Return to Map

HIGH IMPACT
I-5 Northbound - DRIVER ALERT: Sunday, Sept. 21 to the morning of Monday, Sept. 22 - The Interurban Avenue on-ramp to northbound I-5 will close nightly from 11:59 p.m. to 5 a.m. for Seattle City Light work. Drivers will follow a signed detour. Last Updated: 9/18/2014 9:41 AM More Info
At milepost 156
HIGH IMPACT
I-5 Both Directions - DRIVER ALERT: Sunday, Sept. 21 to the morning of Monday, Sept. 22 - All lanes of northbound and southbound I-5 between Boeing Access Road South and SR 599 will close from 11:59 p.m. to 5 a.m. for Seattle City Light work. Lanes will begin closing at 9 p.m. with all lanes closed by midnight. Drivers will follow a signed detour. Last Updated: 9/18/2014 9:41 AM More Info
From milepost 156 to milepost 159
HIGH IMPACT
I-90 Eastbound - DRIVER ALERT: Monday, September 8 to the morning Tuesday, September 23 - The eastbound I-90 exit to Bellevue Way Southeast will close 9 p.m. Monday, Sept. 8 continuously for 15 days until the morning of Tuesday, Sept. 23 for drainage, grading, and paving work. Last Updated: 8/27/2014 2:06 PM More Info
At milepost 9
HIGH IMPACT
SR 3 Southbound - Road work on SR 3 southbound at milepost 35.0 near SR 16 beginning at 7:12 pm on September 21, 2014 until about 5:00 am on September 22, 2014. Last Updated: 9/21/2014 7:17 PM More Info
At milepost 35
HIGH IMPACT
SR 16 Eastbound - Road work on SR 16 eastbound at milepost 27.0 near Tremont St beginning at 12:37 am on September 22, 2014 until about 5:00 am. Last Updated: 9/22/2014 12:39 AM More Info
At milepost 27
HIGH IMPACT
SR 20 Both Directions - Following flooding and a lane washout, SR 20 reopened to traffic August 22 with flaggers and pilot car controlled traffic through a short section of roadway reduced to a single lane 4 miles east of the Junction of SR 20 and SR 153, which is halfway between Twisp and Loup Loup summit. Expect delays of 5 to 10 minutes. Last Updated: 9/15/2014 11:33 AM More Info
At milepost 208
HIGH IMPACT
SR 99 Southbound - Crews will close up to two lanes of southbound SR 99 between South Atlantic and South Spokane streets from 10 p.m. Sunday, Sept. 21 to 5 a.m. Monday, Sept. 22. Last Updated: 9/18/2014 11:12 AM More Info
From milepost 30 to milepost 29
HIGH IMPACT
SR 99 Northbound - Crews will close up to two lanes of northbound SR 99 between South Spokane and South Atlantic streets each night from 10 p.m. to 5 a.m. each following morning. Last Updated: 9/18/2014 11:09 AM More Info
From milepost 29 to milepost 31
HIGH IMPACT
SR 153 Both Directions - SR 153 remains closed from milepost 22 at Carlton to milepost 27.63 at Benson Creek (5 miles east of Twisp) due to repair work for the damage done from recent mudslides. There is no estimated time for reopening. There is a detour available using the Twisp Carlton road which runs parallel to the highway for 13 miles. Last Updated: 9/15/2014 2:35 PM More Info
From milepost 22 to milepost 28
HIGH IMPACT
SR 302 Both Directions - Road work on SR 302 both directions at milepost 11.0 near Elgin Clifton Rd Kpn beginning at 10:02 pm on September 21, 2014 until about 6:00 am on September 22, 2014. Last Updated: 9/21/2014 10:04 PM More Info
At milepost 11
HIGH IMPACT
SR 900 Both Directions - Sunday, Sept. 21 to the morning of Monday, Sept. 22 - Both directions of Martin Luther King Jr. Way South/SR 900 between South Boeing Access Road and South 129th Street will close from 11 p.m. to 5 a.m. Drivers will follow a signed detour. Last Updated: 9/18/2014 9:43 AM More Info
From milepost 6 to milepost 8
MODERATE IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08)
Traffic Impacts: Monday, Sept. 22 to Friday, Sept. 26: Daytime and nighttime, single and double-lane closures on both directions of I-5.
Monday, Sept. 22 to Friday, Sept. 26: Daytime traffic is shifted to the left lanes on both directions of I-5, with nighttime, double-lane closures on both directions of I-5. Last Updated: 9/19/2014 11:46 AM More Info
From milepost 20 to milepost 21
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (MP 79.81 to 84.15) Monday, Sept. 22 to Friday, Sept. 26: Nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Around-the-clock, intermittent lane closures with flaggers on Mellen Street and Ellsbury Street, with detours on Ellsbury St. and Marsh Avenue.
Monday, Sept. 22 to Friday, Sept. 26: Nighttime, northbound and southbound on and off-ramp closures on I-5 from Mellen St. from 10 p.m. to 6 a.m. Last Updated: 9/19/2014 11:45 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Southbound - I-5, Southbound, Gee Creek Rest Area Facility Improvements (milepost 12.0)
Traffic Impacts:
Starting Sept 8, there will be around-the-clock, full closure of rest area for facility improvements. Last Updated: 9/12/2014 8:28 AM More Info
At milepost 12
MODERATE IMPACT
I-5 Northbound - Sunday, Sept. 21 to the morning of Monday, Sept. 22 - The left lane of northbound I-5 at Mercer Street will close from 9 p.m. to 5 a.m. for maintenance drilling work. Last Updated: 8/26/2014 1:06 PM More Info
At milepost 167
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 47 to 55: Lane closures Monday night through Saturday both directions 10 p.m. to 9 a.m. Be alert for traffic revisions and lane shifts. Daytime single lane closures Monday through Saturday. Last Updated: 9/20/2014 10:51 AM More Info
From milepost 47 to milepost 55
MODERATE IMPACT
I-90 Both Directions - Rock blasting closures scheduled Monday through Thursday at 6:30 p.m. lasting for one hour or more. During blasts crews will close I-90 eastbound at Gold Creek milepost 56 and westbound at Price Creek milepost 61. There are no services past Exit 53 eastbound or past Exit 70 westbound during blast closures. Last Updated: 9/20/2014 10:43 AM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 56 to 61: Daytime Restrictions: Drivers should prepare for occasional rolling slowdowns both directions, Monday through Friday, during daytime hours.
Nighttime Restrictions: Traffic will be reduced to one lane in both directions, Monday through Friday, during nighttime hours. Last Updated: 9/19/2014 9:05 PM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 61 to 65: Intermittent lane closures Monday through Friday from 10:00 p.m. until 9:00 a.m. the following morning. Last Updated: 9/19/2014 8:59 PM More Info
From milepost 61 to milepost 65
MODERATE IMPACT
I-90 Both Directions - I-90 mileposts 65 to 67: No impacts to traffic this week. Intermittent lane closures Monday through Friday from 10:00 p.m. until 9:00 a.m. the following morning. Last Updated: 9/19/2014 8:59 PM More Info
From milepost 65 to milepost 67
MODERATE IMPACT
US 2 Both Directions - On US 2 east of the Stevens Pass summit, the paving is complete. Monday through Friday, 6 a.m. to 8 p.m., expect lane shifts for shoulder finishing, raising survey monuments, installing guideposts and other work.
Speed is still reduced to 45 and when necessary, bicyclists and pedestrians will continue be bussed around the work zone. Last Updated: 9/19/2014 4:28 PM More Info
From milepost 64 to milepost 72
MODERATE IMPACT
US 97 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23, SR 14 mileposts 100.5 to 102.0)
Monday, Sept. 22 to Thursday, Sept. 25: Daytime, single-lane closures, with flaggers. Last Updated: 9/19/2014 11:53 AM More Info
From milepost 2 to milepost 3
MODERATE IMPACT
SR 9 Both Directions - Friday, September 19 to Monday, September 22 - Both directions of 32nd Street Southeast just west of SR 9 will be closed from 9 p.m. Friday to 5 a.m. Monday for a variety of roadway work. A signed detour will be in place. Last Updated: 9/19/2014 8:12 AM More Info
At milepost 13
MODERATE IMPACT
SR 14 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23 and SR 14 mileposts 100.5 to 102.0)
Traffic Impacts:
Monday, Sept. 22 to Thursday, Sept. 25: Daytime, single-lane closures, with flaggers. Last Updated: 9/19/2014 11:53 AM More Info
From milepost 100 to milepost 102
MODERATE IMPACT
SR 14 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, Sept. 22 to Friday, Sept. 26: Daytime, intermittent, single-lane closures with flaggers on SR 14 at milepost 75 in the vicinity of the Klickitat River. Last Updated: 9/19/2014 11:49 AM More Info
From milepost 67 to milepost 103
MODERATE IMPACT
SR 141 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, Sept. 22 to Friday, Sept. 26: Daytime, intermittent, single-lane closures with flaggers on SR 14 at milepost 75 in the vicinity of the Klickitat River. Last Updated: 9/19/2014 11:52 AM More Info
From milepost 0 to milepost 30
MODERATE IMPACT
US 197 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, Sept. 22 to Friday, Sept. 26: Daytime, intermittent, single-lane closures with flaggers on SR 14 at milepost 75 in the vicinity of the Klickitat River. Last Updated: 9/19/2014 11:51 AM More Info
From milepost 1 to milepost 4
MODERATE IMPACT
SR 508 Both Directions - SR 508 to SR 7 - Paving and Sealing Road improvements (mileposts 0.20 to 32.84)
Traffic Impacts:
Monday, Sept. 22 to Friday, Sept. 26: No scheduled traffic impacts. Last Updated: 9/19/2014 11:54 AM More Info
From milepost 0 to milepost 33
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction
Traffic Impacts:
SR 508 is restricted to vehicles weighing more than seven tons. Trucks and large passenger vehicles should follow posted detour signs: Eastbound drivers, take Leonard Road to US 12. Westbound drivers, take Cinebar Road to Silver Creek Road/SR 122 to US 12. Last Updated: 3/14/2014 10:53 AM More Info
At milepost 14
MODERATE IMPACT
SR 522 Both Directions - **DRIVER ALERT**Tuesday, September 2 to the morning of Wednesday, October 1 - The ramp from SR 522 to eastbound US 2 will be closed around-the-clock from 10 p.m. Tuesday, September 2 to 5 a.m. Wednesday, October 1 for work on the 179th Bridge. Drivers will follow a signed detour. Last Updated: 8/29/2014 10:38 AM More Info
At milepost 25
MODERATE IMPACT
SR 539 Northbound - Wednesday, Sept. 3 to Friday, Sept. 5 – One lane of SR 539 will be closed near the border daily from 7 a.m. to 5 p.m. for pavement work. Flaggers will direct traffic through the work zone. Last Updated: 8/28/2014 1:31 PM More Info
From milepost 15 to milepost 16
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93)
Monday, Sept. 22 to Friday, Sept. 26: Nighttime, single and double-lane closures on both directions of I-5 from NE 99th Street to NE 39th Street. Southbound lanes from 8 p.m. Monday, Sept. 22 to 5 a.m. Friday, Sept. 26, and northbound lanes from 10 p.m. Monday, Sept. 22 to 6 a.m. Friday, Sept. 26. Last Updated: 9/19/2014 11:54 AM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Monday, Sept. 22 to Friday, Sept. 26: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. Last Updated: 9/19/2014 11:48 AM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Sept. 22 to Sunday, Sept. 28: Daytime, intermittent, alternating, single-lane closures and rolling slowdowns on both directions of I-205, from 6 a.m. Monday to 3 p.m. Sunday.
Monday, Sept. 22 to Sunday, Sept. 28: Daytime and nighttime, single-lane closures throughout NE 134th Street and NE 20th Avenue. Last Updated: 9/19/2014 10:16 AM More Info
From milepost 7 to milepost 10
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46)
Traffic Impacts: No scheduled traffic impacts. Last Updated: 9/5/2014 10:10 AM More Info
From milepost 10 to milepost 20
LOW IMPACT
I-90 Both Directions - Bicycle Alternate Route: I-90 is closed to bicycles in both directions between Hyak (Exit 54) and Stampede Pass interchange (exit 62) because there is no shoulder for bicycles to use. Bicyclists can use the John Wayne Pioneer Trail, weather permitting, as an alternate route. Last Updated: 9/20/2014 4:03 AM More Info
From milepost 54 to milepost 62
LOW IMPACT
I-205 Both Directions - Salmon Creek Interchange Project (I-205, MP 36.07 to 36.83 and I-5 MP 6.95 to 9.51) Monday, Sept. 22 to Sunday, Sept. 28: Daytime, intermittent, alternating, single-lane closures and rolling slowdowns on both directions of I-205, from 6 a.m. Monday to 3 p.m. Sunday.
Monday, Sept. 22 to Sunday, Sept. 28: Daytime and nighttime, single-lane closures throughout NE 134th Street and NE 20th Avenue. Last Updated: 9/19/2014 11:05 AM More Info
From milepost 36 to milepost 38
LOW IMPACT
US 101 Both Directions - US 101 - Middle Nemah River Bridge Replacement (mileposts 33.04 to 33.99)
Traffic Impacts:
Monday, Sept, 22 to Wednesday, Sept. 24: Daytime, intermittent, single-lane closures for roadside maintenance. Last Updated: 9/19/2014 11:41 AM More Info
From milepost 33 to milepost 34
LOW IMPACT
US 101 Both Directions - US 101, Astoria Megler Bridge Painting Project (milepost 0.00 to 0.72) – ODOT

A 35 mph speed limit through the construction zone will be maintained for the duration of the project. Expect single-lane traffic and 20-minute delays anytime on weekdays and weekends. Last Updated: 1/19/2012 11:49 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 4 Both Directions - SR 4, Ocean Beach Highway Sanitary Sewer Replacement (mileposts 60.3 to 60.8)
Monday, Sept. 22 to Friday, Sept. 26: Nighttime, single-lane traffic on Ocean Beach Highway between Washington Way and 15th Avenue. Intermittent closures of business driveways for equipment staging. Last Updated: 9/19/2014 11:49 AM More Info
From milepost 60 to milepost 61
LOW IMPACT
SR 6 Both Directions - SR 6, Willapa River Bridge - Bridge Replacement (mileposts 6.86 to 7.26)
Monday, Sept. 22 to Friday, Sept. 26: No scheduled traffic impacts. Last Updated: 9/19/2014 11:44 AM More Info
From milepost 7 to milepost 8
LOW IMPACT
SR 14 Both Directions - SR 14 at Bridge of the Gods (milepost 41.6)
Drivers crossing the Bridge of the Gods should expect intermittent delays of up to 20 minutes. Last Updated: 4/4/2014 1:34 PM More Info
At milepost 42
LOW IMPACT
SR 105 Both Directions - SR 105, Smith Creek and North River - Bridge Replacements (mileposts 6.25 to 13.65)
Traffic Impacts:
Monday, Sept. 22 to Friday, Sept. 26: No scheduled traffic impacts. Last Updated: 9/19/2014 11:07 AM More Info
From milepost 6 to milepost 14
LOW IMPACT
SR 410 Both Directions - SR 410 mileposts 69 to 71, east of Chinook Pass summit: Monday, Sept. 22 through Thursday, Sept. 25, 7 a.m. to 5:30 p.m., motorists can expect 30 minute delays. No work is scheduled Friday through Sunday. Motorist can access US 12 and SR 123 as alternate routes. Last Updated: 9/19/2014 8:57 PM More Info
From milepost 69 to milepost 71
LOW IMPACT
SR 411 Both Directions - SR 411, City of Kelso - West Main Street Realignment (mileposts 1.50 to 1.75)
Traffic Impacts: No scheduled traffic impacts.
NOTE: Access on SR 411 between Washington and Grant is now open to through-traffic. The intersection of SR 411 and Main Street/Allen Street is controlled by a four-way stop. Last Updated: 9/12/2014 8:52 AM More Info
From milepost 2 to milepost 2
LOW IMPACT
SR 411 Both Directions - SR 411, City of Castle Rock - Front Avenue Improvement (mileposts 12.6 to 13.2)
Traffic Impacts:
No scheduled traffic impacts. Last Updated: 12/20/2013 8:44 AM More Info
From milepost 13 to milepost 14
LOW IMPACT
SR 433 Both Directions - SR 433 at the Lewis and Clark Bridge (milepost 0.0)
Traffic Impacts:
No Scheduled traffic impacts. Last Updated: 8/29/2014 8:55 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 502 Both Directions - SR 502 Widening from I-5 to Battle Ground (MP 0.59 to 6.61) Monday, Sept. 22 to Friday, Sept. 26: Multiple, daytime, intermittent, single-lane closures with flaggers, throughout the 6 mile length of the project limits, from 9 a.m. to 3 p.m. daily.
Monday, Sept. 22: Multiple, intermittent, nighttime, single-lane closures with flaggers between NE 50th Ave. and NE 72nd Ave. from 6:30 p.m. to 6 a.m. Last Updated: 9/19/2014 11:48 AM More Info
From milepost 1 to milepost 7
LOW IMPACT
SR 504 Both Directions - SR 504, Both directions between Hummocks Trail east to Loowit viewpoint (mileposts 45.0 to 52.0)
SR 504 has been closed for the winter season starting Saturday, Nov. 16. Last Updated: 11/22/2013 2:34 PM More Info
From milepost 45 to milepost 52
LOW IMPACT
SR 507 Both Directions - SR 507, Yew Street Intersection Improvements (mileposts 0.22 to 0.32)
Traffic Impacts:
Monday, Sept. 22 to Thursday, Sept. 25: Daytime, and nighttime, single-lane closures, with flaggers. Traffic shifts will be necessary during daylight hours. Last Updated: 9/19/2014 11:56 AM More Info
From milepost 0 to milepost 1
LOWEST IMPACT
I-5 Northbound - I-5, Northbound, between SR 14 and Main Street(mileposts 0.27 to 2.80)
Monday, Sept. 22 to Friday, Sept. 26: Daytime, shoulder closures for roadside maintenance, on I-5 northbound. Last Updated: 9/19/2014 12:02 PM More Info
From milepost 0 to milepost 3
LOWEST IMPACT
I-90 Westbound - Maintenance/Utility Operations: I-90 westbound milepost 50, Denny Creek Bridge: Monday, Sept. 22 through Thursday, Sept. 25, from 7:30 a.m. to 4 p.m. the right lane will be closed for bridge maintenance. Last Updated: 9/20/2014 10:52 AM More Info
At milepost 50
LOWEST IMPACT
I-182 Both Directions - Maintenance/Utility Operations: I-182 milepost 5, Richland: Monday, Sept. 22 from 9 a.m. to 3 p.m. the ramp from George Washington Way to I-182 westbound will be closed for pavement repair. The right lane from George Washington way to I-182 eastbound will also be closed. Last Updated: 9/20/2014 4:08 AM More Info
At milepost 3
LOWEST IMPACT
US 12 Both Directions - Maintenance/Utility Operations:
US 12 milepost 143: Monday, Sept. 22 through Wednesday, Sept. 24, during daylight hours, expect single lane closures for utility crew work on the bridge. Last Updated: 9/20/2014 11:34 PM More Info
At milepost 143
LOWEST IMPACT
US 12 Northbound - Clear Creek Falls Viewpoint – Rock fall Mesh Repair
US 12 – Milepost 154.42 to Milepost 154.45
Current Week Traffic Advisory: Friday, Sept. 19 through Wednesday, Sept. 24, and Saturday, Sept. 27, 7 a.m. to 5:30 p.m., motorist can expect 30 minute delays Last Updated: 9/20/2014 4:17 AM More Info
At milepost 154
LOWEST IMPACT
US 97 Both Directions - US 97, Biggs Rapid Bridge Painting (mileposts 0.25 to 0.49)
Traffic Impacts:
Saturday, Sept. 20 to Friday, Sept. 26: Occasional, nighttime, intermittent, single-lane closures on bridge with automated flagging device. Last Updated: 9/19/2014 11:59 AM More Info
From milepost 0 to milepost 1
LOWEST IMPACT
SR 4 Both Directions - SR 4, Both directions, between River View East and County Line Park (mileposts 40.0 to 42.0)
Monday, Sept. 25: Daytime, single-lane closures for roadside maintenance. Last Updated: 9/19/2014 12:10 PM More Info
From milepost 40 to milepost 42
LOWEST IMPACT
SR 4 Both Directions - SR 4, Both directions, between Roseburg Cemetery Road and Logging Road (mileposts 15.01 to 22.28)
Monday, Sept. 22 to Friday, Sept. 26: Daytime, single-lane closures for roadside maintenance. Last Updated: 9/19/2014 12:09 PM More Info
From milepost 15 to milepost 23
LOWEST IMPACT
SR 6 Both Directions - SR 6, Rock Creek East and West Bridges - Replacement (mileposts 25.95 to 26.94)
Traffic Impacts:
Monday, Sept. 22 to Saturday, Sept. 27: Daytime, intermittent, single-lane closures with flaggers from 6 a.m. Monday to 4:30 p.m. Saturday. Last Updated: 9/19/2014 11:47 AM More Info
From milepost 26 to milepost 27
LOWEST IMPACT
SR 125 Southbound - Maintenance/Utility Operations:
SR 125 southbound milepost 2 to 5: Monday, Sept. 22 through Thursday, Sept. 25 from 7 a.m. to 3 p.m. traffic will be reduced to one lane for pavement repair. Last Updated: 9/20/2014 11:34 PM More Info
From milepost 2 to milepost 5
LOWEST IMPACT
SR 141 Both Directions - SR 141, White Salmon River Bridge Painting (mileposts 8.70 to 8.72)
Traffic Impacts:
Saturday, Sept. 20 to Friday, Sept. 26: Daytime single-lane traffic on bridge controlled by traffic-actuated signals for the duration of the project. Last Updated: 9/19/2014 12:00 PM More Info
From milepost 9 to milepost 9
LOWEST IMPACT
SR 411 Both Directions - SR 411, Slope Repair Vicinity of Hazel Dell Road (mileposts 6.0 to 6.30)
Traffic Impacts:
Monday, Sept. 22 to Friday, Sept. 26: Daytime, single-lane and shoulder closures, with flaggers on SR 411, from 8 a.m. to 3:30 p.m. daily. Last Updated: 9/19/2014 12:00 PM More Info
From milepost 6 to milepost 7
LOWEST IMPACT
SR 411 Both Directions - SR 411 - Huntington Avenue Sidewalk Improvements (mileposts 12.46 to 12.7)
Traffic Impacts: No scheduled traffic impacts. Last Updated: 9/12/2014 9:38 AM More Info
From milepost 12 to milepost 13
LOWEST IMPACT
SR 503 Both Directions - SR 503, Both directions, between Rudy Ross Road and McCracken Road (milepost 51.09 to 51.21)
Monday, Sept. 22 to Friday, Sept. 26: Daytime, single-lane and shoulder closures, with pilot car, for roadside maintenance. Last Updated: 9/19/2014 12:03 PM More Info
From milepost 51 to milepost 52
LOWEST IMPACT
SR 505 Eastbound - SR 505, Eastbound, between Second Street and Cedar Creek Road (milepost 6.77 to 13.69)
Monday, Sept. 22 to Friday, Sept. 26: Daytime, single-lane closures with plowing operations. Last Updated: 9/19/2014 12:08 PM More Info
From milepost 7 to milepost 14