Return to Map

HIGHEST IMPACT
I-5 Southbound - Collision on I-5 southbound at milepost 113.9 near Mcallister Creek beginning at 6:00 pm on April 25, 2015 until further notice. The right lane is blocked. Last Updated: 4/25/2015 6:02 PM More Info
At milepost 114
HIGHEST IMPACT
I-5 Southbound - On I-5 southbound just south of SR 529 (MP 197) there is a collision blocking the left lane. Medical Aid and the State Patrol have arrived on the scene. Last Updated: 4/25/2015 5:35 PM More Info
At milepost 197
HIGH IMPACT
I-5 Both Directions - Saturday, April 25 – A Seattle Mariners baseball game that begins at 6:10 p.m. at Safeco Field will cause additional congestion on highways leading into Seattle, including I-5, I-90, SR 520 and SR 99. Last Updated: 4/10/2015 1:24 PM More Info
From milepost 162 to milepost 174
HIGH IMPACT
I-90 Both Directions - Saturday, April 25 - The I-90 express lanes will be westbound from 7 a.m. to 6:30 p.m. for a Seattle Mariners baseball game. The lanes will open eastbound by 7:30 p.m. Last Updated: 4/2/2015 1:23 PM More Info
From milepost 2 to milepost 10
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15) Traffic Impacts: Friday, May 1 to the morning of Saturday, May 2: Drivers should expect southbound, intermittent, single-lane closures on both directions of I-5, from 10 p.m. to 7 a.m., for excavation, grading and paving work. Last Updated: 4/24/2015 11:44 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15) Traffic Impacts: Thursday, April 30 to the morning of Friday, May 1: Drivers should expect southbound, intermittent, single-lane closures on both directions of I-5, from 9 p.m. to 5 a.m., for excavation, grading and paving work. Last Updated: 4/24/2015 11:41 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15) Traffic Impacts:
Monday, April 27 to the morning of Thursday, April 30: Drivers should expect southbound, intermittent, single-lane closures on both directions of I-5, nightly, from 8 p.m. to 5 a.m., for excavation, grading and paving work. Last Updated: 4/24/2015 11:39 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-90 Eastbound - Wednesday, March 4 to late April - The eastbound I-90 HOV off-ramp to I-405 is closed around the clock for eight weeks for construction. Last Updated: 3/4/2015 10:30 AM More Info
At milepost 10
MODERATE IMPACT
SR 4 Both Directions - SR 4 - 3.1 Miles East of US 101 - Culvert Rehabilitation (milepost 3.1) Traffic impacts: A temporary bypass road is now open on both directions of SR 4. Drivers will follow a marked detour route along Youth Camp Road. Last Updated: 4/24/2015 11:46 AM More Info
At milepost 3
MODERATE IMPACT
SR 410 Both Directions - Uniformed Police Officers will intermittently stop both directions of SR 410 vehicle traffic Sunday morning, April 26, 2015, at Mud Mountain Dam Rd. and 284th Ave SE for the annual Mt. Rainier Duathlon. These intermittent traffic stops will take place between 8:00 a.m. and 12:00 p.m. Sunday to allow the safe passage of cyclists onto and off Westbound SR 410. Last Updated: 4/24/2015 11:17 AM More Info
From milepost 30 to milepost 26
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction
Traffic Impacts:
NOTE: The bridge is now open to traffic. Drivers should expect around-the-clock, alternating, single-lane traffic across the bridge. Drivers should follow signed traffic revisions and wait until the bridge is clear before proceeding across. Last Updated: 1/23/2015 8:17 AM More Info
At milepost 14
MODERATE IMPACT
SR 539 Northbound - Effective through Winter 2016: Canada Border Services Agency has made changes to its Aldergrove border crossing that could result in back-ups on SR 539. Processing has been reduced from three lanes to two. Drivers should consider using the Sumas, Pacific Highway or Peace Arch border crossings to avoid delays. Last Updated: 10/17/2014 8:24 AM More Info
At milepost 15
MODERATE IMPACT
SR 542 Both Directions - Eastbound & westbound traffic is alternating on SR 542/Mount Baker Hwy near Glacier Springs (MP 30) as part of an emergency project to realign the roadway due to the Nooksack River eroding land near the eastbound lane. Work will be complete in April 2015. Last Updated: 2/20/2015 8:53 AM More Info
At milepost 30
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75)
Traffic Impacts: Monday, April 27 to Friday, May 1: A single-lane will be closed approaching the rest area nightly for sewer line installation work, from 7 p.m. to 5 a.m.
Monday, April 27, to the morning of Thursday, April 30: Two lanes of northbound I-5 will be closed near the Gee Creek Rest Area from 8 p.m. to 5 a.m., nightly for utility work. Last Updated: 4/24/2015 11:49 AM More Info
At milepost 11
LOW IMPACT
I-5 Northbound - Drivers may experience increased congestion in Skagit County, particularly around the exits to La Conner, from March 28-April 30 for the Skagit Valley Tulip Festival. Last Updated: 3/16/2015 1:26 PM More Info
From milepost 226 to milepost 230
LOW IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 57 to 63 Eastbound: Friday night, April 24 and Monday through Friday nights, April 27 to May 1: Traffic will be reduced to one lane eastbound. Monday and Tuesday, the lane closure will not be picked up until 11 a.m.; motorists may experience added travel time and delay..Daytime: Monday through Friday days: Drivers should prepare for intermittent rolling slowdowns and possible added travel time in both directions. Last Updated: 4/24/2015 11:15 AM More Info
From milepost 57 to milepost 63
LOW IMPACT
I-90 Eastbound - I-90 Vantage Bridge milepost 136 to milepost 137, eastbound only, Mid May through Nov. 1: No loads over 14’ wide 24 hours per day, 7 days a week. Possible detour route available via I-82, I-182, and US 395 Last Updated: 4/24/2015 11:08 AM More Info
From milepost 136 to milepost 137
LOW IMPACT
I-205 Both Directions - I-205 - Mill Plain Interchange to 18th Street Improvements: (I-205 mileposts 27.22 to 30.28)
Traffic Impacts: The evening of Friday, May 1 to the morning of Saturday, May 2: Drivers should expect intermittent double-lane closures on south bound I-205 between Mill Plain and SR 500 from 8 p.m. to 10 a.m. for stripping work and traffic lane shifting. Work is weather dependent. Last Updated: 4/24/2015 11:19 AM More Info
From milepost 27 to milepost 31
LOW IMPACT
I-205 Both Directions - I-205 - Mill Plain Interchange to 18th Street Improvements: (I-205 mileposts 27.22 to 30.28)
Traffic Impacts: Monday, April 27 to the morning of Friday, May 1: Drivers should expect intermittent, single-lane closures on both directions of I-205, between Mill Plain and SR 500, nightly from 8 p.m. to 6 a.m., for material delivery and paving. Work is weather dependent. Last Updated: 4/24/2015 11:18 AM More Info
From milepost 27 to milepost 31
LOW IMPACT
US 12 Both Directions - US 12 White Pass milepost 142 to 143: Monday April 27, through Friday May 1, during daylight hours. Drivers should prepare for potential delays in both directions of US 12, west of the White Pass Summit, due to a daytime single-lane closure. Flaggers will alternate traffic through the work zone. Last Updated: 4/24/2015 11:04 AM More Info
From milepost 142 to milepost 143
LOW IMPACT
US 97 Both Directions - US 97, Biggs Rapid Bridge Painting (mileposts 0.25 to 0.49)
Traffic Impacts:
Monday, April 27 to Friday, May 1: Drivers should expect intermittent, alternating, single-lane closures, with flaggers, across the bridge nightly, from 10 p.m. to 5 a.m. for painting. Last Updated: 4/24/2015 11:34 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
US 395 Southbound - US 395 milepost 25 to 36, southbound: Monday through Friday, 7 a.m. to 5 p.m., drivers should expect one lane closures between East Elm Road and Foster Wells Road traveling southbound on US 395. Last Updated: 4/24/2015 11:07 AM More Info
From milepost 25 to milepost 36
LOW IMPACT
SR 6 Both Directions - SR 6, Rock Creek East and West Bridges - Replacement (mileposts 25.95 to 26.94)
Traffic Impacts:
Monday, April 27 to Friday, May 1: Both directions of traffic may be alternated through a single-lane of the Rock Creek Bridge daily, from 7 a.m. to 5:30 p.m., for bridge replacement work. Work is weather dependent. Last Updated: 4/24/2015 11:44 AM More Info
From milepost 26 to milepost 27
LOW IMPACT
SR 240 Both Directions - SR 240 both directions from milepost 34 to milepost 35 near Aaron Drive: On Sunday April 26 between the hours of 5 a.m. and 2 p.m.
there will be multiple lane closures as crews replace traffic signal control equipment at the intersection. Left turn lanes east and westbound will be closed for the duration of the work effort and multiple variations of lane closure and restrictions will be modified as needed to complete the work process. Motorists are encouraged to consider alternate routes as si Last Updated: 4/24/2015 7:13 PM More Info
From milepost 34 to milepost 35
LOW IMPACT
SR 502 Both Directions - SR 502, Widening from I-5 to Battle Ground (mileposts 0.59 to 6.61)
Traffic Impacts: Monday, April 27 to Friday, May 1: Drivers should expect daytime, intermittent, single-lane closures, from I-5 to Battle Ground, daily, from 9 a.m. to 3 p.m. for roadway widening. Last Updated: 4/24/2015 11:08 AM More Info
From milepost 1 to milepost 7
LOW IMPACT
SR 509 Southbound - Thursday, April 23 to the morning of Monday, April 27 - The southbound SR 509 off-ramp to South 160th Street will be closed from 10 p.m. to 5 a.m. Thursday and Sunday nights for grinding and paving work. Last Updated: 4/23/2015 6:12 PM More Info
At milepost 25
LOW IMPACT
SR 509 Southbound - Thursday, April 23 to the morning of Monday, April 27 - The right lane of southbound SR 509 from 5th Avenue South/Glendale Way South to South 160th Street will be closed from 8 p.m. to 5 a.m. Thursday and Sunday nights for grinding and paving work. Last Updated: 4/23/2015 6:10 PM More Info
From milepost 28 to milepost 25
LOW IMPACT
SR 520 Westbound - Monday, April 20 to the morning of Sunday, April 26 - The right lane of westbound SR 520 from the west highrise to Montlake Boulevard East/SR 513 will be closed from 9 p.m. to 6 a.m. Monday, Tuesday, Wednesday, Thursday and Saturday nights for bridge work. Last Updated: 4/16/2015 12:48 PM More Info
From milepost 3 to milepost 1
LOW IMPACT
SR 971 Both Directions - On SR 971 Monday through Thursday, 8 a.m. to 4:30 p.m., between Minneapolis Beach and Pat and Mike's, expect shoulder closures, lane shifts or flagger controlled traffic as needed where utility crews are replacing power poles and power lines. Last Updated: 4/24/2015 11:43 AM More Info
From milepost 14 to milepost 15
LOWEST IMPACT
I-82 Eastbound - Wednesday April 29, I-82 eastbound near milepost 31: right lane closure between the hours of 8:30 a.m. and 4 p.m. for bridge cleaning work. No detours are planned for this work as impacts for traffic coming out of Selah are expected to be minimal. Last Updated: 4/24/2015 4:40 PM More Info
At milepost 31
LOWEST IMPACT
I-82 Westbound - Wednesday, April 29, I-82 westbound near milepost 8: right lane closure between the hours of 7 a.m. and 3 p.m. for ditch maintenance work. Last Updated: 4/24/2015 4:38 PM More Info
At milepost 8
LOWEST IMPACT
I-82 Eastbound - On Thursday April 30, I-82 eastbound near milepost 31: left lane closure between the hours of 8:30 a.m. and 4 p.m. for bridge cleaning work. No detours are planned for this work as impacts for traffic coming out of Selah are expected to be minimal. Last Updated: 4/24/2015 1:43 PM More Info
At milepost 31
LOWEST IMPACT
I-82 Westbound - On Tuesday April 28, I-82 westbound near milepost 31: left lane closure between the hours of 7:30 a.m. and 4 p.m. for bridge cleaning operations. Last Updated: 4/24/2015 1:36 PM More Info
At milepost 31
LOWEST IMPACT
I-82 Westbound - On Monday April 27, I-82 westbound near milepost 31: right lane closure between the hours of 7:30 a.m. and 4 p.m. for bridge cleaning operations. Last Updated: 4/24/2015 1:34 PM More Info
At milepost 31
LOWEST IMPACT
I-82 Both Directions - I-82 Selah Creek Rest Areas both directions: Water and sewer services for recreational vehicles are closed at both rest areas to upgrade the facilities. The dump stations will reopen in early May for use by recreational travelers. Last Updated: 4/24/2015 11:16 AM More Info
At milepost 22
LOWEST IMPACT
I-90 Eastbound - Monday and Tuesday, April 27 and 28, I-90 eastbound near milepost 95: right lane closure between the hours of 7 a.m. and 3 p.m. for ditch maintenance work. Last Updated: 4/24/2015 4:36 PM More Info
At milepost 95
LOWEST IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass rock blasting closures are scheduled to resume the week of May 18, 2015 Last Updated: 4/24/2015 11:18 AM More Info
At milepost 58
LOWEST IMPACT
I-182 Westbound - I-182 westbound from milepost 9 to milepost 12: Monday April 27 through Thursday April 30 between the hours of 8 a.m. and 4 p.m., WSDOT crews will close the right lane for pavement surface repair and sealing work. Motorists should anticipate and expect delays in the work zone area. Work is weather dependent. Last Updated: 4/24/2015 10:52 AM More Info
From milepost 9 to milepost 12
LOWEST IMPACT
US 2 Westbound - The Iron Goat Trail interpretive site and rest area closed for the season November 4 and should reopen by Memorial Day in the spring. Last Updated: 2/20/2015 10:10 AM More Info
From milepost 58 to milepost 58
LOWEST IMPACT
US 395 Northbound - US 395 northbound from milepost 17 to milepost 18: On Monday April 27 between the hours of 9 a.m. and 2 p.m. there will be a left lane closure as WSDOT crews replace damaged concrete barriers. Last Updated: 4/24/2015 11:01 AM More Info
From milepost 17 to milepost 18
LOWEST IMPACT
SR 224 Westbound - SR 224 westbound from milepost 8 to milepost 10: On Monday April 27 between the hours of 7 a.m. and 9 a.m. crews will have a right lane closure for under-bridge inspection work. Last Updated: 4/24/2015 10:59 AM More Info
From milepost 8 to milepost 10
LOWEST IMPACT
SR 225 Both Directions - SR 225 from the start of the route to milepost 1 near Benton City: On Monday April 27 between the hours of 10 a.m. and 3 p.m. traffic will be reduced to one lane across the bridge as crews perform under-bridge inspection work. Flaggers, orange cones, and signs will direct travelers through the work zone. Last Updated: 4/24/2015 11:00 AM More Info
At milepost 1
LOWEST IMPACT
SR 500 Both Directions - SR 500 - BNSF Project (mileposts 19.5 to 20.0)
Traffic Impacts: Monday, April 27 to Friday, May 1: Drivers should expect daytime, single-lane closures, on both directions of SR 500, for trucks entering and exiting the roadway and guardrail work. Last Updated: 4/24/2015 11:20 AM More Info
From milepost 0 to milepost 20
LOWEST IMPACT
SR 821 Both Directions - Thursday, April 30, SR-821 near milepost 19: single lane flagged traffic between the hours of 7 a.m. to 3 p.m. for ditch maintenance work. Motorists traveling this route may experience added travel time and some delay. Last Updated: 4/24/2015 4:37 PM More Info
At milepost 19