Return to Map

HIGHEST IMPACT
US 2 Both Directions - US 2 remains closed from Coles Corner milepost 84.75 to Leavenworth at milepost 99 due to fire activity, with no estimated time for reopening. SR 207 and the Chumstick Highway are open as a detour for vehicles less than 26,000 lbs. Local delivery trucks over 26,000 lbs. allowed. Last Updated: 7/25/2014 8:06 AM More Info
From milepost 85 to milepost 99
HIGH IMPACT
I-90 Westbound - Monday, July 28 to the morning of Friday, Aug. 1 - The two right lanes of westbound I-90 at the East Channel Bridge will close nightly from 9 p.m. to 5 a.m. so crews can replace two expansion joints under the bicycle/pedestrian path. Last Updated: 7/25/2014 12:28 PM More Info
At milepost 9
HIGH IMPACT
US 101 Northbound - Road work on US 101 northbound at milepost 83.2 near SR 105 beginning at 8:53 am on July 29, 2014 until about 1:00 pm. Last Updated: 7/29/2014 9:03 AM More Info
At milepost 83
HIGH IMPACT
US 101 Both Directions - Road work on US 101 both directions from milepost 322.0 near Jorsted Creek to milepost 316.0 near Beacon Point Dr beginning at 7:20 am on July 29, 2014 until about 4:00 pm. Last Updated: 7/29/2014 7:23 AM More Info
From milepost 322 to milepost 316
HIGH IMPACT
US 101 Eastbound - Road work on US 101 eastbound at milepost 245.5 near Benson Rd beginning at 7:03 am on July 29, 2014 until about 9:00 pm. Last Updated: 7/29/2014 7:06 AM More Info
At milepost 246
HIGH IMPACT
SR 7 Southbound - Road work on SR 7 southbound from milepost 34.0 near 384th St E to milepost 33.0 near Dean Kreger Rd beginning at 6:39 am on July 29, 2014 until about 4:30 pm. Last Updated: 7/29/2014 6:49 AM More Info
From milepost 34 to milepost 33
HIGH IMPACT
SR 7 Southbound - Road work on SR 7 southbound from milepost 57.0 at the SR 7 Extension to milepost 58.2 near S 38th St beginning at 9:01 am on July 28, 2014 until about 5:00 pm on July 30, 2014. Last Updated: 7/29/2014 5:25 AM More Info
From milepost 57 to milepost 59
HIGH IMPACT
SR 106 Westbound - Road work on SR 106 westbound at milepost 15.5 near E Trails Rd beginning at 7:37 am on July 29, 2014 until about 4:30 pm. Last Updated: 7/29/2014 7:40 AM More Info
At milepost 16
HIGH IMPACT
SR 109 Northbound - Road work on SR 109 northbound from milepost 7.0 near Grass Creek to milepost 20.0 near Copalis Beach City Limits beginning at 8:19 am on July 29, 2014 until about 3:00 pm. Last Updated: 7/29/2014 8:23 AM More Info
From milepost 7 to milepost 20
HIGH IMPACT
SR 162 Both Directions - Road work on SR 162 both directions at milepost 6.1 near 128th St E beginning at 7:37 am on July 29, 2014 until about 3:00 pm. Last Updated: 7/29/2014 7:40 AM More Info
At milepost 6
HIGH IMPACT
SR 241 Both Directions - SR 241 milepost 1: Roadway is closed to all traffic until repairs to bridge are completed. State Route 223 to State Route 22 is the alternate route. As well as a signed detour route utilizing local roads. Last Updated: 7/28/2014 8:48 AM More Info
At milepost 1
HIGH IMPACT
SR 520 Westbound - Monday, July 28 to the morning of Thursday, July 31 - The 84th Avenue Northeast on-ramp to westbound SR 520 will close nightly from 11 p.m. to 5 a.m. for concrete pouring work. Last Updated: 7/24/2014 12:52 PM More Info
At milepost 5
HIGH IMPACT
SR 520 Westbound - Monday, July 28 to the morning of Thursday, July 31 - All lanes of westbound SR 520 between 92nd Avenue Northeast and Montlake Boulevard will close nightly from 11 p.m. to 5 a.m. for concrete pouring work. Last Updated: 7/24/2014 12:51 PM More Info
From milepost 5 to milepost 1
MODERATE IMPACT
I-5 Northbound - On I-5 northbound from MP 220 to MP 221 the right lane is closed due to maintenance. Last Updated: 7/29/2014 8:15 AM More Info
From milepost 220 to milepost 221
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15) Traffic Impacts: Monday, July 28 to Friday, Aug. 1: Daytime and nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Nighttime closures and flaggers on Mellen Street, from 7p.m. to 7 a.m. Drivers should follow signed detours between Ellsbury Street South and Marsh Avenue. Last Updated: 7/25/2014 10:47 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - Monday, July 28 to the morning of Friday, Aug. 1 – One lane of the northbound and southbound I-5 Nooksack River bridges will be closed from 7 p.m. to 5 a.m. for preparation and bridge painting. Drivers should be prepared for slightly narrower lanes. The speed limit through the work zone is reduced from 70 to 60 mph. Last Updated: 7/24/2014 3:03 PM More Info
At milepost 263
MODERATE IMPACT
I-5 Both Directions - Tuesday, July 8 to November - Both directions of I-5 near the Stillaguamish River Bridge have been reduced to two lanes until bridge work is complete in November. Drivers should be prepared for some delays throughout the day. The heaviest northbound congestion is expected Thursdays and Fridays 3-6 p.m., and Saturdays and Sundays 11 a.m. to 4 p.m. The heaviest southbound congestion is expected Sundays 4 to 6 p.m. Drivers should plan for up to 35 minutes of extra travel time during these hours. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
MODERATE IMPACT
I-5 Southbound - All southbound I-5 traffic is reduced to two lanes and will use a new crossover across the median to two lanes of northbound I-5 across the Stillaguamish River Bridge, crossing back over on the other side of the bridge, until the project is complete in November. Northbound I-5 is reduced to two lanes from SR 530 to 236th Street Northeast as well. Drivers should prepare for a 55 mile per hour speed limit in both directions in the work zone. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
MODERATE IMPACT
I-90 Both Directions - Snoqualmie Pass rock blasting closures scheduled Tuesday through Thursday at 8 p.m. lasting one hour or more. During blasting I-90 will be closed from milepost 56 near Gold Creek to milepost 61 near Price Creek. During closures there are no services eastbound past milepost 53 and westbound past milepost 70. Last Updated: 7/28/2014 9:03 PM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 47 to 55 eastbound: Right lane closures 24 hours a day. Work hours are primarily Monday through Saturday from 10 p.m. to 9 a.m. A center lane will be closed during the week, this will require traffic to shift to the right or left. Westbound: Single lane closures 24 hours a day Monday through Saturday from 10 pm to 9am. Last Updated: 7/28/2014 1:07 PM More Info
From milepost 47 to milepost 55
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 56 to 61: Drivers should prepare for intermittent rolling slowdowns both directions Monday through Friday, during daytime hours. Nighttime Restrictions: Traffic will be reduced to one lane both directions, Monday through Friday, during nighttime hours. Last Updated: 7/28/2014 8:49 AM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - Resurfacing work will be under way on Interstate 90 from the Lincoln Spokane county Line to the Salnave Road Interchange. Drivers should be alert for lane restrictions, rough pavement, and reduced legal speed limits. Motorcyclists should use caution. Last Updated: 6/26/2014 11:39 AM More Info
From milepost 255 to milepost 265
MODERATE IMPACT
I-405 Southbound - Monday, July 28 to the morning of Wednesday, July 30 - The left lane of southbound I-405 between SR 520 and Southeast 8th Street will close nightly from 8 p.m. to 5 a.m. for paving work. Last Updated: 7/24/2014 12:24 PM More Info
From milepost 15 to milepost 13
MODERATE IMPACT
US 2 Northbound - Monday through Thursday, 6 a.m. to 8 p.m., expect lane shifts and shoulder closures in the four lane section. In the two lane section, some 20 minute delays with flaggers and a pilot car may be necessary. This week, crews will be grinding pavement in preparation for paving. Speed through the work zone will be reduced to 45. When outside lanes and shoulders are closed, bicyclists and pedestrians will be bussed through the work zone. Last Updated: 7/28/2014 11:45 AM More Info
From milepost 64 to milepost 72
MODERATE IMPACT
US 2 Both Directions - Monday through Thursday, from 7 a.m. to 7 p.m., expect the Eastbound lanes west of the Stevens Pass summit to be closed and traffic shifted to the Westbound lanes during the day with all four lanes unrestricted overnight where crews are stabilizing a rock slope above the highway. Last Updated: 7/14/2014 2:47 PM More Info
From milepost 61 to milepost 64
MODERATE IMPACT
US 2 Both Directions - Re surfacing work will be underway from Espanola Road to Interstate 90. This includes US 2 through Airway Heights. Most asphalt paving work will be done during evening and overnight hours. Drivers should be alert for lane restrictions, rough pavement, and possible delays. Motorcyclists should use cuation on rogh pavement. Last Updated: 6/26/2014 11:39 AM More Info
From milepost 271 to milepost 284
MODERATE IMPACT
US 12 Both Directions - US 12 both directions milepost 163-164: Motorists may experience up to 30 minutes delay as crews grind and repair the roadway. Last Updated: 7/28/2014 8:21 AM More Info
From milepost 164 to milepost 163
MODERATE IMPACT
US 97 Both Directions - On US 97 from Tonasket North on Tuesday and Wednesday expect up to 20 minute delays with flaggers where one crew is installing plastic traffic markings, and another is installing transverse joint seals on a bridge. Last Updated: 7/28/2014 12:12 PM More Info
From milepost 314 to milepost 326
MODERATE IMPACT
US 97 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23, SR 14 mileposts 100.5 to 102.0) Traffic Impacts: Monday, July 28 to Thursday, July 31: Daytime, single-lane closures, with flaggers. Last Updated: 7/25/2014 11:09 AM More Info
From milepost 2 to milepost 3
MODERATE IMPACT
SR 9 Northbound - Monday, July 28 to Friday, Aug. 1 – One lane of northbound SR 9 may be closed daily near Front Street from 7 a.m. to 3 p.m. for construction. Flaggers will direct traffic through the work zone. Last Updated: 7/24/2014 3:09 PM More Info
From milepost 97 to milepost 99
MODERATE IMPACT
SR 14 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, July 28 to Friday, Aug. 1: Daytime, intermittent, single-lane closures with flaggers and a pilot car, on SR 14, SR 141 and on the SR 141 Spur. Tuesday, July 29 to Thursday, July 31: Nighttime, single-lane closures with flaggers at the SR 14 and US 97 intersection, from 8 p.m. Tuesday, July 29 to 6 a.m. Thursday, July 31 Last Updated: 7/29/2014 8:41 AM More Info
From milepost 67 to milepost 103
MODERATE IMPACT
SR 14 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23 and SR 14 mileposts 100.5 to 102.0) Traffic Impacts: Monday, July 28 to Thursday, July 31: Daytime, single-lane closures, with flaggers. Last Updated: 7/25/2014 11:08 AM More Info
From milepost 100 to milepost 102
MODERATE IMPACT
SR 17 Northbound - On SR 17 West of Bridgeport at SR 174 to East of Brewster at US 97 on Tuesday ONLY, expect up to 20 minute delays with flaggers where a crew are installing transverse joint seals on the bridge. Last Updated: 7/28/2014 12:08 PM More Info
From milepost 128 to milepost 144
MODERATE IMPACT
SR 141 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, July 28 to Friday, Aug. 1: Daytime, intermittent, single-lane closures with flaggers and a pilot car, on SR 14, SR 141 and on the SR 141 Spur. Tuesday, July 29 to Thursday, July 31: Nighttime, single-lane closures with flaggers at the SR 14 and US 97 intersection, from 8 p.m. Tuesday, July 29 to 6 a.m. Thursday, July 31 Last Updated: 7/29/2014 8:41 AM More Info
From milepost 0 to milepost 30
MODERATE IMPACT
SR 155 Both Directions - On SR 155 from Coulee City at US 2 to Elmer City on Tuesday expect up to 20 minute delays with flaggers where one crew is fog sealing. Another crew is removing and installing guideposts and another is installing transverse joint seals on a bridge. Last Updated: 7/28/2014 12:21 PM More Info
From milepost 0 to milepost 30
MODERATE IMPACT
US 197 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, July 28 to Friday, Aug. 1: Daytime, intermittent, single-lane closures with flaggers and a pilot car, on SR 14, SR 141 and on the SR 141 Spur. Tuesday, July 29 to Thursday, July 31: Nighttime, single-lane closures with flaggers at the SR 14 and US 97 intersection, from 8 p.m. Tuesday, July 29 to 6 a.m. Thursday, July 31 Last Updated: 7/29/2014 8:41 AM More Info
From milepost 1 to milepost 4
MODERATE IMPACT
SR 410 Both Directions - East of Chinook Pass summit: Monday through Thursday, motorists can expect 30 minute delays between 6 a.m. to 4:30 p.m. and from 6 a.m. to noon on Fridays. Crews are performing rock scaling work. Last Updated: 7/28/2014 8:40 AM More Info
From milepost 69 to milepost 71
MODERATE IMPACT
SR 508 Both Directions - SR 508 to SR 7 - Paving and Sealing Road improvements (mileposts 0.20 to 32.84) Traffic Impacts: Monday, July 28 to Friday, Aug. 1: Daytime, single-lane closures with pilot car for paving and sealing along SR 508, from 7 a.m. to 7 p.m. Last Updated: 7/25/2014 11:10 AM More Info
From milepost 0 to milepost 33
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction Traffic Impacts: SR 508 is restricted to vehicles weighing more than seven tons. Trucks and large passenger vehicles should follow posted detour signs: Eastbound drivers, take Leonard Road to US 12. Westbound drivers, take Cinebar Road to Silver Creek Road/SR 122 to US 12. Last Updated: 3/14/2014 10:53 AM More Info
At milepost 14
MODERATE IMPACT
SR 520 Westbound - Monday, July 28 to the morning of Friday, Aug. 1 - The right lane of westbound SR 520 between the east highrise and Montlake Boulevard will close nightly from 9 p.m. to 6 a.m. for concrete pouring work. Last Updated: 7/24/2014 12:53 PM More Info
From milepost 4 to milepost 1
MODERATE IMPACT
SR 520 Westbound - Monday, July 28 to the morning of Wednesday, July 30 - The eastbound SR 202 on-ramp to westbound SR 520 will close nightly from 9 p.m. to 5 a.m. for paving work. Last Updated: 7/24/2014 12:36 PM More Info
At milepost 13
MODERATE IMPACT
SR 520 Westbound - Monday, July 28 to the morning of Wednesday, July 30 -The westbound SR 520 off-ramp to Northeast 51st Street will close nightly from 9 p.m. to 5 a.m. for paving work. Last Updated: 7/24/2014 12:35 PM More Info
At milepost 11
MODERATE IMPACT
SR 520 Westbound - Monday, July 28 to the morning of Wednesday, July 30 - The West Lake Sammamish Parkway on-ramp to westbound SR 520 will close nightly from 10 p.m. to 5 a.m. for paving work. Last Updated: 7/24/2014 12:34 PM More Info
At milepost 12
MODERATE IMPACT
SR 520 Westbound - Monday, July 28 to the morning of Wednesday, July 30 - Two right lanes of westbound SR 520 between West Lake Sammamish Parkway and Northeast 51st Street will close nightly from 8 p.m. to 5 a.m. for paving work. Last Updated: 7/24/2014 12:29 PM More Info
From milepost 12 to milepost 11
MODERATE IMPACT
SR 534 Both Directions - On SR 534 eastbound & westbound from I-5 (MP 0) to SR 9 (MP 5) there is a slow-moving maintenance operation affecting all lanes. Last Updated: 7/29/2014 9:29 AM More Info
From milepost 0 to milepost 6
MODERATE IMPACT
SR 539 Northbound - Monday, July 28 to Friday, Aug. 1 – One lane of SR 539 will be closed near the border daily from 7 a.m. to 5 p.m. for clearing and drainage work. Flaggers will direct traffic through the work zone. Last Updated: 7/24/2014 3:13 PM More Info
From milepost 15 to milepost 16
MODERATE IMPACT
SR 539 Both Directions - Monday, July 28 to Friday, Aug. 1 – Drivers should expect lane and shoulder closures on SR 539 between Horton Road and SR 546/East Badger Road from 7 a.m. and 3 p.m. for construction. Flaggers will direct traffic through the work zone. Last Updated: 7/24/2014 3:11 PM More Info
From milepost 2 to milepost 13
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93) Traffic Impacts: Monday, July 28 to Thursday, July 31: Daytime, left and right shoulder closures, on both directions of I-5, from Northeast 39th Street to 99th Street. Thursday, July 31: Nighttime, ramp closures, southbound Main Street on-ramp to the southbound Northeast 39th Street off-ramp, and northbound Northeast 39th Street on-ramp to Main Street off-ramp. Last Updated: 7/25/2014 11:15 AM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Traffic Impacts: Monday, July 28 to Friday, Aug. 1: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. NOTE: There will be intermittent shoulder closures on both directions of I-5 between mileposts 11.47 and 13.82 from Friday, July 11 to Friday, August 15. Last Updated: 7/25/2014 10:55 AM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08) Traffic Impacts: Monday, July 28 to Saturday, Aug. 2: Daytime and nighttime, single-lane closures on both directions of I-5. NOTE: The posted speed limit will be reduced to 60 mph, both directions, throughout the construction zone. Workers will be present and working beyond the shoulder during daylight hours, 7 days a week. Last Updated: 7/25/2014 10:49 AM More Info
From milepost 20 to milepost 21
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, mileposts 36.07 to 36.83 and I-5 mileposts 6.95 to 9.51) Monday, July 28 to Friday, Aug. 1: Daytime, alternating, single-lane closures, northbound on I-205. Sunday, July 27 to Thursday, July 31: Nighttime, alternating single-lane closures on both directions of I-205 and I-5. Monday, July 28, off-ramp closure, southbound on I-205 to the NE 134th Street on-ramp. Last Updated: 7/25/2014 10:38 AM More Info
From milepost 7 to milepost 10
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46) Traffic Impacts: No scheduled traffic impacts. Last Updated: 7/3/2014 9:12 AM More Info
From milepost 10 to milepost 20
LOW IMPACT
I-82 Westbound - Interstate 82 westbound milepost 132 Umatilla Bridge: Wednesday, July 30, from 8:30 a.m. to 3 p.m. motorists will experience a lane closure while crews install lights on the Umatilla Bridge. Last Updated: 7/29/2014 8:32 AM More Info
At milepost 132
LOW IMPACT
I-90 Westbound - I-90 westbound at milepost 54: The right lane is closed for a mobile operation installing pavement markers. Last Updated: 7/29/2014 9:18 AM More Info
At milepost 54
LOW IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 61 to 65 Nightly single lane closures can be expected both directions Monday through Friday, from 10 p.m. until 9 a.m. There will be intermittent short term ramp closures at the Cabin Creek and Stampede Pass Interchanges at night from 10 p.m. until 9 a.m. August 4 and 5 the eastbound off and on ramps at Stampede Pass Interchange will be closed from 10 p.m. until 9 a.m. Last Updated: 7/28/2014 8:48 AM More Info
From milepost 61 to milepost 65
LOW IMPACT
I-90 Both Directions - Drivers should expect lane restrictions from 7 p.m. in the evening until 6 a.m. the following morning. Possible slow traffic during those hours. Work will be underway 6 days per week. Drivers should be alert for grooved pavement all hours. The legal speed limit on grooved pavement is 60 mph. Drivers should watch for reduced legal speed signs. Motorcyclists should use extreme caution on grooved pavement. Last Updated: 7/21/2014 8:10 AM More Info
From milepost 294 to milepost 300
LOW IMPACT
I-205 Both Directions - Salmon Creek Interchange Project (I-205, mileposts 36.07 to 36.83 and I-5 mileposts 6.95 to 9.51) Monday, July 28 to Friday, Aug. 1: Daytime, alternating, single-lane closures, northbound on I-205. Sunday, July 27 to Thursday, July 31: Nighttime, alternating single-lane closures on both directions of I-205 and I-5. Monday, July 28, off-ramp closure, southbound on I-205 to the NE 134th Street on-ramp. Last Updated: 7/25/2014 10:38 AM More Info
From milepost 36 to milepost 38
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – Up to three lanes of southbound I-405 between Northeast 85th Street and Northeast 70th Street will close starting at 7 p.m. nightly for pavement grinding and lane restriping work. Two lanes will close at 8 p.m., and three lanes will close at 10:30 p.m. One lane will open by 4:30 a.m. and all lanes by 5 a.m. each day. Last Updated: 7/28/2014 11:22 AM More Info
From milepost 18 to milepost 18
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Wednesday, July 30 – One lane of southbound I-405 between I-5 in Lynnwood and SR 527 will close from 7 p.m. to 5 a.m. nightly for lane striping work (Weather and temperature dependent). Last Updated: 7/25/2014 10:44 AM More Info
From milepost 30 to milepost 27
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Wednesday, July 30 – One lane of northbound I-405 between SR 527 and I-5 in Lynnwood will close from 7 p.m. to 5 a.m. nightly for lane striping work (Weather and temperature dependent). Last Updated: 7/25/2014 10:43 AM More Info
From milepost 27 to milepost 31
LOW IMPACT
I-405 Northbound - Thursday, July 31 to the morning of Friday, August 1 – The northbound I-405 off-ramp to Northeast 85th Street will close from 10 p.m. to 6 a.m. for guardrail installation work. Last Updated: 7/25/2014 10:42 AM More Info
From milepost 14 to milepost 15
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast 128th Street on-ramp to northbound I-405 will close from midnight to 6 a.m. nightly for barrier and electrical work. Last Updated: 7/25/2014 10:37 AM More Info
At milepost 21
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The northbound I-405 off-ramp to Northeast 128th Street will close from midnight to 6 a.m. nightly for utility work. Last Updated: 7/25/2014 10:37 AM More Info
At milepost 21
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The northbound I-405 off-ramp to Northeast 124th Street/Totem Lake Boulevard will close from 10 p.m. to 6 a.m. nightly for roadway excavation and paving work. Last Updated: 7/25/2014 10:36 AM More Info
At milepost 20
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast 85th Street on-ramp to southbound I-405 will close from 10 p.m. to 6 a.m. nightly for roadway excavation and paving work. Last Updated: 7/25/2014 10:36 AM More Info
At milepost 18
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast 70th Street on-ramp to southbound I-405 will close from 8 p.m. to 6 a.m. nightly for roadway excavation and paving work. Last Updated: 7/25/2014 10:32 AM More Info
At milepost 17
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The southbound I-405 off-ramp to Northeast 70th Street will close from 9 p.m. to 6 a.m. nightly for electrical, paving, roadway excavation and lane restriping work. Last Updated: 7/25/2014 10:32 AM More Info
At milepost 17
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast 70th Street on-ramp to northbound I-405 will close from 9 p.m. to 6 a.m. nightly for survey and sawcutting work. Last Updated: 7/25/2014 10:31 AM More Info
At milepost 17
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The northbound I-405 off-ramp to Northeast 70th Street will close from 9 p.m. to 6 a.m. nightly for survey and sawcutting work. Last Updated: 7/25/2014 10:31 AM More Info
At milepost 17
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The SR 527 ramp to southbound I-405 will close from 10 p.m. to 5 a.m. nightly for electrical and striping work (Weather and temperature dependent). Last Updated: 7/25/2014 10:20 AM More Info
At milepost 27
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The southbound I-405 off-ramp to Northeast 160th Street will close from 11 p.m. to 5 a.m. nightly for sign structure work. Last Updated: 7/25/2014 10:20 AM More Info
At milepost 23
LOW IMPACT
I-405 Southbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast 160th Street on-ramp to southbound I-405 will close from 8 p.m. to 5 a.m. nightly for electrical work. Last Updated: 7/25/2014 10:19 AM More Info
At milepost 23
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The eastbound and westbound SR 520 ramps to northbound I-405 will close from 10 p.m. to 4 a.m. nightly for electrical work. Last Updated: 7/25/2014 10:19 AM More Info
At milepost 15
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The northbound I-405 ramp to westbound SR 520 will close from 11 p.m. to 4 a.m. nightly for bridge work. Last Updated: 7/25/2014 10:18 AM More Info
At milepost 15
LOW IMPACT
I-405 Northbound - Monday, July 28 to the morning of Friday, August 1 – The Northeast Eighth Street on-ramp to northbound I-405 will close from 11 p.m. to 5 a.m. nightly for paving work. Last Updated: 7/25/2014 10:18 AM More Info
At milepost 14
LOW IMPACT
US 2 Both Directions - Paving is underway evenings and overnight hours, from about 7 p.m. until as late as 6 a.m. the following morning. Drivers should be alert for single-lane traffic directed by flaggers and pilot cars with delays up to 20 minutes. Drivers should be very alert for grooved pavement and abrupt lane edges. Motorcyclists need to use extreme caution on grooved surfaces and abrupt lane edges. Last Updated: 7/3/2014 10:30 AM More Info
From milepost 306 to milepost 316
LOW IMPACT
US 101 Both Directions - US 101 traffic will shift to a new alignment for 1.5 miles east of Port Angeles while crews work on an old highway segment. Two lanes will remain open to traffic. Speed limits through the area are reduced to 45 miles per hour. Last Updated: 7/22/2014 2:36 PM More Info
From milepost 257 to milepost 259
LOW IMPACT
US 101 Both Directions - US 101 - Middle Nemah River Bridge Replacement (mileposts 33.04 to 33.99) Traffic Impacts: No scheduled traffic impacts. Last Updated: 5/16/2014 9:06 AM More Info
From milepost 33 to milepost 34
LOW IMPACT
US 101 Both Directions - US 101, Astoria Megler Bridge Painting Project (milepost 0.00 to 0.72) – ODOT A 35 mph speed limit through the construction zone will be maintained for the duration of the project. Expect single-lane traffic and 20-minute delays anytime on weekdays and weekends. Last Updated: 1/19/2012 11:49 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 4 Both Directions - SR 4, Ocean Beach Highway Sanitary Sewer Replacement (mileposts 60.3 to 60.8) Sunday, July 27 to Wednesday, July 30: Daytime, and nighttime, single-lane closures, westbound on Ocean Beach Highway, between 8th Avenue and 15th Avenue, from 8 p.m. Sunday, July 27 to 10 a.m. Wednesday, July 30. Wednesday, July 30 to Friday, Aug. 1: Daytime and nighttime, single-lane closures on the westbound lanes between Ocean Beach Highway and 9th Avenue, from 8 p.m. Wednesday, July 30 to 10 a.m. Friday, Aug. 1 Last Updated: 7/29/2014 8:43 AM More Info
From milepost 60 to milepost 61
LOW IMPACT
SR 4 Both Directions - SR 4, Elochoman River Vic. Culvert Replacement (mileposts 33.89 to 34.14) Traffic Impacts: Monday, July 28 to Friday, Aug. 1: Daytime, single-lane and shoulder closures. Last Updated: 7/25/2014 11:13 AM More Info
From milepost 34 to milepost 35
LOW IMPACT
SR 6 Both Directions - SR 6, Willapa River Bridge - Bridge Replacement (mileposts 6.86 to 7.26) Traffic Impacts: Monday, July 28 to Thursday, July 31: No scheduled traffic impacts. Thursday, July 3: Starting Thursday, July 3, the speed limit on SR 6 will return to 55 mph. Last Updated: 7/25/2014 10:44 AM More Info
From milepost 7 to milepost 8
LOW IMPACT
SR 9 Both Directions - Monday, July 28 and Tuesday, July 29 - A single lane of SR 9 from 132nd Street Northeast to Highland Drive will be closed daily from 8 a.m. to 3 p.m. for chip seal and sweeping work. A pilot car will help guide traffic through the closure. Last Updated: 7/23/2014 11:35 AM More Info
From milepost 24 to milepost 29
LOW IMPACT
SR 14 Both Directions - SR 14 at Bridge of the Gods (milepost 41.6) Drivers crossing the Bridge of the Gods should expect intermittent delays of up to 20 minutes. Last Updated: 4/4/2014 1:34 PM More Info
At milepost 42
LOW IMPACT
SR 105 Both Directions - SR 105, Smith Creek and North River - Bridge Replacements (mileposts 6.25 to 13.65) Traffic Impacts: Sunday, July 27 to Saturday, Aug. 2: Daytime, intermittent, single-lane closures with flagger. The speed limit is 55 mph in the project area. Last Updated: 7/25/2014 10:41 AM More Info
From milepost 6 to milepost 14
LOW IMPACT
SR 203 Both Directions - Monday, July 28 to Friday, August 1 - A single lane of SR 203 from Monroe to Carnation will be closed from 8:30 a.m. to 3 p.m. daily for a variety of roadwork. Traffic will be flagged through the work zone. Last Updated: 7/24/2014 8:06 AM More Info
From milepost 5 to milepost 24
LOW IMPACT
SR 215 Both Directions - expect lane shifts, shoulder closures and pedestrian detours as crews continue to upgrade sidewalks and repair drainage issues. At the intersection of US 97 and SR 215, expect shoulder closures for trench excavation and installation of illumination system conduits. The traffic islands and sidewalk ramps will be reconstructed to meet ADA standards. Expect lane shifts, flaggers and closures at night for pavement grinding. Last Updated: 7/21/2014 3:40 PM More Info
From milepost 0 to milepost 7
LOW IMPACT
SR 410 Both Directions - SR 410 milepost 26 to 57.5: Monday through Wednesday and Friday, motorists can expect one lane flagger controlled traffic with delays of 15 minutes during daylight hours, and until 4 p.m. on Fridays. Note: There will be no project activity on Thursday, July 31 allowing for unrestricted access for the Ramrod Bicycle event. Last Updated: 7/28/2014 9:27 AM More Info
From milepost 26 to milepost 58
LOW IMPACT
SR 411 Both Directions - SR 411, City of Kelso - West Main Street Realignment (mileposts 1.50 to 1.75) Traffic Impacts: Monday, July 28 to Friday, Aug. 1: Nighttime, single-lane closures with flaggers from 8 p.m. to 6 a.m. for stripping. NOTE: Access on SR 411 between Washington and Grant is now open to through-traffic. The intersection of SR 411 and Main Street/Allen Street is controlled by a four-way stop. Last Updated: 7/25/2014 10:57 AM More Info
From milepost 2 to milepost 2
LOW IMPACT
SR 411 Both Directions - SR 411, City of Castle Rock - Front Avenue Improvement (mileposts 12.6 to 13.2) Traffic Impacts: No scheduled traffic impacts. Last Updated: 12/20/2013 8:44 AM More Info
From milepost 13 to milepost 14
LOW IMPACT
SR 433 Both Directions - SR 433 at the Lewis and Clark Bridge (milepost 0.0) Traffic Impacts: Monday, July 28 to Friday, Aug. 1: Daytime, lane shifts on both directions of SR 433, and right shoulder closures, with traffic control for utilities work. There will be wide-load restrictions in place. Last Updated: 7/25/2014 10:30 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 502 Both Directions - SR 502 Widening from I-5 to Battle Ground(MP 0.59 to 6.61) Monday, July 28 to Friday, Aug. 1: Multiple, daytime, and nighttime, intermittent, single-lane closures with flaggers, throughout the 6 mile length of the project limits, from 9 a.m. to 3 p.m. daily & 6:30 p.m. to 6 a.m., nightly. Friday, July 25 to Thursday, July 31: Multiple, nighttime, intermittent single-lane closures with flaggers, on NE 29th Avenue through NE 219th Street. from 6:30 p.m. Friday, July 25 to 6 a.m. Thursday, July 31. Last Updated: 7/28/2014 9:08 AM More Info
From milepost 1 to milepost 7
LOW IMPACT
SR 504 Both Directions - SR 504, Both directions between Hummocks Trail east to Loowit viewpoint (mileposts 45.0 to 52.0) SR 504 has been closed for the winter season starting Saturday, Nov. 16. Last Updated: 11/22/2013 2:34 PM More Info
From milepost 45 to milepost 52
LOW IMPACT
SR 507 Both Directions - SR 507, Yew Street Intersection Improvements (mileposts 0.22 to 0.32) Traffic Impacts: Thursday, July 31 to Friday, Aug. 1: Daytime shoulder closures on SR 507 and Yew Street. Last Updated: 7/25/2014 11:12 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 522 Both Directions - Monday, July 28 to the morning of Friday, August 1 - A single lane of SR 522 from Fales/Echo Lake Road to US 2 will be closed from 10 p.m. to 5 a.m. nightly for paving work. Last Updated: 7/25/2014 10:22 AM More Info
From milepost 20 to milepost 25
LOW IMPACT
SR 522 Both Directions - Monday, July 28 to the morning of Friday, August 1 - A single lane of 164th Street at the SR 522 interchange will be closed from 8 p.m. to 5 a.m. nightly for utility and drainage work. Last Updated: 7/25/2014 10:20 AM More Info
At milepost 23
LOW IMPACT
SR 530 Both Directions - Monday, July 28 to Saturday, August 2 - Traffic will be flagged through in both directions of SR 530 in Oso from 6 a.m. to 6 p.m. daily to allow trucks to load and unload material. Wait times have typically been about 5 minutes. Last Updated: 7/24/2014 7:54 AM More Info
From milepost 36 to milepost 39
LOWEST IMPACT
I-90 Both Directions - I-90 Easton Hill paving MP 65 to 67: Work will resume in the summer of 2014. Last Updated: 7/28/2014 8:51 AM More Info
From milepost 65 to milepost 67
LOWEST IMPACT
I-90 Both Directions - Bicycle Alternate Route: I-90 is closed to bicycles in both directions between Hyak (Exit 54) and Stampede Pass interchange (exit 62) because there is no shoulder for bicycles to use. Bicyclists can use the John Wayne Pioneer Trail, weather permitting, as an alternate route. Last Updated: 7/28/2014 8:51 AM More Info
From milepost 54 to milepost 62
LOWEST IMPACT
US 2 Both Directions - Chip seal is underway. Drivers should expect delays at work locations with flaggers and pilot cars directing single lane, alternating traffic. Motorists should be alert for loose gravel in some areas. Motorcyclists should use extreme caution. Last Updated: 7/21/2014 8:08 AM More Info
From milepost 230 to milepost 251
LOWEST IMPACT
US 12 Both Directions - US 12 milepost 166 to milepost 151, Monday through Thursday during daylight hours, WSDOT crews will be grinding areas of pavement. Expect alternating one lane flagger controlled traffic. Drivers can expect possible 30 minute delays. Last Updated: 7/28/2014 8:34 AM More Info
From milepost 166 to milepost 151
LOWEST IMPACT
US 12 Both Directions - US 12 milepost 319 to milepost 320: Monday through Thursday from 5 a.m. to 3 p.m. expect one lane flagger controlled traffic for maintenance operations. Last Updated: 7/28/2014 8:33 AM More Info
From milepost 319 to milepost 320
LOWEST IMPACT
US 12 Both Directions - US 12 milepost 199 to milepost 198.4 both directions: Monday through Wednesday 8:30 a.m. to 3:30 p.m. traffic will be reduced to one lane for bridge maintenance. Work will only be performed at one location at a time. Traffic control will consist of signs, cones, barrels and VMS messaging to direct traffic flow. Last Updated: 7/28/2014 8:32 AM More Info
From milepost 199 to milepost 199
LOWEST IMPACT
US 12 Both Directions - US 12 milepost 133 to 134, milepost 153 to 154, and milepost 165 to 166: Monday through Friday, during daylight hours, traffic will be reduced to one lane for bridge maintenance. Work will only be performed at one location at a time. Last Updated: 7/28/2014 8:22 AM More Info
From milepost 133 to milepost 166
LOWEST IMPACT
SR 4 Both Directions - SR 4, Both directions, between River View East and County Line Park (mileposts 38.0 to 45.5) Monday, July 28 to Friday, Aug. 1: Daytime, single-lane and shoulder closures for roadside maintenance and tree trimming around power lines. Last Updated: 7/25/2014 11:19 AM More Info
From milepost 38 to milepost 46
LOWEST IMPACT
SR 6 Both Directions - SR 6, Rock Creek East and West Bridges - Replacement (mileposts 25.95 to 26.94) Traffic Impacts: Monday, July 28 to Friday, Aug, 1: Around-the-clock, single-lane closures with flaggers for earthwork on HWY 6 and McCormick Road. NOTE: The posted speed limit is 25mph through the construction zone. Last Updated: 7/25/2014 10:50 AM More Info
From milepost 26 to milepost 27
LOWEST IMPACT
SR 20 Both Directions - Chip seal is underway. Drivers should expect delays at work locations with flaggers and pilot cars directing single lane, alternating traffic. Motorists should be alert for loose gravel in some areas. Motorcyclists should use extreme caution. Last Updated: 7/24/2014 10:44 AM More Info
From milepost 421 to milepost 437
LOWEST IMPACT
SR 25 Both Directions - Fog seal is underway. Drivers should expect delays at work locations with flaggers and pilot cars directing single lane, alternating traffic. Motorcyclists should use extreme caution. Last Updated: 7/24/2014 10:51 AM More Info
From milepost 0 to milepost 39
LOWEST IMPACT
SR 142 Both Directions - SR 142, Both directions, between Fisher Hill Road and Horseshoe Bend Road (mileposts 3.0 to 15.0) Monday, July 28 to Thursday, July 31: Daytime, single-lane and shoulder closures with flagger for roadside and ditch maintenance. Last Updated: 7/25/2014 11:17 AM More Info
From milepost 3 to milepost 15
LOWEST IMPACT
SR 211 Both Directions - Chip seal is underway. Drivers should expect delays at work locations with flaggers and pilot cars directing single lane, alternating traffic. Motorists should be alert for loose gravel in some areas. Motorcyclists should use extreme caution. Last Updated: 7/24/2014 10:52 AM More Info
From milepost 0 to milepost 16
LOWEST IMPACT
SR 401 Both Directions - SR 401, Both directions, between Megler Ferry Landing and Mile Post Marker 3.00 (mileposts 1.70 to 3.21) Monday, July 28 to Friday, Aug. 1: Daytime, single-lane and shoulder closures for roadside maintenance. Last Updated: 7/25/2014 11:18 AM More Info
From milepost 2 to milepost 4
LOWEST IMPACT
SR 411 Both Directions - SR 411, both directions, between Waters Road and Delameter Road (mileposts 9.35 to 11.39) Monday, July 28 to Friday, Aug. 1: Daytime, single-lane and shoulder closures for roadside maintenance. Last Updated: 7/25/2014 11:16 AM More Info
From milepost 9 to milepost 12
LOWEST IMPACT
SR 411 Both Directions - SR 411 - Huntington Avenue Sidewalk Improvements (mileposts 12.46 to 12.7) Traffic Impacts: Monday, July 28 to Friday, Aug. 1: No scheduled traffic impacts. Last Updated: 7/25/2014 10:57 AM More Info
From milepost 12 to milepost 13