependent. Last Updated: 4/11/2014 8:07 AM More Info
From milepost 2 to milepost 4
MODERATE IMPACT
SR 243 Both Directions - At Mattawa, Monday through Friday, 7 a.m. to 5 p.m., expect occasional delays of up to 20 minutes with flaggers directing traffic on SR 243 or Road 24 SW as needed where crews are constructing a roundabout. Last Updated: 4/11/2014 4:51 PM More Info
At milepost 14
LOW IMPACT
I-90 Both Directions - Thorp Rd. Interchange Milepost 101: Monday April 14 through Thursday April 17, expect periodic shoulder closures on all ramps at this interchange. Last Updated: 4/15/2014 7:28 AM More Info
At milepost 101
LOW IMPACT
I-90 Both Directions - Oakes Ave. Interchange Milepost 84: April 21 through April 24, expect periodic shoulder closures on both ramps at this interchange. Last Updated: 4/14/2014 7:25 PM More Info
At milepost 84
LOW IMPACT
US 97 Both Directions - US 97 milepost 137 to 138 north of Ellensburg: A single lane temporary detour is in place. Traffic on the detour is limited to one lane and is controlled by a traffic signal. Oversize vehicle restrictions are in place. Minor delays can be anticipated. Drivers may consider alternate routes via I-90 or SR 10. Last Updated: 4/14/2014 7:26 PM More Info
From milepost 137 to milepost 138
LOW IMPACT
SR 203 Both Directions - Monday, April 14 to Friday, April 18 - A single lane in either direction of SR 203 from Carnation to Duvall will be closed from 9 a.m. to 3 p.m. daily for pavement repair. Only one lane will be closed at a time. Last Updated: 4/9/2014 12:09 PM More Info
From milepost 7 to milepost 15
LOW IMPACT
SR 410 Both Directions - Chinook Pass, State Route 410 is closed for the Season from milepost 74.5 near Morse Creek to milepost 57.5 near Crystal Mountain Blvd. due to heavy snowfall, strong winds and avalanche danger. Last Updated: 4/14/2014 7:26 PM More Info
From milepost 74 to milepost 57
LOWEST IMPACT
US 2 Westbound - The Iron Goat Interpretive Site is closed for the winter. Last Updated: 11/8/2013 11:54 AM More Info
At milepost 58
LOWEST IMPACT
US 12 Eastbound - US 12 milepost 201.9, Tuesday April 22 and Wednesday April 23, between 8 a.m. and 3:30 p.m., WSDOT crews will close one eastbound lane for bridge deck repair work. Last Updated: 4/17/2014 12:28 AM More Info
At milepost 201