Return to Map

HIGHEST IMPACT
I-5 Southbound - On the I-5 southbound on-ramp from SR 520 (MP 168) there is a collision partially blocking the ramp. The State Patrol has arrived on the scene. Last Updated: 4/29/2016 12:34 AM More Info
At milepost 168
HIGH IMPACT
I-5 Northbound - Road work on I-5 northbound at milepost 131.0 near 48th St beginning at 11:45 pm on April 28, 2016 until about 4:30 am on April 29, 2016. Last Updated: 4/28/2016 11:46 PM More Info
At milepost 131
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound at milepost 134.0 near Mckinley Way beginning at 9:27 pm on April 28, 2016 until about 6:00 am on April 29, 2016. Right lane closed. Last Updated: 4/28/2016 9:30 PM More Info
At milepost 134
HIGH IMPACT
I-5 Northbound - Road work on I-5 northbound at milepost 134.9 near Portland Ave beginning at 9:23 pm on April 28, 2016 until about 4:00 am on April 29, 2016. Last Updated: 4/28/2016 9:27 PM More Info
At milepost 135
HIGH IMPACT
I-5 Southbound - Road work on I-5 southbound at milepost 135.0 near Tacoma beginning at 9:22 pm on April 28, 2016 until about 5:30 am on April 29, 2016. Right lane closed. Last Updated: 4/28/2016 9:25 PM More Info
At milepost 135
HIGH IMPACT
I-5 Northbound - Thursday, April 28, to the morning of Friday, April 29 – All lanes of northbound I-5 at 116th Street Northeast will be closed from 1 a.m. to 3 a.m. for construction work. A signed detour via the 116th Street Northeast off-ramp and on-ramp will be in place. Last Updated: 4/27/2016 4:21 PM More Info
At milepost 202
HIGH IMPACT
SR 7 Northbound - Northbound SR 7 on-ramp to southbound I-5 is closed for construction through winter 2017. Last Updated: 3/24/2016 9:27 AM More Info
From milepost 58 to milepost 59
HIGH IMPACT
SR 16 Eastbound - Road work on SR 16 eastbound at milepost 0.0 near I 5 beginning at 10:41 pm on April 28, 2016 until about 5:00 am on April 29, 2016. Last Updated: 4/28/2016 10:43 PM More Info
At milepost 0
HIGH IMPACT
SR 99 Both Directions - Beginning Friday, April 29 - Both directions of the Alaskan Way Viaduct/SR 99 between the West Seattle Bridge and the south end of the Battery Street Tunnel will be closed for approximately two weeks beginning at 12:01 a.m. Friday, April 29, for tunneling work. On-ramps will start to close at 10 p.m. Thursday, April 28. Last Updated: 4/28/2016 9:37 PM More Info
From milepost 29 to milepost 33
MODERATE IMPACT
I-5 Northbound - Thursday, April 28, to the morning of Friday, April 29 – The SR 529 on-ramp to northbound I-5 may be closed from 8 p.m. to 8 a.m. for striping work. This work is weather dependent. Last Updated: 4/28/2016 9:29 PM More Info
From milepost 198 to milepost 199
MODERATE IMPACT
I-5 Northbound - Thursday, April 28, to the morning of Friday, April 29 – The northbound I-5 off-ramp to SR 528 may be closed from 8 p.m. to 8 a.m. for striping work. This work is weather dependent. Last Updated: 4/27/2016 4:29 PM More Info
From milepost 198 to milepost 199
MODERATE IMPACT
I-5 Northbound - Thursday, April 28, to the morning of Friday, April 29 – Up to three right lanes of northbound I-5 before SR 528 will be closed for striping work beginning with one right lane at 8 p.m. All lanes will reopen by 8 a.m. This work is weather dependent. Last Updated: 4/27/2016 4:23 PM More Info
From milepost 198 to milepost 199
MODERATE IMPACT
I-5 Southbound - Sunday, April 24, to Sunday, May 1 – Up to four right lanes of southbound I-5 from SR 516 to SR 18 will be closed nightly for construction work beginning with one right lane at 8 p.m. All lanes will reopen by noon. Last Updated: 4/26/2016 3:49 PM More Info
From milepost 149 to milepost 143
MODERATE IMPACT
I-5 Southbound - Sunday, April 24, to Friday, April 29 – Up to four left lanes of southbound I-5 from South 200th Street to South 272nd Street will be closed nightly for construction work beginning with one right lane at 8 p.m. All lanes will reopen by noon. Last Updated: 4/26/2016 3:48 PM More Info
From milepost 151 to milepost 148
MODERATE IMPACT
I-90 Both Directions - I-90Snoqualmie Pass rock blasting is completed for this week. During blasting closures eastbound traffic will stopped at Gold Creek milepost 56, and westbound traffic will be stopped at milepost 63 Cabin Creek. No services are available past exit 53 eastbound and exit 70 westbound during blasting closures. Anticipate one hour or more of added travel time. Last Updated: 4/28/2016 10:41 PM More Info
From milepost 56 to milepost 63
MODERATE IMPACT
I-90 Both Directions - Thursday, April 28 – The I-90 express lanes will close at 10 p.m. for construction work. The lanes will open westbound by 6 a.m. Last Updated: 4/28/2016 10:23 PM More Info
From milepost 2 to milepost 10
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 62 to 69 Snoqualmie Pass Wildlife Bridge: Motorists will encounter night time lane closures Monday thru Thursday in both the east and westbound directions of travel. Minor delays should be anticipated. Rock blasting closure scheduled Thursday April 28, from 7 p.m. to 8 p.m. traffic will be stopped between Gold Creek, MP 56 and Cabin Creek, MP 63. Last Updated: 4/27/2016 8:59 PM More Info
From milepost 62 to milepost 69
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 56 to 61: Daytime: Monday through Friday noon, drivers should prepare for intermittent rolling slowdowns and possible added travel time in both directions. Nighttime: Monday night April 25 through Saturday morning April 30, eastbound traffic will be reduced to one lane each night. Motorists may experience added travel time and delays. I-90 is closed to bicycles in both directions between the Hyak interchange (Exit 54) and Stampede Pass interchange (exit 62). Last Updated: 4/27/2016 12:04 AM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Westbound - I-90 Oakes Ave Interchange to Peoh Rd. mileposts 84 to 87: Westbound traffic will be reduced to one lane 24 hours per day, weekdays. Both lanes will be open on the weekends. Westbound Oaks Ave. Exit 84 will be closed Monday through Friday. In mid May to mid June, Oaks Ave will be closed 24 hours per day. Drivers can access Cle Elum via the Peoh Road Bridge interchange at exit 85. Westbound on ramp at MP 85 will be closed during the same time frame. Last Updated: 4/27/2016 12:04 AM More Info
From milepost 84 to milepost 87
MODERATE IMPACT
I-90 Eastbound - Thursday, April 28, to the morning of Friday, April 29 – The northbound Rainier Avenue South on-ramp to eastbound I-90 will be closed from 9 p.m. to 5 a.m. for electrical work. A signed detour will be in place. Last Updated: 4/19/2016 1:09 PM More Info
At milepost 3
MODERATE IMPACT
I-90 Eastbound - Thursday, April 28, to the morning of Friday, April 29 – The right lane of eastbound I-90 in the Mount Baker Tunnel will be closed from 9 p.m. to 5 a.m. for construction work. Last Updated: 4/19/2016 1:02 PM More Info
From milepost 4 to milepost 5
MODERATE IMPACT
I-90 Westbound - Monday, April 25, to the morning of Friday, April 29 – One lane of westbound I-90 in the Mount Baker Tunnel will be closed from 9 p.m. to 5 a.m. nightly for construction work. Last Updated: 4/19/2016 12:57 PM More Info
From milepost 4 to milepost 4
MODERATE IMPACT
I-90 Eastbound - Sunday, April 24, to the morning of Friday, April 29 – Two right lanes of eastbound I-90 from I-5 to Rainier Avenue South will be closed from 9 p.m. to 5 a.m. nightly for construction work. Last Updated: 4/19/2016 12:56 PM More Info
From milepost 0 to milepost 3
MODERATE IMPACT
US 2 Both Directions - Motorists may encounter flagger controlled traffic and possible delays on US 2 at milepost 131, in the Baker Flats area north of East Wenatchee, due to roundabout construction. The hours of operation on this project are Monday through Thursday from 7:00 am to 7:00 pm and then Friday from 7:00 am to noon. Last Updated: 4/18/2016 11:03 AM More Info
At milepost 131
MODERATE IMPACT
SR 4 Both Directions - Drivers should expect intermittent single-lane closures on both directions of SR 4 between Elochoman Valley Road and Risk Road daily, 6 a.m. to 6 p.m. for landscaping and striping work. Last Updated: 2/5/2016 1:11 PM More Info
From milepost 34 to milepost 35
MODERATE IMPACT
SR 9 Both Directions - Monday, April 25, to Friday, April 29 – A single lane of SR 9 between McMurray Shore Drive and West Big Lake Boulevard will be closed from 6 a.m. to 6 p.m. daily for utility work. Flaggers will alternate traffic through the open lane. Last Updated: 4/27/2016 4:51 PM More Info
From milepost 41 to milepost 44
MODERATE IMPACT
SR 14 Both Directions - Sunday, April 24 to Sunday, May 1: Around-the-clock, single-lane closures on both directions of SR 14, between milepost 58.84 to 58.94, for rock scaling work. NOTE: Tunnel 3 will have height and length restrictions in place for the duration of the project.
NOTE: Drivers should expect delays of up to 20 minutes.
NOTE: The speed limit on SR 14 has been reduced to 25 mph, through this section of highway, for the duration of the project. Last Updated: 4/22/2016 2:38 PM More Info
At milepost 59
MODERATE IMPACT
SR 99 Both Directions - The SR 99 Alaskan Way Viaduct is closed due to construction for approximately 2 weeks from W Seattle Bridge to Battery St Tunnel Last Updated: 4/29/2016 12:02 AM More Info
From milepost 22 to milepost 26
MODERATE IMPACT
SR 167 Southbound - Thursday, April 28, to the morning of Friday, April 29 – The southbound SR 167 off-ramp to South 277th Street will be closed from 9 p.m. to 5 a.m. for striping work. This work is weather dependent. A signed detour will be in place. Last Updated: 4/21/2016 10:20 AM More Info
At milepost 18
MODERATE IMPACT
SR 167 Southbound - Thursday, April 28, to the morning of Friday, April 29 – The westbound SR 18 ramp to southbound SR 167 will be closed from 10 p.m. to 5 a.m. for striping work. This work is weather dependent. A signed detour will be in place. Last Updated: 4/21/2016 10:19 AM More Info
At milepost 14
MODERATE IMPACT
SR 167 Southbound - Thursday, April 28, to the morning of Friday, April 29 – The southbound SR 167 ramp to eastbound SR 18 will be closed from 10 p.m. to 5 a.m. for striping work. This work is weather dependent. A signed detour will be in place. Last Updated: 4/21/2016 10:18 AM More Info
At milepost 14
MODERATE IMPACT
SR 167 Southbound - Thursday, April 28, to the morning of Friday, April 29 – The southbound SR 167 off-ramp to 15th Street Southwest will be closed from 9 p.m. to 5 a.m. for striping work. This work is weather dependent. A signed detour will be in place. Last Updated: 4/21/2016 10:17 AM More Info
At milepost 15
MODERATE IMPACT
SR 167 Southbound - Thursday, April 28, to the morning of Friday, April 29 – The left lane of southbound SR 167 from SR 18 to 15th Street Southwest will be closed from 10 p.m. to 4 a.m. for striping work. This work is weather dependent. Last Updated: 4/21/2016 10:16 AM More Info
From milepost 14 to milepost 15
MODERATE IMPACT
SR 167 Northbound - Thursday, April 28, to the morning of Friday, April 29 – The Ellingson Road on-ramp to northbound SR 167 will be closed from 9 p.m. to 5 a.m. for construction work. A signed detour will be in place. Last Updated: 4/21/2016 10:15 AM More Info
At milepost 13
MODERATE IMPACT
SR 167 Southbound - Monday, April 25, to the morning of Friday, April 29 – The southbound SR 167 off-ramp to Ellingson Road will be closed from 9 p.m. to 5 a.m. nightly for construction work. A signed detour will be in place. Last Updated: 4/21/2016 10:10 AM More Info
At milepost 13
MODERATE IMPACT
SR 167 Southbound - Monday, April 25, to the morning of Friday, April 29 – The right lane of southbound SR 167 from 15th Street Southwest to Ellingson Road will be closed from 10 p.m. to 5 a.m. nightly for paving work. This work is weather dependent. Last Updated: 4/21/2016 10:09 AM More Info
From milepost 15 to milepost 13
MODERATE IMPACT
SR 433 Northbound - Saturday, April 23 to the morning of Sunday, April 24: Drivers on both directions of SR 433/Lewis and Clark Bridge, may be alternated through a single-lane, with flaggers, from 11 p.m. to 8 a.m., for wire installation along the length of the bridge. Last Updated: 4/22/2016 2:40 PM More Info
At milepost 0
MODERATE IMPACT
SR 433 Both Directions - Friday, April 22 to the morning of Saturday, April 23: Drivers on both directions of SR 433/Lewis and Clark Bridge, may be alternated through a single-lane, with flaggers, from 10 p.m. to 4 a.m., for wire installation along the length of the bridge. Last Updated: 4/22/2016 2:39 PM More Info
At milepost 0
MODERATE IMPACT
SR 433 Both Directions - Monday, April 25 to the morning of Friday, April 29: Drivers on both directions of SR 433/Lewis and Clark Bridge, may be alternated through a single-lane, with flaggers, from 9 p.m. to 5 a.m., for wire installation along the length of the bridge. Last Updated: 4/22/2016 2:37 PM More Info
At milepost 0
MODERATE IMPACT
SR 501 Both Directions - Monday, April 25 to Sunday, May 1: Drivers on both directions of SR 501 between North Smythe Road and North Reiman Road will be alternated through a single-lane of traffic around-the-clock for hillside stabilization and roadway repair work. Use caution and expect delays.
NOTE: The speed limit in this area has been temporarily reduced from 40 mph to 25 mph through the work zone. Last Updated: 4/22/2016 2:42 PM More Info
From milepost 18 to milepost 19
MODERATE IMPACT
SR 502 Both Directions - Monday, April 25 to Friday, April 29: A single-lane in either direction of SR 502 maybe closed intermittently between I-5 to Battle Ground daily from 9 a.m. to 3 p.m. for roadway widening.
NOTE: Work is weather dependent. Last Updated: 4/22/2016 2:42 PM More Info
From milepost 0 to milepost 7
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction
Traffic Impacts:
NOTE: The bridge is now open to traffic. Drivers should expect around-the-clock, alternating, single-lane traffic across the bridge. Drivers should follow signed traffic revisions and wait until the bridge is clear before proceeding across. Last Updated: 1/29/2016 11:47 AM More Info
At milepost 14
MODERATE IMPACT
SR 520 Westbound - Monday, April 25, to the morning of Friday, April 29 – The right lane of westbound SR 520 from Foster Island to Montlake Boulevard East/SR 513 will be closed from 9 p.m. to 6 a.m. nightly for construction work. Last Updated: 4/26/2016 4:02 PM More Info
From milepost 2 to milepost 1
MODERATE IMPACT
SR 520 Eastbound - Monday, April 25, to the morning of Sunday, May 1 - There will be rolling slowdowns on the Montlake Boulevard East on-ramp to eastbound SR 520 from 9 p.m. to 5 a.m. nightly for construction work. Last Updated: 4/22/2016 11:46 AM More Info
At milepost 1
MODERATE IMPACT
SR 520 Eastbound - Monday, April 25, to the morning of Friday, April 29 – One lane of eastbound SR 520 at the floating bridge will be closed from 9 p.m. to 6 a.m. for construction work. Last Updated: 4/15/2016 1:43 PM More Info
At milepost 3
MODERATE IMPACT
SR 522 Westbound - Monday, April 25, to Friday, April 29 – One lane of westbound SR 522 from the Snohomish River Bridge to US 2 may be closed from 9 a.m. to 5 p.m. daily for bridge deck inspection work. Last Updated: 4/21/2016 2:18 PM More Info
At milepost 20
MODERATE IMPACT
SR 532 Both Directions - Tuesday, April 26, to the morning of Friday, April 29 – A single lane of SR 532 from Smith Road to the Stillaguamish River Bridge will be closed from 9 p.m. to 6 a.m. nightly for construction work. Flaggers will alternate traffic through the open lane. Last Updated: 4/27/2016 4:24 PM More Info
From milepost 2 to milepost 4
MODERATE IMPACT
SR 900 Both Directions - Thursday, April 28, to the morning of Friday, April 29 – One lane in both directions of SR 900 from 68th Avenue South to Oaksdale Avenue Southwest will be closed from 8 p.m. to 5 a.m. for construction work. Last Updated: 4/22/2016 12:28 PM More Info
From milepost 8 to milepost 10
LOW IMPACT
I-5 Northbound - Wednesday, April 27 to the morning of Friday, April 29: The Harrison Avenue off-ramp from northbound I-5 will be closed nightly, from 10 p.m. to 6 a.m., for grinding, loops, striping and paving work. Last Updated: 4/22/2016 2:50 PM More Info
At milepost 83
LOW IMPACT
I-5 Southbound - Monday, April 25 to the morning of Sunday, May 1: The Harrison Avenue on-ramp to southbound I-5 will close from 10 p.m. to 6 a.m. nightly for paving. The work is weather dependent. Last Updated: 4/22/2016 2:50 PM More Info
At milepost 83
LOW IMPACT
I-5 Both Directions - Thursday, April 28 to the morning of Friday, April 29: A single lane in either direction of I-5 may close intermittently between Mellen Street and Harrison Avenue from 9 p.m. to 5 a.m. for grinding and paving work. Last Updated: 4/22/2016 2:47 PM More Info
From milepost 80 to milepost 85
LOW IMPACT
I-90 Eastbound - I-90 milepost 63 Eastbound: Monday through Thursday, between 6 p.m. to 6 a.m., I-90 travelers will encounter lane closures and an off ramp by-pass. Motorists should anticipate minor delays to travel time. Last Updated: 4/27/2016 12:04 AM More Info
At milepost 63
LOW IMPACT
I-205 Both Directions - Monday, April 25 to the morning of Friday, April 29: Up to two lanes on either direction of I-205 will be closed between Mill Plain Boulevard and SR 500, nightly, from 11 p.m. to 5 a.m., for grinding, paving, striping and concrete barrier removal work.
NOTE: Drivers should watch for signed detours and flaggers. Last Updated: 4/22/2016 2:44 PM More Info
From milepost 27 to milepost 31
LOW IMPACT
I-405 Southbound - Thursday, April 28 to the morning of Friday, April 29 - One right lane of southbound I-405 between I-5 and SR 527 will be closed from 10 p.m. to 4:30 a.m. Last Updated: 4/28/2016 2:05 PM More Info
From milepost 30 to milepost 27
LOW IMPACT
I-405 Northbound - Thursday, April 28 to the morning of Friday, April 29 - One right lane of northbound I-405 between Northeast 160th Street and SR 522 will be closed from 9 p.m. to 6 a.m. Last Updated: 4/28/2016 2:04 PM More Info
From milepost 23 to milepost 24
LOW IMPACT
I-405 Northbound - Thursday, April 28 to the morning of Friday, April 29 - One right lane of northbound I-405 between Northeast 124th Street and Northeast 132nd Street will be closed from 8 p.m. to 6:30 a.m. Last Updated: 4/28/2016 2:04 PM More Info
From milepost 20 to milepost 21
LOW IMPACT
I-405 Northbound - Thursday, April 28 to the morning of Friday, April 29 - Up to four right lanes of northbound I-405 between SR 520 and Northeast 70th Place will be closed from 8 p.m. to 5 a.m. Last Updated: 4/28/2016 2:02 PM More Info
From milepost 15 to milepost 18
LOW IMPACT
I-405 Northbound - Thursday, April 28 to the morning of Friday, April 29 - Up to four right lanes of northbound I-405 between SR 520 and Northeast 70th Place will be closed from 8 p.m. to 5 a.m. Last Updated: 4/28/2016 1:57 PM More Info
From milepost 15 to milepost 18
LOW IMPACT
I-405 Northbound - Thursday, April 28 to the morning of Friday, April 29 - One left lane of northbound I-405 between Northeast 6th Street and SR 520 will be closed from 8 p.m. to 5 a.m. Last Updated: 4/28/2016 1:57 PM More Info
From milepost 14 to milepost 15
LOW IMPACT
I-405 Southbound - Thursday, April 28 to the morning of Friday, April 29 - One left lane of southbound I-405 between SR 520 and Northeast 6th Street will be closed from 7 p.m. to 4:30 a.m. Last Updated: 4/28/2016 1:34 PM More Info
From milepost 15 to milepost 14
LOW IMPACT
I-405 Southbound - Thursday, April 28 to the morning of Friday, April 29 - The Northeast 160th Street on-ramp to southbound I-405 will be closed from 8 p.m. to 6 a.m. Last Updated: 4/28/2016 1:33 PM More Info
At milepost 23
LOW IMPACT
I-405 Northbound - Thursday, April 28 to the morning of Friday, April 29 - The northbound I-405 off-ramp to SR 522 will be closed from 9 p.m. to 6 a.m. Last Updated: 4/28/2016 1:32 PM More Info
At milepost 24
LOW IMPACT
I-405 Northbound - Thursday, April 28 to the morning of Friday, April 29 - The Northeast 160th Street on-ramp to northbound I-405 will be closed from 10 p.m. to 6 a.m. Last Updated: 4/28/2016 1:31 PM More Info
At milepost 23
LOW IMPACT
I-405 Northbound - Thursday, April 28 to the morning of Friday, April 29 - The Northeast 124th Street on-ramp to northbound I-405 will be closed from 10 p.m. to 6 a.m. Last Updated: 4/28/2016 1:27 PM More Info
At milepost 20
LOW IMPACT
I-405 Northbound - Thursday, April 28 to the morning of Friday, April 29 - The SR 520 on-ramp to northbound I-405 will be closed from 10 p.m. to 5 a.m. Last Updated: 4/28/2016 1:26 PM More Info
At milepost 15
LOW IMPACT
I-405 Northbound - Thursday, April 28 to the morning of Friday, April 29 - The Northeast 6th Street on-ramp to northbound I-405 will be closed from 11 p.m. to 5 a.m. Last Updated: 4/28/2016 1:24 PM More Info
At milepost 14
LOW IMPACT
I-405 Southbound - Thursday, April 28 to the morning of Friday, April 29 - The southbound I-405 off-ramp to Northeast 6th Street will be closed from 11 p.m. to 5 a.m. Last Updated: 4/28/2016 1:24 PM More Info
At milepost 14
LOW IMPACT
US 12 Both Directions - US 12 White Pass: The temporary washout repairs were completed Feb. 1. A traffic signal will continue to direct traffic through a single lane near these repair areas. Work to reconstruct the roadway in the three washout locations will resume in early May. Last Updated: 4/27/2016 12:04 AM More Info
From milepost 138 to milepost 156
LOW IMPACT
US 97 Northbound - SR 223, SR 22, and US 97, Granger to Union Gap: Sunday, May 1, drivers should be alert and pay attention to pedestrians walking, northbound from Granger to Union Gap. There is a 27-mile march taking place from 4:30 a.m. to 5:30 p.m. Last Updated: 4/28/2016 7:36 PM More Info
At milepost 73
LOW IMPACT
SR 14 Both Directions - Monday, April 25 to Friday, April 29: Drivers on both directions of SR 14, between Second Street and Marble Road, will be alternated through a single-lane, with flaggers, from 7 a.m. to 5 p.m., for curbing work. Last Updated: 4/22/2016 2:46 PM More Info
From milepost 15 to milepost 23
LOW IMPACT
SR 224 Both Directions - SR-224/SR-225 Benton City: Monday through Friday when traveling through the new intersection work zone motorists will experience intermittent 15 minute delays between 7 a.m. and 5:30 p.m. Last Updated: 4/27/2016 12:04 AM More Info
At milepost 0
LOW IMPACT
SR 410 Both Directions - SR 410 remains closed as crews continue clearing Chinook Pass with the goal to reopen the highway by Memorial Day weekend. The pass is currently closed from milepost 74.5, Morse Creek to the SR 123 / SR 410 intersection. Last Updated: 4/28/2016 8:24 PM More Info
From milepost 65 to milepost 74
LOW IMPACT
SR 508 Both Directions - Monday, April 25 to Friday, April 29: Drivers on both directions of SR 508, between Hyak Road and Alexander Road, may be alternated through a single-lane from 7 a.m. to 4:30 p.m. for utility replacement work. Last Updated: 4/22/2016 2:43 PM More Info
From milepost 7 to milepost 8
LOWEST IMPACT
I-90 Westbound - I-90 westbound milepost 62 to 64: Work to begin the summer of 2016. Last Updated: 4/27/2016 12:04 AM More Info
From milepost 62 to milepost 64
LOWEST IMPACT
I-90 Eastbound - I-90 milepost 137 Vantage Bridge: Work will resume on May 2, 2016 Last Updated: 4/27/2016 12:04 AM More Info
At milepost 137
LOWEST IMPACT
I-90 Eastbound - I-90 milepost 67 to 69 Eastbound: Work will resume in Spring of 2016. Last Updated: 4/27/2016 12:04 AM More Info
From milepost 67 to milepost 69
LOWEST IMPACT
US 2 Westbound - The Iron Goat Trail interpretive site and rest area closed for the winter on November 10. In the spring, it typically reopens before Memorial Day. Last Updated: 11/10/2015 10:36 AM More Info
At milepost 58
LOWEST IMPACT
US 12 Northbound - Motorists driving on US 12 between Elma and Oakville at milepost 27.2 near Porter Creek can expect reduced speeds and a single lane of alternating traffic until further notice. WSDOT will continue to monitor the hillside and create a plan for permanent repairs. Last Updated: 3/31/2016 8:39 AM More Info
At milepost 27
LOWEST IMPACT
SR 397 Both Directions - SR-397 milepost 20 to milepost 22: Between East A Street and City View Cemetery Lane, motorists may experience minor delays while traffic is reduced by a single lane closure in each direction during daylight hours Monday through Friday. Last Updated: 4/27/2016 12:04 AM More Info
From milepost 20 to milepost 22