Return to Map

HIGHEST IMPACT
I-5 Northbound - Update 12:26 PM : On I-5 northbound just south of Main St. (MP 263) there is a collision blocking the left lane. Medical Aid, Fire Assistance, and the State Patrol have arrived on the scene. Last Updated: 8/23/2014 12:27 PM More Info
At milepost 263
HIGH IMPACT
I-90 Both Directions - Washington State Patrol officers will control traffic at the bottom of the I-90/SR 18 interchange ramps on Friday, August 22, 2014, from 11:00 a.m. until 7:00 p.m., and from 7:00 a.m. to 7:00 p.m. on both Saturday, August 23, 2014, and Sunday, August 24, 2014. The traffic control is in place to help alleviate intersection congestion during the final days of the nearby Boeing Classic Golf Tournament. Last Updated: 8/21/2014 2:54 PM More Info
At milepost 26
HIGH IMPACT
SR 20 Both Directions - SR 20 reopened to traffic at 4:30 p.m. Friday with flaggers and pilot car controlled traffic through a short section of roadway reduced to one lane about 4 miles east of the Junction of SR 20 and SR 153 outside Twisp. Expect delays of 10 minutes or less. Last Updated: 8/22/2014 4:39 PM More Info
At milepost 208
HIGH IMPACT
SR 153 Both Directions - SR 153 IS CLOSED FROM MILEPOST 30.75 AT TWISP AND THE JUNCTION WITH SR 20 TO MILEPOST 22 AT CARLTON DUE TO MUDSLIDES AND ROCKS OVER THE ROADWAY. AT THIS TIME THERE IS NO ESTIMATED TIME FOR REOPENING. THERE IS A DETOUR AVAILABLE USING LOCAL ROADS. Last Updated: 8/22/2014 9:03 AM More Info
From milepost 31 to milepost 22
HIGH IMPACT
SR 161 Southbound - Road work on SR 161 southbound at milepost 12.0 near Barney Larson Rd beginning at 8:40 am on August 23, 2014 until about 3:15 pm. Last Updated: 8/23/2014 8:45 AM More Info
At milepost 12
HIGH IMPACT
SR 161 Southbound - Road work on SR 161 southbound at milepost 6.0 near Blau Rd beginning at 8:30 am on August 23, 2014 until about 3:15 pm. Last Updated: 8/23/2014 8:44 AM More Info
At milepost 6
HIGH IMPACT
SR 241 Both Directions - SR 241 milepost 1: Sunday, August 24 through Sunday, August 29, continued road closure during bridge repair operations. State Route 223 to State Route 22 is the alternate route, as well as a signed detour route utilizing local roads. Last Updated: 8/23/2014 8:23 AM More Info
From milepost 1 to milepost 2
HIGH IMPACT
SR 520 Westbound - Friday, August 22 to the morning of Monday, August 25 - The Bellevue Way Northeast on-ramp to westbound SR 520 will close from 11 p.m. Friday to 5 a.m. Monday for construction work. Last Updated: 8/12/2014 2:44 PM More Info
At milepost 6
HIGH IMPACT
SR 520 Eastbound - Friday, August 22 to the morning of Monday, August 25 - The eastbound SR 520 off-ramp to Bellevue Way Northeast will close from 11 p.m. Friday to 5 a.m. Monday for construction work. Last Updated: 8/12/2014 2:42 PM More Info
At milepost 6
MODERATE IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08) Traffic Impacts: Sunday, Aug. 24 to Friday, Aug. 29: Daytime and nighttime, single-lane closures on both directions of I-5. Thursday Aug. 21 to Friday, Aug. 29: Daytime traffic is shifted to the left lanes on both directions of I-5, with nighttime, double-lane closures on I-5 northbound. Last Updated: 8/22/2014 10:08 AM More Info
From milepost 20 to milepost 21
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (MP 79.81 to 84.15) Saturday, Aug. 23: Daytime, single-lane closures with flaggers on Mellen Street, from 6 a.m. to 5 p.m. Monday, Aug. 25 to Friday, Aug. 29: Nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Intermittent daytime and nighttime closures and flaggers on Mellen Street and Ellsbury Street. Monday, Aug. 25 to Thursday, Aug. 28: Nighttime, I-5, southbound Mellen Street on and off-ramp closures. Last Updated: 8/22/2014 10:06 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-90 Both Directions - Snoqualmie Pass Rock Blasting: New blast starting time of 7 p.m. this week. Rock blasting is scheduled for Monday through Wednesday from 7 p.m. to 8 p.m. During blasting I-90 will be closed at milepost 56 near Gold Creek to milepost 61 near Price Creek. Throughout closures there are no services eastbound past milepost 53 and westbound past milepost 70. Last Updated: 8/23/2014 8:35 AM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 56 to 61: Daytime Restrictions: Drivers should prepare for occasional rolling slowdowns both directions, Monday through Friday, during daytime hours. Nighttime Restrictions: Traffic will be reduced to one lane in both directions, Monday through Saturday, during nighttime hours. Last Updated: 8/23/2014 8:03 AM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 47 to 55: Eastbound: Right lane closures 24 hours a day. Work hours are primarily Monday night through Friday morning from 10 p.m. to 9 a.m. If you notice that there are lane closures with no apparent work going on, our contractor has placed new concrete in the roadway which must cure to gain strength. Westbound: Single lane closures 24 hours a day Monday night through Friday morning from 10 p.m. to 9 a.m. Be alert for other traffic revisions and lane shifts. Last Updated: 8/23/2014 7:52 AM More Info
From milepost 47 to milepost 55
MODERATE IMPACT
I-90 Both Directions - Minor items may be underway. Drivers should be alert for lane restrictions. Last Updated: 8/14/2014 10:53 AM More Info
From milepost 255 to milepost 265
MODERATE IMPACT
US 2 Both Directions - work is suspended until September 8 so the new asphalt pavement can cure before the plastic markings and stripes can be installed. No traffic restrictions. Last Updated: 8/22/2014 4:41 PM More Info
From milepost 61 to milepost 64
MODERATE IMPACT
US 2 Both Directions - Re surfacing work will be underway from Espanola Road to Interstate 90. This includes US 2 through Airway Heights. Most asphalt paving work will be done during evening and overnight hours. Drivers should be alert for lane restrictions, rough pavement, and possible delays. Motorcyclists should use cuation on rogh pavement. Last Updated: 6/26/2014 11:39 AM More Info
From milepost 271 to milepost 284
MODERATE IMPACT
US 97 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23, SR 14 mileposts 100.5 to 102.0) Traffic Impacts: Monday, Aug. 18 to Thursday, Aug. 21: Daytime, single-lane closures, with flaggers. Last Updated: 8/15/2014 11:46 AM More Info
From milepost 2 to milepost 3
MODERATE IMPACT
SR 8 Westbound - Westbound State Route 8 is reduced to one lane around the clock between mileposts 17.5 and 19 near the Summit Lake Grocery for clean-up activities following a previous fuel spill. Truckers hauling cargo over 14 feet wide are not allowed through the workzone and are detoured onto US 101. Last Updated: 8/8/2014 3:22 PM More Info
From milepost 18 to milepost 19
MODERATE IMPACT
SR 9 Both Directions - **DRIVER ALERT Thursday, August 21 to Friday, August 29** - No left turns from any direction at the intersection of SR 9 and 84th Street Northeast will be allowed from 9 p.m. Thursday, Aug. 21 through noon on Friday, Aug. 29 for roundabout construction. Drivers will follow signed detours. Northbound and southbound traffic on SR 9 will remain open at all times. Right hand turns will be allowed. Last Updated: 8/21/2014 9:44 AM More Info
From milepost 20 to milepost 21
MODERATE IMPACT
SR 14 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23 and SR 14 mileposts 100.5 to 102.0) Traffic Impacts: Monday, Aug. 25 to Thursday, Aug. 29: Daytime, single-lane closures, with flaggers. Last Updated: 8/22/2014 10:40 AM More Info
From milepost 100 to milepost 102
MODERATE IMPACT
SR 14 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Saturday, Aug. 23 to Sunday, Aug. 24: Around-the-clock, intermittent, single-lane closures with flaggers and a pilot car, on SR 14. Monday, Aug. 25 to Thursday, Aug. 28: Daytime, single-lane closures with flaggers and pilot car on SR 14 and SR 141. Last Updated: 8/22/2014 10:36 AM More Info
From milepost 67 to milepost 103
MODERATE IMPACT
SR 99 Both Directions - On SR 99 northbound & southbound from S Spokane St (MP 29) to Valley St (MP 33) all lanes are closed due to roadwork. Last Updated: 8/23/2014 11:47 AM More Info
From milepost 29 to milepost 33
MODERATE IMPACT
SR 141 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Saturday, Aug. 23 to Sunday, Aug. 24: Around-the-clock, intermittent, single-lane closures with flaggers and a pilot car, on SR 14. Monday, Aug. 25 to Thursday, Aug. 28: Daytime, single-lane closures with flaggers and pilot car on SR 14 and SR 141. Last Updated: 8/22/2014 10:38 AM More Info
From milepost 0 to milepost 30
MODERATE IMPACT
US 197 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Saturday, Aug. 23 to Sunday, Aug. 24: Around-the-clock, intermittent, single-lane closures with flaggers and a pilot car, on SR 14. Monday, Aug. 25 to Thursday, Aug. 28: Daytime, single-lane closures with flaggers and pilot car on SR 14 and SR 141. Last Updated: 8/22/2014 10:37 AM More Info
From milepost 1 to milepost 4
MODERATE IMPACT
SR 508 Both Directions - SR 508 to SR 7 - Paving and Sealing Road improvements (mileposts 0.20 to 32.84) Traffic Impacts: Monday, Aug. 25 to Friday, Aug. 29: Daytime, single-lane closures with pilot car for paving and sealing along SR 508, from 7 a.m. to 7 p.m. Last Updated: 8/22/2014 10:40 AM More Info
From milepost 0 to milepost 33
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction Traffic Impacts: SR 508 is restricted to vehicles weighing more than seven tons. Trucks and large passenger vehicles should follow posted detour signs: Eastbound drivers, take Leonard Road to US 12. Westbound drivers, take Cinebar Road to Silver Creek Road/SR 122 to US 12. Last Updated: 3/14/2014 10:53 AM More Info
At milepost 14
MODERATE IMPACT
SR 523 Both Directions - On SR 523 westbound & eastbound at 5th Ave NE (MP 1) traffic is reduced to 1 lane in both directions. Last Updated: 8/23/2014 12:28 PM More Info
At milepost 1
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93) Friday, Aug. 22 to Saturday, Aug. 23: Nighttime, single and double-lane closures, on southbound I-5, from 99th Street to NE 39th Street, from 8 p.m. Friday, to 7 a.m. Saturday. Sunday, Aug. 24: Nighttime, single and double-lane closures, on I-5 southbound from NE 99th Street to NE 39th Street, from 8 p.m. Sunday, to 5 a.m. Monday. Last Updated: 8/22/2014 10:42 AM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Friday, Aug. 22 to Monday, Aug. 25: Full-lane closure on SR 501-Pioneer St. between North 45th Avenue and South 56th Place, from 10 p.m. Friday, to 5 a.m. Monday. Monday, Aug. 25 to Friday, Aug. 29: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. Last Updated: 8/22/2014 10:25 AM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46) Traffic Impacts: No scheduled traffic impacts. Last Updated: 8/22/2014 10:22 AM More Info
From milepost 10 to milepost 20
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Aug. 25 to Friday, Aug. 29: Daytime, intermittent, alternating, single-lane closures and rolling slowdowns on both directions of I-205. Monday, Aug. 25 to Friday, Aug. 29: Nighttime, intermittent, alternating, single-lane closures on both directions of I-5 and I-205. From 10 p.m. Monday, to 7 a.m. Friday, on I-5, and from 8 p.m. Monday, to 6 a.m. Friday, on I-205, and single-lane closures on NE 134th St. Last Updated: 8/22/2014 9:11 AM More Info
From milepost 7 to milepost 10
LOW IMPACT
I-90 Both Directions - I-90 eastbound milepost 67.7 to 69.5: Monday, August 25 through Thursday, August 29, 6 a.m. to 5:30 p.m., the right lane will be closed for concrete repair. Last Updated: 8/23/2014 8:14 AM More Info
From milepost 68 to milepost 70
LOW IMPACT
I-90 Westbound - I-90 milepost 123 to 126 westbound: Monday, August 25 through Wednesday, August 27, motorist can expect lane closures during work operations. One through lane will be open at all times. Where the westbound roadway is reduced to one lane the regulatory speed limit will be reduced to 60 mph. Last Updated: 8/23/2014 8:08 AM More Info
From milepost 123 to milepost 126
LOW IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 61 to 65: Eastbound: Nightly single lane closures can be expected Monday through Thursday, from 10 p.m. until 9 a.m. the following morning. Westbound: Nightly single lane closures can be expected Monday through Thursday, from 10 p.m. until 9 a.m. the following morning. Last Updated: 8/23/2014 8:02 AM More Info
From milepost 61 to milepost 65
LOW IMPACT
I-90 Both Directions - Bicycle Alternate Route: I-90 is closed to bicycles in both directions between Hyak (Exit 54) and Stampede Pass interchange (exit 62) because there is no shoulder for bicycles to use. Bicyclists can use the John Wayne Pioneer Trail, weather permitting, as an alternate route. Last Updated: 8/20/2014 1:30 AM More Info
From milepost 54 to milepost 62
LOW IMPACT
I-90 Both Directions - Drivers should expect lane restrictions from 7 p.m. in the evening until 6 a.m. the following morning. Possible slow traffic during those hours. Last Updated: 8/14/2014 10:53 AM More Info
From milepost 294 to milepost 300
LOW IMPACT
I-205 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Aug. 25 to Friday, Aug. 29: Daytime, intermittent, alternating, single-lane closures and rolling slowdowns on both directions of I-205. Monday, Aug. 25 to Friday, Aug. 29: Nighttime, intermittent, alternating, single-lane closures on both directions of I-5 and I-205. From 10 p.m. Monday, to 7 a.m. Friday, on I-5, and from 8 p.m. Monday, to 6 a.m. Friday, on I-205, and single-lane closures on NE 134th St. Last Updated: 8/22/2014 9:11 AM More Info
From milepost 36 to milepost 38
LOW IMPACT
US 2 Both Directions - Monday through Thursday 6 a.m. to 8 p.m., expect lane shifts and shoulder closures in the 6 mile long four lane section from the summit down to the Railroad tunnel portal. Monday, pavement repair should be complete. Tuesday through Thursday, paving will be underway. Speed through the work zone is reduced to 45. When outside lanes and shoulders need to be closed, bicyclists and pedestrians are being bussed around the work zone. Last Updated: 8/22/2014 4:42 PM More Info
From milepost 64 to milepost 72
LOW IMPACT
US 2 Both Directions - Paving is underway evenings and overnight hours, from about 7 p.m. until as late as 6 a.m. the following morning. Drivers should be alert for single-lane traffic directed by flaggers and pilot cars with delays up to 20 minutes. Drivers should be very alert for grooved pavement and abrupt lane edges. Motorcyclists need to use extreme caution on grooved surfaces and abrupt lane edges. Last Updated: 7/3/2014 10:30 AM More Info
From milepost 306 to milepost 316
LOW IMPACT
US 12 Both Directions - US12 mileposts 326 to 328: Monday, August 25, 6 a.m. to 4:30 p.m., crews will be adding shoulder rock to edge drop off areas using a rolling slow down. Expect short delays. Last Updated: 8/23/2014 8:11 AM More Info
From milepost 326 to milepost 328
LOW IMPACT
US 97 Both Directions - US 97 mileposts 143 to 145: Monday, August 25 and Tuesday, August 26, 7 a.m. to 3:30 p.m., ditching operations. Expect trucks entering and exiting the highway. Last Updated: 8/23/2014 8:15 AM More Info
From milepost 143 to milepost 145
LOW IMPACT
US 101 Both Directions - US 101 traffic will shift to a new alignment for 1.5 miles east of Port Angeles while crews work on an old highway segment. Two lanes will remain open to traffic. Speed limits through the area are reduced to 45 miles per hour. Last Updated: 7/22/2014 2:36 PM More Info
From milepost 257 to milepost 259
LOW IMPACT
US 101 Both Directions - US 101 - Middle Nemah River Bridge Replacement (mileposts 33.04 to 33.99) Traffic Impacts: No scheduled traffic impacts. Last Updated: 5/16/2014 9:06 AM More Info
From milepost 33 to milepost 34
LOW IMPACT
US 101 Both Directions - US 101, Astoria Megler Bridge Painting Project (milepost 0.00 to 0.72) – ODOT A 35 mph speed limit through the construction zone will be maintained for the duration of the project. Expect single-lane traffic and 20-minute delays anytime on weekdays and weekends. Last Updated: 1/19/2012 11:49 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 4 Both Directions - SR 4, Ocean Beach Highway Sanitary Sewer Replacement (mileposts 60.3 to 60.8) Sunday, Aug. 24 to Friday, Aug. 29: Daytime, and nighttime, single-lane closures, westbound on Ocean Beach Highway, between Washington Way and 15th Avenue, from 8 p.m. Sunday, Aug, 24 to 10 a.m. Friday, Aug. 29. Last Updated: 8/22/2014 10:35 AM More Info
From milepost 60 to milepost 61
LOW IMPACT
SR 6 Both Directions - SR 6, Willapa River Bridge - Bridge Replacement (mileposts 6.86 to 7.26) Traffic Impacts: Monday, Aug. 25 to Friday, Aug. 29: No scheduled traffic impacts. Last Updated: 8/22/2014 9:55 AM More Info
From milepost 7 to milepost 8
LOW IMPACT
SR 10 Both Directions - SR10 mileposts 90 to 102: Wednesday, August 27 and Thursday, August 28, 7 a.m. to 3:30 p.m., ditching operations. Expect one lane flagger controlled traffic. Last Updated: 8/23/2014 8:13 AM More Info
From milepost 90 to milepost 102
LOW IMPACT
SR 14 Both Directions - SR 14 at Bridge of the Gods (milepost 41.6) Drivers crossing the Bridge of the Gods should expect intermittent delays of up to 20 minutes. Last Updated: 4/4/2014 1:34 PM More Info
At milepost 42
LOW IMPACT
SR 105 Both Directions - SR 105, Smith Creek and North River - Bridge Replacements (mileposts 6.25 to 13.65) Traffic Impacts: Sunday, Aug. 24 to Friday, Aug. 29: Daytime, intermittent, single-lane closures with flagger. The speed limit is 55 mph in the project area. Last Updated: 8/22/2014 9:54 AM More Info
From milepost 6 to milepost 14
LOW IMPACT
SR 215 Both Directions - Monday through Thursday-Days, 7 a.m. to 5 p.m., expect lane shifts or closures where a crew is crack sealing the center turn lanes and parking/shoulder areas from Okanogan north. At the intersection of US 97 and SR 215 expect shoulder closures. The traffic islands and sidewalk ramps are being reconstructed, to bring them up to ADA standards. Nights, 7 p.m. to 6 a.m.: Paving continues in Omak and requires lane shifts or closures with some alternating one-lane flagger controlled traffic. Last Updated: 8/22/2014 4:47 PM More Info
From milepost 0 to milepost 7
LOW IMPACT
SR 410 Both Directions - SR 410 mileposts 69 to 71, east of Chinook Pass summit: Monday, August 25 through Thursday, August 28, 6:30 a.m. to 5 p.m., motorists can expect 30 minute delays. No work is scheduled Friday through Sunday. Motorist can access US 12 and SR 123 as alternate routes. Last Updated: 8/23/2014 8:16 AM More Info
From milepost 69 to milepost 71
LOW IMPACT
SR 411 Both Directions - SR 411, City of Kelso - West Main Street Realignment (mileposts 1.50 to 1.75) Traffic Impacts: Monday, Aug. 18 to Friday, Aug. 22: No scheduled traffic impacts. NOTE: Access on SR 411 between Washington and Grant is now open to through-traffic. The intersection of SR 411 and Main Street/Allen Street is controlled by a four-way stop. Last Updated: 8/15/2014 11:28 AM More Info
From milepost 2 to milepost 2
LOW IMPACT
SR 411 Both Directions - SR 411, City of Castle Rock - Front Avenue Improvement (mileposts 12.6 to 13.2) Traffic Impacts: No scheduled traffic impacts. Last Updated: 12/20/2013 8:44 AM More Info
From milepost 13 to milepost 14
LOW IMPACT
SR 433 Both Directions - SR 433 at the Lewis and Clark Bridge (milepost 0.0) Traffic Impacts: Monday, Aug. 25 to Friday, Aug. 29: No Scheduled traffic impacts. Last Updated: 8/22/2014 9:08 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 502 Both Directions - SR 502 Widening from I-5 to Battle Ground (MP 0.59 to 6.61) Monday, Aug. 25 to Friday, Aug. 29: Multiple, daytime, intermittent, single-lane closures with flaggers, throughout the 6 mile length of the project limits, from 9 a.m. to 3 p.m. daily. Saturday, Aug. 23: Daytime, intermittent, single-lane closures with flaggers, throughout the 6 mile length of the project limits, from 6 a.m. to 2 p.m. Last Updated: 8/22/2014 10:24 AM More Info
From milepost 1 to milepost 7
LOW IMPACT
SR 504 Both Directions - SR 504, Both directions between Hummocks Trail east to Loowit viewpoint (mileposts 45.0 to 52.0) SR 504 has been closed for the winter season starting Saturday, Nov. 16. Last Updated: 11/22/2013 2:34 PM More Info
From milepost 45 to milepost 52
LOW IMPACT
SR 507 Both Directions - SR 507, Yew Street Intersection Improvements (mileposts 0.22 to 0.32) Traffic Impacts: No scheduled traffic impacts. Last Updated: 8/22/2014 10:41 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 530 Both Directions - Thursday, August 21 to Sunday, August 24 - Traffic will be flagged through in both directions of SR 530 in Oso from 6 a.m. to 6 p.m. daily for road work. Wait times have been about 10 minutes. Last Updated: 8/15/2014 10:24 AM More Info
From milepost 36 to milepost 39
LOW IMPACT
SR 823 Both Directions - SR823 various intersections: Sunday, August 24, 6:30 a.m. to 3:30 p.m., right, left and turn lane closures at various intersections for pavement markings. Last Updated: 8/23/2014 8:24 AM More Info
From milepost 1 to milepost 5
LOWEST IMPACT
SR 6 Both Directions - SR 6, Rock Creek East and West Bridges - Replacement (mileposts 25.95 to 26.94) Traffic Impacts: Monday, Aug. 18 to Saturday, Aug. 23: Daytime, intermittent, single-lane closures with flaggers from 6 a.m. to 4:30 p.m. for excavation work. Last Updated: 8/15/2014 11:34 AM More Info
From milepost 26 to milepost 27
LOWEST IMPACT
SR 20 Both Directions - Chip seal is underway. Drivers should expect delays at work locations with flaggers and pilot cars directing single lane, alternating traffic. Motorists should be alert for loose gravel in some areas. Motorcyclists should use extreme caution. Last Updated: 7/24/2014 10:44 AM More Info
From milepost 421 to milepost 437
LOWEST IMPACT
SR 211 Both Directions - Chip seal is underway. Drivers should expect delays at work locations with flaggers and pilot cars directing single lane, alternating traffic. Motorists should be alert for loose gravel in some areas. Motorcyclists should use extreme caution. Last Updated: 7/24/2014 10:52 AM More Info
From milepost 0 to milepost 16
LOWEST IMPACT
SR 401 Both Directions - SR 401, Both directions, between Megler Ferry Landing and Mile Post Marker 3.00 (mileposts 1.70 to 3.21) Monday, Aug. 25 to Friday, Aug. 29: Daytime, single-lane and shoulder closures for roadside maintenance. Last Updated: 8/22/2014 10:48 AM More Info
From milepost 2 to milepost 4
LOWEST IMPACT
SR 411 Both Directions - SR 411 - Huntington Avenue Sidewalk Improvements (mileposts 12.46 to 12.7) Traffic Impacts: Monday, Aug. 18 to Friday, Aug. 22: No scheduled traffic impacts. Last Updated: 8/15/2014 11:28 AM More Info
From milepost 12 to milepost 13
LOWEST IMPACT
SR 432 Both Directions - SR 432, Both directions, between Oregon Way (milepost 6.10) Saturday, Aug. 23 to Sunday, Aug. 24: Daytime, full-lane closures for roadside maintenance and broken track repairs. Last Updated: 8/22/2014 10:52 AM More Info
At milepost 6