Return to Map

HIGHEST IMPACT
I-5 Southbound - Road work on I-5 southbound at milepost 104.8 near Capitol Blvd/US 101 interchange, beginning at 8:19 pm on September 12, 2014 until further notice. Motorists can expect delays. Last Updated: 9/14/2014 2:04 PM More Info
At milepost 105
HIGHEST IMPACT
I-90 Both Directions - I-90 is closed eastbound at milepost 296 at Liberty Lake, all traffic must exit, westbound traffic is being diverted in Idaho, beginning at 1:34 pm on September 14, 2014 until about noon on September 15, 2014. Use other routes, expect long delays. Last Updated: 9/15/2014 12:02 AM More Info
From milepost 296 to milepost 299
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound from milepost 119.2 near Dupont to milepost 117.5 near Mounts Rd Truck Scales # 7 beginning at 8:04 pm on September 14, 2014 until about 5:00 am on September 15, 2014. Last Updated: 9/14/2014 10:20 PM More Info
From milepost 119 to milepost 118
HIGH IMPACT
I-5 Southbound - DRIVER ALERT: Sunday, Sept. 14 to the morning of Tuesday, Sept. 16 - The South Boeing Access Road on-ramp to southbound I-5 will close nightly from 10 p.m. to 5 a.m. Drivers will follow a signed detour. Last Updated: 9/11/2014 11:12 AM More Info
At milepost 158
HIGH IMPACT
I-90 Eastbound - DRIVER ALERT: Monday, September 8 to the morning Tuesday, September 23 - The eastbound I-90 exit to Bellevue Way Southeast will close 9 p.m. Monday, Sept. 8 continuously for 15 days until the morning of Tuesday, Sept. 23 for drainage, grading, and paving work. Last Updated: 8/27/2014 2:06 PM More Info
At milepost 9
HIGH IMPACT
SR 20 Both Directions - SR 20 reopened August 22 with flaggers and pilot car controlled traffic through a short section of roadway reduced to one lane about 4 miles east of the Junction of SR 20 and SR 153 outside Twisp. Expect delays of 5 to 10 minutes. Last Updated: 8/27/2014 2:28 PM More Info
At milepost 208
HIGH IMPACT
SR 21 Both Directions - Keller Ferry on SR 21 is closed in both directions at milepost 106.5 near Keller Ferry Landing from 10:00 AM on September 9, 2014 until further notice. Last Updated: 9/9/2014 12:45 PM More Info
At milepost 107
HIGH IMPACT
SR 153 Both Directions - SR 153 IS CLOSED FROM MILEPOST 22 AT CARLTON to milepost 27.63 at Benson Creek (5 miles east of Twisp) DUE TO MUDSLIDES AND ROCKS OVER THE ROADWAY. AT THIS TIME THERE IS NO ESTIMATED TIME FOR REOPENING. THERE IS A DETOUR AVAILABLE USING THE TWISP-CARLTON ROAD RUNNING PARALLEL TO THE HIGHWAY FOR 13 MILES. Last Updated: 9/10/2014 8:03 AM More Info
From milepost 22 to milepost 28
HIGH IMPACT
SR 520 Both Directions - Saturday, Sept. 13 to the morning of Monday, Sept. 15 - All 108th Avenue Northeast and 112th Avenue Northeast on- and off-ramps to SR 520 will close from 9 p.m. Saturday to 5 a.m. Monday for paving work. Last Updated: 9/3/2014 12:56 PM More Info
At milepost 6
HIGH IMPACT
SR 520 Both Directions - DRIVER ALERT: Saturday, Sept. 13 to the morning of Monday, Sept. 15 - All lanes of eastbound and westbound SR 520 between I-405 and Montlake Boulevard will close from 9 p.m. Saturday to 5 a.m. Monday for striping and paving work. Last Updated: 9/3/2014 12:45 PM More Info
From milepost 1 to milepost 7
HIGH IMPACT
SR 520 Both Directions - Sunday, Sept. 14 to the morning of Monday, Sept. 15 - The 108th Avenue Northeast and Northup Way intersection will close from 9 p.m. to 5 a.m. for paving. Last Updated: 9/3/2014 12:35 PM More Info
At milepost 6
MODERATE IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08)
Traffic Impacts: Monday, Sept. 15 to Friday, Sept. 19: Daytime and nighttime, single and double-lane closures on both directions of I-5.
Monday, Sept. 15 to Friday, Sept. 19: Daytime traffic is shifted to the left lanes on both directions of I-5, with nighttime, double-lane closures on I-5 northbound. Last Updated: 9/12/2014 8:45 AM More Info
From milepost 20 to milepost 21
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (MP 79.81 to 84.15) Monday, Sept. 15 to Friday, Sept. 19: Daytime and nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Around-the-clock, intermittent lane closures with flaggers on Mellen Street and Ellsbury Street, with detours on Ellsbury St. and Marsh Ave. Monday, Sept. 15 to Tuesday, Sept. 16: Nighttime, northbound and southbound on and off-ramp closures on I-5 from Mellen Street, from 10 p.m. to 6 a.m. Last Updated: 9/12/2014 8:42 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Southbound - I-5, Southbound, Gee Creek Rest Area Facility Improvements (milepost 12.0)
Traffic Impacts:
Starting Sept 8, there will be around-the-clock, full closure of rest area for facility improvements. Last Updated: 9/12/2014 8:28 AM More Info
At milepost 12
MODERATE IMPACT
I-5 Southbound - Sunday, Sept. 14 to the morning of Monday, Sept. 15 - The two right lanes of southbound I-5 at Albro Place will close from 11 p.m. to 6 a.m. for pavement repair. Last Updated: 9/11/2014 11:34 AM More Info
At milepost 161
MODERATE IMPACT
I-90 Both Directions - Snoqualmie Pass rock blasting closures scheduled Monday through Thursday at 6:30 p.m. lasting for one hour or more. During blasts crews will close I-90 eastbound at Gold Creek milepost 56 and westbound at Price Creek milepost 61. There are no services past Exit 53 eastbound or past Exit 70 westbound during blast closures. Last Updated: 9/12/2014 12:47 PM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 47 to 55: Lane closures Monday night through Saturday both directions 10 p.m. to 9 a.m. Be alert for traffic revisions and lane shifts. Daytime single lane closures Monday through Saturday. Last Updated: 9/12/2014 12:46 PM More Info
From milepost 47 to milepost 55
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 56 to 61: Daytime Restrictions: Drivers should prepare for occasional rolling slowdowns both directions, Monday through Friday, during daytime hours.
Nighttime Restrictions: Traffic will be reduced to one lane in both directions, Monday through Friday, during nighttime hours. Last Updated: 9/12/2014 12:43 PM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 61 to 65: No impacts to traffic this week. Last Updated: 9/12/2014 12:43 PM More Info
From milepost 61 to milepost 65
MODERATE IMPACT
I-90 Both Directions - I-90 mileposts 65 to 67: No impacts to traffic this week. Last Updated: 9/12/2014 12:43 PM More Info
From milepost 65 to milepost 67
MODERATE IMPACT
I-90 Both Directions - Sunday, Sept. 14 to the morning of Friday, Sept. 19 - The I-90 HOV express lanes entrance from Seattle Boulevard South will close nightly from 9 p.m. to 4 a.m. for Sound Transit work. Drivers will follow a signed detour Last Updated: 9/12/2014 11:13 AM More Info
At milepost 0
MODERATE IMPACT
US 2 Both Directions - Monday through Thursday 6 a.m. to 8 p.m., expect lane shifts and shoulder closures in the 6 mile long four lane section from the summit down to the Railroad tunnel portal.
Monday, pavement repair should be complete.
Tuesday through Thursday, paving will be underway.
Speed through the work zone is reduced to 45. When outside lanes and shoulders need to be closed, bicyclists and pedestrians are being bussed around the work zone. Last Updated: 8/22/2014 4:42 PM More Info
From milepost 64 to milepost 72
MODERATE IMPACT
US 2 Both Directions - work is suspended until September 8 so the new asphalt pavement can cure before the plastic markings and stripes can be installed.
No traffic restrictions. Last Updated: 8/22/2014 4:41 PM More Info
From milepost 61 to milepost 64
MODERATE IMPACT
US 97 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23, SR 14 mileposts 100.5 to 102.0)
Traffic Impacts: Monday, Sept. 15 to Thursday, Sept. 18: Daytime, single-lane closures, with flaggers. Last Updated: 9/12/2014 9:45 AM More Info
From milepost 2 to milepost 3
MODERATE IMPACT
SR 14 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23 and SR 14 mileposts 100.5 to 102.0)
Traffic Impacts:
Monday, Sept. 15 to Thursday, Sept. 18: Daytime, single-lane closures, with flaggers. Last Updated: 9/12/2014 9:44 AM More Info
From milepost 100 to milepost 102
MODERATE IMPACT
SR 14 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, Sept. 15 to Friday, Sept. 19: Daytime, intermittent, single-lane closures with flaggers and a pilot car, on SR 14, SR 141 and US 197. Last Updated: 9/12/2014 9:43 AM More Info
From milepost 67 to milepost 103
MODERATE IMPACT
SR 141 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, Sept. 15 to Friday, Sept. 19: Daytime, intermittent, single-lane closures with flaggers and a pilot car, on SR 14, SR 141 and US 197. Last Updated: 9/12/2014 9:44 AM More Info
From milepost 0 to milepost 30
MODERATE IMPACT
US 197 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, Sept. 15 to Friday, Sept. 19: Daytime, intermittent, single-lane closures with flaggers and a pilot car, on SR 14, SR 141 and US 197. Last Updated: 9/12/2014 9:44 AM More Info
From milepost 1 to milepost 4
MODERATE IMPACT
SR 240 Eastbound - SR 240 eastbound milepost 34 to 36, Richland: Monday, Sept 15 from 7:30 a.m. to 3 p.m., expect lane closures between Duportail and Aaron Way, and a right lane closure on the on ramp to eastbound I-182. The on ramp from SR 240 eastbound to I-182 westbound will be closed from 7:30 a.m. to 11 a.m. Last Updated: 9/12/2014 12:53 PM More Info
From milepost 34 to milepost 36
MODERATE IMPACT
SR 508 Both Directions - SR 508 to SR 7 - Paving and Sealing Road improvements (mileposts 0.20 to 32.84)
Traffic Impacts:
Monday, Sept. 15 to Friday, Sept. 19: No scheduled traffic impacts. Last Updated: 9/12/2014 9:46 AM More Info
From milepost 0 to milepost 33
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction
Traffic Impacts:
SR 508 is restricted to vehicles weighing more than seven tons. Trucks and large passenger vehicles should follow posted detour signs: Eastbound drivers, take Leonard Road to US 12. Westbound drivers, take Cinebar Road to Silver Creek Road/SR 122 to US 12. Last Updated: 3/14/2014 10:53 AM More Info
At milepost 14
MODERATE IMPACT
SR 522 Both Directions - **DRIVER ALERT**Tuesday, September 2 to the morning of Wednesday, October 1 - The ramp from SR 522 to eastbound US 2 will be closed around-the-clock from 10 p.m. Tuesday, September 2 to 5 a.m. Wednesday, October 1 for work on the 179th Bridge. Drivers will follow a signed detour. Last Updated: 8/29/2014 10:38 AM More Info
At milepost 25
MODERATE IMPACT
SR 532 Both Directions - Sunday, Sept. 14 to the morning of Monday, Sept. 15 - One lane of SR 532 will be closed between Smith Road and Eide Road from 8:30 p.m. to 6 a.m. for striping. Last Updated: 9/12/2014 9:43 AM More Info
From milepost 2 to milepost 4
MODERATE IMPACT
SR 539 Northbound - Wednesday, Sept. 3 to Friday, Sept. 5 – One lane of SR 539 will be closed near the border daily from 7 a.m. to 5 p.m. for pavement work. Flaggers will direct traffic through the work zone. Last Updated: 8/28/2014 1:31 PM More Info
From milepost 15 to milepost 16
MODERATE IMPACT
SR 900 Southbound - Sunday, Sept. 14 to the morning of Tuesday, Sept. 16 -Southbound Martin Luther King Jr. Way South/SR 900 will close nightly at South Boeing Access Road from 10 p.m. to 5 a.m. Drivers will follow a signed detour. Last Updated: 9/11/2014 11:11 AM More Info
At milepost 6
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93)
Sunday, Sept. 14 to Thursday, Sept. 18: Nighttime, single and double-lane closures on both directions of I-5 from NE 99th Street to NE 39th Street. Southbound lanes from 8 p.m. Sunday, Sept. 14 to 5 a.m. Friday, Sept. 19, and northbound lanes from 10 p.m. Sunday, Sept. 14 to 6 a.m. Friday, Sept. 19. Last Updated: 9/12/2014 9:47 AM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Monday, Sept. 15 to Friday, Sept. 19: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. Last Updated: 9/12/2014 9:42 AM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Sept. 15 to Friday, Sept. 19: Daytime, intermittent, alternating, single-lane closures and rolling slowdowns on both direction of I-205. Monday, Sept. 15 to Thursday, Sept. 18: Nighttime, intermittent, alternating, single-lane closures, on northbound I-5 and I-205. Monday, Sept. 15 to Friday, Sept. 19: Daytime and nighttime, single-lane closures throughout NE 134th Street and NE 20th Avenue. Last Updated: 9/12/2014 8:34 AM More Info
From milepost 7 to milepost 10
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46)
Traffic Impacts: No scheduled traffic impacts. Last Updated: 9/5/2014 10:10 AM More Info
From milepost 10 to milepost 20
LOW IMPACT
I-90 Both Directions - Bicycle Alternate Route: I-90 is closed to bicycles in both directions between Hyak (Exit 54) and Stampede Pass interchange (exit 62) because there is no shoulder for bicycles to use. Bicyclists can use the John Wayne Pioneer Trail, weather permitting, as an alternate route. Last Updated: 9/12/2014 12:47 PM More Info
From milepost 54 to milepost 62
LOW IMPACT
I-90 Eastbound - I-90 milepost 137, Vantage Bridge: Monday Sept. 15 between 7:30 a.m. to 3:30 p.m., the eastbound right lane will be closed for bridge repair work. Last Updated: 9/12/2014 12:37 PM More Info
At milepost 137
LOW IMPACT
I-205 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Sept. 15 to Friday, Sept. 19: Daytime, intermittent, alternating, single-lane closures and rolling slowdowns on both direction of I-205. Monday, Sept. 15 to Thursday, Sept. 18: Nighttime, intermittent, alternating, single-lane closures, on northbound I-5 and I-205. Monday, Sept. 15 to Friday, Sept. 19: Daytime and nighttime, single-lane closures throughout NE 134th Street and NE 20th Avenue. Last Updated: 9/12/2014 8:37 AM More Info
From milepost 36 to milepost 38
LOW IMPACT
US 12 Both Directions - US 12 milepost 154 White Pass: Monday, Sept 15 through Friday Sept 19, 6:30 a.m. to 5 p.m., motorist can expect 30 minute delays. Last Updated: 9/12/2014 12:38 PM More Info
At milepost 154
LOW IMPACT
US 101 Both Directions - US 101 - Middle Nemah River Bridge Replacement (mileposts 33.04 to 33.99)
Traffic Impacts:
No scheduled traffic impacts. Last Updated: 5/16/2014 9:06 AM More Info
From milepost 33 to milepost 34
LOW IMPACT
US 101 Both Directions - US 101, Astoria Megler Bridge Painting Project (milepost 0.00 to 0.72) – ODOT

A 35 mph speed limit through the construction zone will be maintained for the duration of the project. Expect single-lane traffic and 20-minute delays anytime on weekdays and weekends. Last Updated: 1/19/2012 11:49 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 4 Both Directions - SR 4, Ocean Beach Highway Sanitary Sewer Replacement (mileposts 60.3 to 60.8)
Monday, Sept. 15 to Friday, Sept. 19: Nighttime, single-lane traffic on Ocean Beach Highway between Washington Way and 15th Avenue. Intermittent closures of business driveways for equipment staging. Last Updated: 9/12/2014 9:43 AM More Info
From milepost 60 to milepost 61
LOW IMPACT
SR 6 Both Directions - SR 6, Willapa River Bridge - Bridge Replacement (mileposts 6.86 to 7.26)
Monday, Sept. 15 to Friday, Sept. 19: No scheduled traffic impacts. Last Updated: 9/12/2014 8:40 AM More Info
From milepost 7 to milepost 8
LOW IMPACT
SR 14 Both Directions - SR 14, Both directions on Bridge of the Gods (milepost 41.55)
Saturday, Sept. 6: Daytime, full-lane closures in both directions of the bridge for the Cascade Locks Bridge Walk, from 9 a.m. to 9:45 a.m. Last Updated: 9/4/2014 3:40 PM More Info
At milepost 42
LOW IMPACT
SR 14 Both Directions - SR 14, Both directions on Bridge of the Gods (milepost 41.55)
Saturday, Sept. 6: Daytime, full-lane closures in both directions of the bridge for the Cascade Locks Bridge Walk, from 9 a.m. to 9:45 a.m. Last Updated: 9/4/2014 3:38 PM More Info
At milepost 42
LOW IMPACT
SR 14 Both Directions - SR 14 at Bridge of the Gods (milepost 41.6)
Drivers crossing the Bridge of the Gods should expect intermittent delays of up to 20 minutes. Last Updated: 4/4/2014 1:34 PM More Info
At milepost 42
LOW IMPACT
SR 105 Both Directions - SR 105, Smith Creek and North River - Bridge Replacements (mileposts 6.25 to 13.65)
Traffic Impacts:
Monday, Sept. 15 to Friday, Sept. 19: No scheduled traffic impacts. Last Updated: 9/12/2014 8:39 AM More Info
From milepost 6 to milepost 14
LOW IMPACT
SR 240 Eastbound - SR 240 eastbound milepost 34 to 36 and I-182 milepost 4, Richland: Tuesday, Sept 16, from 7:30 a.m. to 4 p.m. The left lane will be closed on SR 240 eastbound between Duportail and Aaron Way. The left lane will be closed of the on ramp to I-182 eastbound. The left lane will be closed on the off ramp from I-182 westbound to SR 240 westbound. Last Updated: 9/13/2014 4:13 AM More Info
From milepost 34 to milepost 36
LOW IMPACT
SR 410 Both Directions - SR 410 mileposts 69 to 71, east of Chinook Pass summit: Monday, Sept 15 through Thursday, September 18, 7 a.m. to 5 p.m., motorists can expect 30 minute delays. No work is scheduled Friday through Sunday. Last Updated: 9/12/2014 12:42 PM More Info
From milepost 69 to milepost 71
LOW IMPACT
SR 411 Both Directions - SR 411, City of Kelso - West Main Street Realignment (mileposts 1.50 to 1.75)
Traffic Impacts: No scheduled traffic impacts.
NOTE: Access on SR 411 between Washington and Grant is now open to through-traffic. The intersection of SR 411 and Main Street/Allen Street is controlled by a four-way stop. Last Updated: 9/12/2014 8:52 AM More Info
From milepost 2 to milepost 2
LOW IMPACT
SR 411 Both Directions - SR 411, City of Castle Rock - Front Avenue Improvement (mileposts 12.6 to 13.2)
Traffic Impacts:
No scheduled traffic impacts. Last Updated: 12/20/2013 8:44 AM More Info
From milepost 13 to milepost 14
LOW IMPACT
SR 433 Both Directions - SR 433 at the Lewis and Clark Bridge (milepost 0.0)
Traffic Impacts:
No Scheduled traffic impacts. Last Updated: 8/29/2014 8:55 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 502 Both Directions - SR 502 Widening from I-5 to Battle Ground (MP 0.59 to 6.61) Saturday, Sept. 13: Multiple, intermittent, daytime, single-lane closures with flaggers, throughout the project limits, for paving. Monday, Sept. 15 to Friday, Sept. 19: Multiple, daytime, intermittent, single-lane closures with flaggers, throughout the 6 mile length of the project limits, from 9 a.m. to 3 p.m. daily. Last Updated: 9/12/2014 9:40 AM More Info
From milepost 1 to milepost 7
LOW IMPACT
SR 504 Both Directions - SR 504, Both directions between Hummocks Trail east to Loowit viewpoint (mileposts 45.0 to 52.0)
SR 504 has been closed for the winter season starting Saturday, Nov. 16. Last Updated: 11/22/2013 2:34 PM More Info
From milepost 45 to milepost 52
LOW IMPACT
SR 507 Both Directions - SR 507, Yew Street Intersection Improvements (mileposts 0.22 to 0.32)
Traffic Impacts:
Monday, Sept. 15 to Thursday, Sept. 18: Daytime, single-lane closures, with flaggers. Last Updated: 9/12/2014 9:47 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 530 Both Directions - Thursday, September 11 to Friday, September 19 - Drivers should expect traffic to be flagged in both directions from 6 a.m. to 6 p.m. daily for roadway work. Wait times have been about 10 minutes. Last Updated: 9/12/2014 11:26 AM More Info
From milepost 36 to milepost 39
LOWEST IMPACT
I-5 Southbound - I-5, Southbound, between Pioneer Street on-ramp to Northeast 179th Street (milepost 14.0 to 9.46)
Sunday, Sept. 14 to Wednesday, Sept. 16: Daytime, double-left and center-lane closures for concrete slab repairs. Last Updated: 9/12/2014 11:08 AM More Info
From milepost 14 to milepost 10
LOWEST IMPACT
I-90 Westbound - I-90 westbound milepost 50, Denny Creek Bridge: Tuesday, Sept 16 through Thursday, Sept 18, from 7:30 a.m. to 3:30 p.m. the right lane will be closed for bridge maintenance. Last Updated: 9/12/2014 12:51 PM More Info
At milepost 50
LOWEST IMPACT
US 97 Both Directions - US 97, Biggs Rapid Bridge Painting (mileposts 0.25 to 0.49)
Traffic Impacts:
Monday, Sept. 15 to Friday, Sept. 19: Nighttime, intermittent, single-lane closures with flaggers for installation of construction signs on bridge. Last Updated: 9/12/2014 9:51 AM More Info
From milepost 0 to milepost 1
LOWEST IMPACT
US 101 Both Directions - US 101, Both directions, between Greenhead Slough and the Willapa Wildlife Refuge (milepost 24.0)
Monday, Sept. 15 to Thursday, Sept. 18: Daytime, single-lane closures with flaggers and pilot car for roadside maintenance and paving. Last Updated: 9/12/2014 11:04 AM More Info
At milepost 24
LOWEST IMPACT
SR 6 Both Directions - SR 6, Rock Creek East and West Bridges - Replacement (mileposts 25.95 to 26.94)
Traffic Impacts:
Monday, Sept. 15 to Friday, Sept. 19: Daytime, intermittent, single-lane closures with flaggers from 6 a.m. Monday to 4:30 p.m. Friday. Last Updated: 9/12/2014 8:43 AM More Info
From milepost 26 to milepost 27
LOWEST IMPACT
SR 10 Both Directions - SR 10 milepost 92 to 94: Monday, Sept 15 through Thursday, Sept 18 between 8 a.m. and 3 p.m., expect one lane flagging and pilot car controlled traffic for ditching work. Last Updated: 9/12/2014 12:41 PM More Info
At milepost 92
LOWEST IMPACT
SR 125 Both Directions - SR 125 milepost 15 to 18: Wednesday, Sept 17 and Thursday, Sept 18 between 7 a.m. to 3 p.m. motorists will experience one lane traffic for pavement repair work. Last Updated: 9/12/2014 12:40 PM More Info
From milepost 15 to milepost 18
LOWEST IMPACT
SR 141 Both Directions - SR 141, White Salmon River Bridge Painting (mileposts 8.70 to 8.72)
Traffic Impacts:
Saturday, Sept. 15 to Friday, Sept. 19: Daytime traffic controlled by automatic signal for the duration of the project's timeframe. Last Updated: 9/12/2014 11:00 AM More Info
From milepost 9 to milepost 9
LOWEST IMPACT
SR 411 Both Directions - SR 411, Slope Repair Vicinity of Hazel Dell Road (mileposts 6.0 to 6.30)
Traffic Impacts:
Monday, Sept. 15 to Friday, Sept. 19: Daytime, single-lane and shoulder closures, with flaggers on SR 411, from 8 a.m. to 3:30 p.m. daily. Last Updated: 9/12/2014 11:06 AM More Info
From milepost 6 to milepost 7
LOWEST IMPACT
SR 411 Both Directions - SR 411 - Huntington Avenue Sidewalk Improvements (mileposts 12.46 to 12.7)
Traffic Impacts: No scheduled traffic impacts. Last Updated: 9/12/2014 9:38 AM More Info
From milepost 12 to milepost 13
LOWEST IMPACT
SR 503 Both Directions - SR 503, Both directions, between Rudy Ross Road and McCracken Road (milepost 51.09 to 51.21)
Monday, Sept. 15 to Friday, Sept. 19: Daytime, single-lane and shoulder closures, with pilot car, for roadside maintenance. Last Updated: 9/12/2014 11:03 AM More Info
From milepost 51 to milepost 52