Return to Map

HIGH IMPACT
I-5 Northbound - Friday, April 29, to the morning of Monday, May 2 – Northbound I-5 before SR 528 will be reduced to two narrower lanes from 9:30 p.m. Friday to 5 a.m. Monday for expansion joint replacement work. Traffic may be reduced to one lane overnight Friday and overnight Sunday. This work is weather dependent. Last Updated: 4/27/2016 4:31 PM More Info
From milepost 198 to milepost 199
HIGH IMPACT
SR 7 Northbound - Northbound SR 7 on-ramp to southbound I-5 is closed for construction through winter 2017. Last Updated: 3/24/2016 9:27 AM More Info
From milepost 58 to milepost 59
HIGH IMPACT
SR 99 Both Directions - Until further notice - Both directions of the Alaskan Way Viaduct/SR 99 between the West Seattle Bridge and the south end of the Battery Street Tunnel closed on Friday, April 29, for approximately two weeks for tunneling work. Last Updated: 4/29/2016 7:01 PM More Info
From milepost 29 to milepost 33
MODERATE IMPACT
I-5 Southbound - Saturday, April 30, to Sunday, May 1 – Up to four right lanes of southbound I-5 from SR 516 to SR 18 may be closed for construction work beginning with one right lane at 8 p.m. All lanes will reopen by noon. Last Updated: 4/29/2016 3:54 PM More Info
From milepost 149 to milepost 143
MODERATE IMPACT
I-5 Southbound - Sunday, May 1, to Friday, May 6 – Up to four left lanes of southbound I-5 from South 200th Street to SR 516 will be closed nightly for construction work beginning with one left lane at 8 p.m. All lanes will reopen by noon. Last Updated: 4/29/2016 3:54 PM More Info
From milepost 151 to milepost 150
MODERATE IMPACT
I-5 Both Directions - Until further notice - The I-5 express lanes will remain open northbound until 11:59 p.m. nightly due to the Alaskan Way Viaduct/SR 99 closure. The lanes will open southbound on schedule at 5 a.m. weekdays and 8 a.m. on the weekend. Last Updated: 4/28/2016 9:32 PM More Info
From milepost 165 to milepost 173
MODERATE IMPACT
I-5 Northbound - Friday, April 29, to the morning of Monday, May 2 – The northbound I-5 off-ramp to SR 528 will be closed from 9:30 p.m. Friday to 5 a.m. Monday for expansion joint replacement work. Last Updated: 4/27/2016 4:33 PM More Info
At milepost 199
MODERATE IMPACT
I-5 Northbound - Friday, April 29, to the morning of Monday, May 2 – The SR 529 on-ramp to northbound I-5 will be closed from 9:30 p.m. Friday to 5 a.m. Monday for expansion joint replacement work. Last Updated: 4/27/2016 4:32 PM More Info
At milepost 198
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 56 to 61: Daytime: Monday through Friday noon, drivers should prepare for intermittent rolling slowdowns and possible added travel time in both directions. Nighttime: Monday night May 2 through Saturday morning May 7, eastbound traffic will be reduced to one lane each night. Motorists may experience added travel time and delays. I-90 is closed to bicycles in both directions between the Hyak interchange (Exit 54) and Stampede Pass interchange (exit 62). Last Updated: 5/1/2016 8:45 PM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 62 to 69 Snoqualmie Pass Wildlife Bridge: Motorists will encounter night time lane closures Monday thru Thursday in both directions of travel. Minor delays should be anticipated.
Scheduled rock blasting-related closure:
Tuesday, May 3 through Thursday, May 5. Starting a 7 p.m., traffic will be stopped eastbound at milepost 56 near Gold Creek and westbound at milepost 63 near Cabin Creek for rock blasting. Last Updated: 5/1/2016 8:45 PM More Info
From milepost 62 to milepost 69
MODERATE IMPACT
I-90 Westbound - I-90 Oakes Ave Interchange to Peoh Rd. mileposts 84 to 87: Westbound traffic will be reduced to one lane 24 hours per day, weekdays. Both lanes will be open on the weekends. Westbound Oaks Ave. Exit 84 will be closed Monday through Friday. In mid May to mid June, Oaks Ave will be closed 24 hours per day. Drivers can access Cle Elum via the Peoh Road Bridge interchange at exit 85. Westbound on ramp at MP 85 will be closed during the same time frame. Last Updated: 5/1/2016 8:44 PM More Info
From milepost 84 to milepost 87
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass rock blasting: Tuesday, May 3 through Thursday, May 5 starting at 7 p.m. During blasting closures eastbound traffic will stopped at Gold Creek milepost 56, and westbound traffic will be stopped at milepost 63 Cabin Creek. No services are available past exit 53 eastbound and exit 70 westbound during blasting closures. Anticipate one hour or more of added travel time. Last Updated: 5/1/2016 8:42 PM More Info
From milepost 56 to milepost 63
MODERATE IMPACT
I-90 Eastbound - Sunday, May 1, to the morning of Monday, May 2 – The eastbound I-90 off-ramp to Rainier Avenue South will be closed from 9 p.m. to 5 a.m. for construction work. Last Updated: 4/28/2016 10:34 PM More Info
At milepost 3
MODERATE IMPACT
I-90 Eastbound - Sunday, May 1, to the morning of Friday, May 6 – Two right lanes of eastbound I-90 from I-5 to Rainier Avenue South will be closed from 9 p.m. to 5 a.m. nightly for construction work. Last Updated: 4/28/2016 10:33 PM More Info
From milepost 0 to milepost 3
MODERATE IMPACT
I-90 Eastbound - Sunday, May 1, to the morning of Friday, May 6 – Two right lanes of eastbound I-90 in the Mount Baker Tunnel will be closed from 9 p.m. to 5 a.m. nightly for construction work. Last Updated: 4/28/2016 10:33 PM More Info
From milepost 4 to milepost 5
MODERATE IMPACT
I-90 Both Directions - Sunday, May 1 – The I-90 express lanes will close at 6 a.m. then open westbound from 7 a.m. to 2:30 p.m. for a Seattle Mariners baseball game. The lanes will open eastbound by 3:30 p.m. Last Updated: 4/28/2016 10:29 PM More Info
From milepost 2 to milepost 10
MODERATE IMPACT
I-90 Both Directions - Saturday, April 30 – The I-90 express lanes will close at 6 a.m. then open westbound from 7 a.m. to 6:30 p.m. for a Seattle Mariners baseball game and a Seattle Sounders FC soccer match. The lanes will open eastbound by 7:30 p.m. Last Updated: 4/28/2016 10:23 PM More Info
From milepost 2 to milepost 10
MODERATE IMPACT
I-90 Both Directions - Thursday, April 28 – The I-90 express lanes will close at 10 p.m. for construction work. The lanes will open westbound by 6 a.m. Last Updated: 4/28/2016 10:23 PM More Info
From milepost 2 to milepost 10
MODERATE IMPACT
US 2 Both Directions - Motorists may encounter flagger controlled traffic and possible delays on US 2 at milepost 131, in the Baker Flats area north of East Wenatchee, due to roundabout construction. The hours of operation on this project are Monday through Thursday from 7:00 am to 7:00 pm and then Friday from 7:00 am to noon. Last Updated: 4/18/2016 11:03 AM More Info
At milepost 131
MODERATE IMPACT
SR 4 Both Directions - Drivers should expect intermittent single-lane closures on both directions of SR 4 between Elochoman Valley Road and Risk Road daily, 6 a.m. to 6 p.m. for landscaping and striping work. Last Updated: 2/5/2016 1:11 PM More Info
From milepost 34 to milepost 35
MODERATE IMPACT
SR 14 Both Directions - Sunday, May 1 to Sunday, May 8: Around-the-clock, single-lane closures on both directions of SR 14, between milepost 58.84 to 58.94, for rock scaling work. NOTE: Tunnel 3 will have height and length restrictions in place for the duration of the project.
NOTE: Drivers should expect delays of up to 20 minutes.
NOTE: The speed limit on SR 14 has been reduced to 25 mph, through this section of highway, for the duration of the project. Last Updated: 4/29/2016 1:19 PM More Info
At milepost 59
MODERATE IMPACT
SR 20 Both Directions - Sunday, May 1, Thursday, May 5 – A single lane of SR 20 between Morris Road and Jacobs Road will be closed from 8 p.m. to 5 a.m. nightly and 9 a.m. to 3 p.m. daily for Frontier utilities work. Flaggers will alternate traffic through the open lane. Last Updated: 4/27/2016 4:51 PM More Info
From milepost 19 to milepost 21
MODERATE IMPACT
SR 99 Both Directions - The SR 99 Alaskan Way Viaduct is closed due to construction for approximately 2 weeks from W Seattle Bridge to Battery Street Tunnel. Last Updated: 4/30/2016 3:01 PM More Info
From milepost 22 to milepost 26
MODERATE IMPACT
SR 167 Southbound - Sunday, May 1, to the morning of Monday, May 2 – The eastbound 15th Street Southwest on-ramp to southbound SR 167 may be closed from 9 p.m. to 5 a.m. for ramp realignment and pavement work. A signed detour will be in place. Last Updated: 4/27/2016 4:16 PM More Info
At milepost 15
MODERATE IMPACT
SR 167 Southbound - Friday, April 29, to the morning of Monday, May 2 – The westbound 15th Street Southwest on-ramp to southbound SR 167 will be closed from 10 p.m. Friday to 5 a.m. Monday for ramp realignment and pavement work. A signed detour will be in place. Last Updated: 4/27/2016 4:16 PM More Info
At milepost 15
MODERATE IMPACT
SR 167 Southbound - Sunday, May 1, to the morning of Monday, May 2 – The right lane of southbound SR 167 from SR 18 to 15th Street Southwest will be closed from 10 p.m. to 5 a.m. for construction work. Rolling slowdowns may be in place. Last Updated: 4/21/2016 10:23 AM More Info
From milepost 14 to milepost 15
MODERATE IMPACT
SR 433 Northbound - Saturday, April 30 to the morning of Sunday, May 1: Drivers on both directions of SR 433/Lewis and Clark Bridge, may be alternated through a single-lane, with flaggers, from 11 p.m. to 8 a.m., for wire installation along the length of the bridge. Last Updated: 4/29/2016 1:22 PM More Info
At milepost 0
MODERATE IMPACT
SR 433 Both Directions - Friday, April 29 to the morning of Saturday, April 30: Drivers on both directions of SR 433/Lewis and Clark Bridge, may be alternated through a single-lane, with flaggers, from 10 p.m. to 4 a.m., for wire installation along the length of the bridge. Last Updated: 4/29/2016 1:20 PM More Info
At milepost 0
MODERATE IMPACT
SR 501 Both Directions - Monday, May 2 to Sunday, May 8: Drivers on both directions of SR 501 between North Smythe Road and North Reiman Road will be alternated through a single-lane of traffic around-the-clock for hillside stabilization and roadway repair work. Use caution and expect delays.
NOTE: The speed limit in this area has been temporarily reduced from 40 mph to 25 mph through the work zone. Last Updated: 4/29/2016 1:24 PM More Info
From milepost 18 to milepost 19
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction
Traffic Impacts:
NOTE: The bridge is now open to traffic. Drivers should expect around-the-clock, alternating, single-lane traffic across the bridge. Drivers should follow signed traffic revisions and wait until the bridge is clear before proceeding across. Last Updated: 1/29/2016 11:47 AM More Info
At milepost 14
LOW IMPACT
I-5 Northbound - Sunday, May 1 to the morning of Wednesday, May 4: The Harrison Avenue off-ramp from northbound I-5 will close from 10 p.m. to 5 a.m. nightly for grinding and paving. The work is weather dependent. Last Updated: 4/29/2016 1:47 PM More Info
At milepost 83
LOW IMPACT
I-90 Eastbound - I-90 milepost 63 Eastbound:
No impacts to traffic other than shoulder closures. No delays are anticipated.
Restrictions:
For freight-related restrictions please see the Commercial Vehicle Services Road Restrictions webpage:
http://www.wsdot.wa.gov/commercialVehicle/Restrictions/roadlist.aspx Last Updated: 5/1/2016 8:42 PM More Info
At milepost 63
LOW IMPACT
US 12 Both Directions - US 12 White Pass: The temporary washout repairs were completed Feb. 1. A traffic signal will continue to direct traffic through a single lane near these repair areas. Work to reconstruct the roadway in the three washout locations will resume in early May. Last Updated: 5/1/2016 8:44 PM More Info
From milepost 138 to milepost 156
LOW IMPACT
SR 14 Both Directions - Friday, April 29 and Monday, May 2: Drivers on both directions of SR 14, between Shaddox Springs Road and Cook-Underwood Road may be alternated through a single-lane, with flaggers, from 6 a.m. to 2 p.m., for commercial filming. Last Updated: 4/29/2016 1:53 PM More Info
From milepost 59 to milepost 64
LOW IMPACT
SR 224 Both Directions - SR-224/SR-225 Benton City: Monday through Friday when traveling through the new intersection work zone motorists will experience intermittent 15 minute delays between 7 a.m. and 5:30 p.m.
Restrictions:
For freight-related restrictions please see the Commercial Vehicle Services Road Restrictions webpage:
http://www.wsdot.wa.gov/commercialVehicle/Restrictions/roadlist.aspx Last Updated: 5/1/2016 8:44 PM More Info
At milepost 0
LOW IMPACT
SR 410 Both Directions - SR 410 remains closed as crews continue clearing Chinook Pass with the goal to reopen the highway by Memorial Day weekend. The pass is currently closed from milepost 74.5, Morse Creek to the SR 123 / SR 410 intersection. Last Updated: 5/1/2016 8:44 PM More Info
From milepost 65 to milepost 74
LOW IMPACT
SR 542 Both Directions - Through Wednesday, June 1 – Drivers should prepare for occasional lane closures on SR 542/Mount Baker Highway between Casey Road and Forest Street from 8 a.m. to 3 p.m. weekdays for utility work. Flaggers will alternate traffic through the open lane. Last Updated: 4/29/2016 7:24 PM More Info
From milepost 25 to milepost 25
LOWEST IMPACT
I-90 Westbound - I-90 westbound milepost 62 to 64: Work to begin the summer of 2016. Last Updated: 5/1/2016 8:43 PM More Info
From milepost 62 to milepost 64
LOWEST IMPACT
I-90 Eastbound - Current Week Traffic Advisory:
Work will resume on May 2, 2016.
Eastbound: Daytime width restriction of 14’ from 6 a.m. to 8 p.m. Expect one lane to be closed as crews install containment nets above the roadway.
Westbound: Daytime width restriction of 14’ from 6 a.m. to 8 p.m. Expect one lane to be closed as crews install containment nets above the roadway. Last Updated: 5/1/2016 8:43 PM More Info
At milepost 137
LOWEST IMPACT
I-90 Eastbound - I-90 milepost 67 to 69 Eastbound: Work will resume in Spring of 2016. Last Updated: 5/1/2016 8:42 PM More Info
From milepost 67 to milepost 69
LOWEST IMPACT
I-90 Westbound - Maintenance/Utility Operations:
I-90 westbound milepost 34 to milepost 37: Monday, May 2 to Friday, May 6 between the hours of 6 a.m. and 4:30 p.m., the right two lanes will be closed for concrete panel replacement. During the evening hours beginning at 4:30 p.m. the double lane closure will be reduced to a single lane closure. Last Updated: 5/1/2016 8:29 PM More Info
From milepost 34 to milepost 37
LOWEST IMPACT
I-90 Eastbound - Maintenance/Utility Operations:
I-90 eastbound milepost 47 to milepost 52 Monday, May 2 to Thursday, May 5 between the hours of 6 a.m. and 4:30 p.m., there will be a mobile sweeping operation on the left shoulder. Last Updated: 5/1/2016 8:29 PM More Info
From milepost 47 to milepost 52
LOWEST IMPACT
I-90 Eastbound - Maintenance/Utility Operations:
I-90 eastbound milepost 52 to milepost 56: Monday, May 2 to Thursday, May 5 from 6 a.m. to 4:30 p.m., there will be a right lane closure each day for catch basin cleaning. Last Updated: 5/1/2016 8:29 PM More Info
From milepost 52 to milepost 56
LOWEST IMPACT
I-90 Westbound - Maintenance/Utility Operations:
I-90 westbound milepost 102: Tuesday, May 3 and Wednesday, May 4 between the hours of 8 a.m. and 3:30 p.m. traffic will be restricted to one lane for bridge deck repair work. Last Updated: 5/1/2016 8:28 PM More Info
At milepost 102
LOWEST IMPACT
US 2 Westbound - The Iron Goat Trail interpretive site and rest area closed for the winter on November 10. In the spring, it typically reopens before Memorial Day. Last Updated: 11/10/2015 10:36 AM More Info
At milepost 58
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations:
US 12 milepost 434, Interstate Bridge at the Washington/Idaho border: Monday, May 2 through Friday, May 6 between the hours of 6 a.m. and 5 p.m. traffic will be restricted to one lane in each direction for bridge washing work. Last Updated: 5/1/2016 8:32 PM More Info
At milepost 434
LOWEST IMPACT
US 12 Both Directions - Current Week Traffic Advisory:
No anticipated traffic impacts. Last Updated: 5/1/2016 8:30 PM More Info
From milepost 380 to milepost 401
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations:
US 12 milepost 380: Monday May 2 from 8:30 a.m. and 3:30 p.m., the Bridge Crew will have flagged traffic control for bridge deck repair work. Last Updated: 5/1/2016 8:30 PM More Info
At milepost 380
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations:
US 12 milepost 380: Monday May 2 from 8:30 a.m. and 3:30 p.m., the Bridge Crew will have flagged traffic control for bridge deck repair work. Last Updated: 5/1/2016 8:30 PM More Info
At milepost 292
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations:
US 12 between milepost 166 (Wildcat Cr.) and milepost 179 ( Bear Canyon), Monday, May 2 to Thursday, May 5 between the hours of 7 a.m. and 4 p.m., there will be flagger controlled alternating traffic with a pilot car for ditch maintenance. Drivers should expect 5-10 minute delays. Last Updated: 5/1/2016 8:27 PM More Info
From milepost 166 to milepost 179
LOWEST IMPACT
US 12 Northbound - Motorists driving on US 12 between Elma and Oakville at milepost 27.2 near Porter Creek can expect reduced speeds and a single lane of alternating traffic until further notice. WSDOT will continue to monitor the hillside and create a plan for permanent repairs. Last Updated: 3/31/2016 8:39 AM More Info
At milepost 27
LOWEST IMPACT
US 97 Both Directions - Current Week Traffic Advisory:
US 97 milepost 33 to milepost 36: Monday May 2 and Tuesday May 3, between 7 a.m. and 5:30 p.m. motorists will experience one lane, two way piloted traffic control with up to a 15 minute delay. Last Updated: 5/1/2016 8:28 PM More Info
From milepost 33 to milepost 35
LOWEST IMPACT
SR 22 Both Directions - Current Week Traffic Advisory:
SR 22 milepost 23 to milepost 36: Monday May 2 to Thursday May 5, between the hours of 7 a.m. and 5:30 p.m. motorists will experience one lane, two way piloted traffic control with up to a 15 minute delay. Last Updated: 5/1/2016 8:30 PM More Info
From milepost 23 to milepost 35
LOWEST IMPACT
SR 22 Both Directions - SR 22 milepost 23 to milepost 36: Monday May 2 through Thursday May 5, between 7 a.m. and 5:30 p.m. motorists will experience one lane, two way piloted traffic control with up to a 15 minute delay. Last Updated: 5/1/2016 8:27 PM More Info
From milepost 23 to milepost 36
LOWEST IMPACT
SR 129 Both Directions - Current Week Traffic Advisory:
SR 129 milepost 32 to milepost 36: Thursday May 5 and Friday May 6 between the hours of 7 a.m. and 5:30 p.m. motorists will experience one lane, two way piloted traffic control with up to a 15 minute delay. Last Updated: 5/1/2016 8:32 PM More Info
From milepost 32 to milepost 36
LOWEST IMPACT
SR 221 Both Directions - Current Week Traffic Advisory:
SR 221 Milepost 0 to milepost 23: Wednesday May 4, between the hours of 7 a.m. and 5:30 p.m. motorists will experience one lane, two way piloted traffic control with up to a 15 minute delay. Last Updated: 5/1/2016 8:32 PM More Info
From milepost 1 to milepost 23
LOWEST IMPACT
SR 397 Both Directions - SR-397 milepost 20 to milepost 22: Between East A Street and City View Cemetery Lane, motorists may experience minor delays while traffic is reduced by a single lane closure in each direction during daylight hours Monday through Friday. Last Updated: 5/1/2016 8:43 PM More Info
From milepost 20 to milepost 22
LOWEST IMPACT
SR 397 Both Directions - Current Week Traffic Advisory:
SR 397 milepost 11 milepost 16: Thursday May 5, between the hours of 7 a.m. and 5:30 p.m. motorists will experience one lane, two way piloted traffic control with up to a 15 minute delay. Last Updated: 5/1/2016 8:31 PM More Info
From milepost 16 to milepost 11