HIGH IMPACT
I-5 Northbound -
Maintenance on I-5 northbound at Milepost 115 near Nisqually beginning at 4:55 am on May 19, 2013 until approximately 10:00 am. The right lane is closed. Last Updated: 5/19/2013 4:57 AM
More InfoAt milepost 115
HIGH IMPACT
I-5 Southbound -
The southbound I-5 exit to S. 38th Street in Tacoma (Exit #132A) is closed through July. Motorists are detoured via the S. 56th Street interchange at Exit #130, onto northbound I-5 and to the northbound I-5 exit to S. 38th Street. Expect delays, especially during a.m. and p.m. peak travel periods. Last Updated: 4/23/2013 5:31 AM
More InfoAt milepost 132
HIGH IMPACT
SR 16 Both Directions -
Eastbound Nalley Valley project-related work requires periodic lane and shoulder closures in both directions of SR 16, as well as on Sprague Avenue, South Tacoma Way and Center, and Union streets weekdays and weeknights. Last Updated: 8/13/2012 2:01 PM
More InfoFrom milepost 0 to milepost 1
HIGH IMPACT
SR 28 Both Directions -
The detours around the construction of the new concrete intersection at Grant Rd. and SR 28 are in effect until May 24. Northbound traffic on SR 28 is shifted to the west side of the highway, Southbound traffic is detoured onto the bypass and Grant Road traffic is detoured. Last Updated: 5/17/2013 3:50 PM
More InfoFrom milepost 0 to milepost 1
HIGH IMPACT
SR 99 Both Directions -
Friday, May 17 to the morning of Monday, May 20 – Both directions of SR 99 will be closed between Valley Street and Western Avenue around the clock from 11 p.m. Friday until 5 a.m. Monday for construction work. Last Updated: 5/14/2013 7:54 AM
More InfoFrom milepost 33 to milepost 32
HIGH IMPACT
SR 520 Both Directions -
The annual Beat the Bridge event will close the left turn lane on the eastbound SR 520 exit ramp to Montlake Blvd and the westbound SR 520 exit ramp to Montlake Blvd on Sunday, May 19 2013, from 8:00 AM to 10:00 AM. Southbound Montlake Blvd/SR 513 will be closed from the vicinity of Hec Edmundson Pavilion to E Roanoke St. Northbound Montlake Blvd will remain open to NE Pacific St, where traffic will be detoured onto NE Pacific St. Last Updated: 5/17/2013 9:01 AM
More InfoAt milepost 1
MODERATE IMPACT
I-5 Both Directions -
Construction: I-5, Blakeslee Junction to Grand Mound
No scheduled traffic impacts. Last Updated: 5/17/2013 10:35 AM
More InfoFrom milepost 84 to milepost 88
MODERATE IMPACT
I-5 Both Directions -
I-5, Mellen Street to Blakeslee Junction - Stage 1 (mileposts 80.83 to 84.15)
Traffic impacts:
Monday, May 20 to Friday, May 24: Nighttime single lane closures on both directions of I-5. Last Updated: 5/17/2013 10:35 AM
More InfoFrom milepost 81 to milepost 85
MODERATE IMPACT
I-5 Both Directions -
I-5, Barnes Road and US 12 Interchanges - Illumination Upgrades (mileposts 52.33 to 68.41)
Traffic Impacts:
Monday, May 20 to Friday, May 24: Daytime single lane and shoulder closures within project limits. Last Updated: 5/17/2013 10:34 AM
More InfoFrom milepost 52 to milepost 69
MODERATE IMPACT
I-90 Both Directions -
Snoqualmie Pass: Rock blasting operations are completed for this week. During operations crews will close I-90 in both directions from Gold Creek (milepost 56) to Price Creek (milepost 61). Last Updated: 5/16/2013 8:42 PM
More InfoFrom milepost 56 to milepost 61
MODERATE IMPACT
I-90 Westbound -
A closure for maintenance activities, is planned for early Sunday, May 19th. Beginning 8:00 A.M. Crews will close westbound I-90 near Snoqualmie pass summit, at milepost 52. This closure will affect the westbound direction only and is estimated to last 30 minutes, to 1 hour. Last Updated: 5/16/2013 4:05 PM
More InfoAt milepost 52
MODERATE IMPACT
I-90 Both Directions -
I-90 Easton to Ellensburg Vicinity:
Drivers may experience delays due to single lane closures in both directions Monday through Thursday during the day near Easton from milepost 71 to milepost 76. Westbound daytime lane closures may also be encountered Monday through Thursday during daylight hours from milepost 103 to 106. Last Updated: 5/16/2013 8:54 AM
More InfoFrom milepost 70 to milepost 110
MODERATE IMPACT
I-90 Both Directions -
Snoqualmie Pass: Daytime Restrictions: Drivers should prepare for intermittent rolling slowdowns Monday through Friday in both directions. Nighttime Restrictions: Intermittent nighttime single-lane closures are planned Monday through Friday nights in both directions. For freight-related restrictions, please visit the Commercial Vehicle Services Road Restrictions Web page:
www.wsdot.wa.gov/commercialVehicle/Restrictions/roadlist.aspx Last Updated: 5/16/2013 5:48 AM
More InfoFrom milepost 54 to milepost 61
MODERATE IMPACT
I-405 Southbound -
Saturday, May 18 to the morning of Sunday, May 19 – Crews will close up to three lanes of southbound I-405 between Northeast 85th Street and Northeast 70th Street starting at 8 p.m. All lanes will reopen by 9 a.m. Last Updated: 5/16/2013 10:30 AM
More InfoFrom milepost 18 to milepost 18
MODERATE IMPACT
I-405 Southbound -
Saturday, May 18 to the morning of Sunday, May 19 – Crews will close the Northeast 85th Street on-ramp to southbound I-405 from 10 p.m. to 8 a.m. Last Updated: 5/16/2013 8:16 AM
More InfoAt milepost 18
MODERATE IMPACT
I-405 Southbound -
Saturday, May 18 to the morning of Sunday, May 19 – Crews will close the southbound I-405 off-ramp to Northeast 85th Street from 9 p.m. to 8 a.m. Last Updated: 5/16/2013 8:16 AM
More InfoAt milepost 18
MODERATE IMPACT
US 2 Both Directions -
For a slope stabilization project, both the eastbound lanes are closed a mile west of the Stevens Pass summit from Big Windy for a mile further west to Old Faithful with traffic shifted to the the two westbound lanes and reduced to one lane in each direction, until this fall. Accommodations for bicycles are included. Last Updated: 5/17/2013 3:44 PM
More InfoFrom milepost 61 to milepost 64
MODERATE IMPACT
US 97 Both Directions -
Construction: US 97, North of Goldendale - Wildlife Habitat Connectivity (mileposts 21.05 to 21.72)
Traffic impacts:
Monday, May 20 to Friday, May 24: Daytime shoulder closures. Construction vehicles will be entering and exiting the workzone during daylight hours. Motorists are advised to use caution. Last Updated: 5/17/2013 10:33 AM
More InfoFrom milepost 21 to milepost 22
MODERATE IMPACT
US 101 Both Directions -
US 101 - Commercial Street Signal Replacement (mileposts 58.58 to 58.81)
Traffic Impacts:
Monday, May 20 to Thursday, May 23: Daytime single lane and shoulder closures within project limits. Last Updated: 5/17/2013 10:36 AM
More InfoFrom milepost 59 to milepost 59
MODERATE IMPACT
US 101 Both Directions -
US 101 - Middle Nemah River Bridge Replacement (mileposts 33.04 to 33.99)
Traffic Impacts:
Monday, May 20 to Friday, May 24: Daytime single lane and shoulder closures within project limits during daylight hours. Last Updated: 5/17/2013 10:35 AM
More InfoFrom milepost 33 to milepost 34
MODERATE IMPACT
US 395 Both Directions -
US 395, milepost 17.5 to 20, over the Blue Bridge, on Tuesday, May 21 WSDOT crews will close the on ramp from Lewis Street and the right lane on Southbound US 395. Then on Wednesday, May 22, crews will close the on ramp from Columbia Drive and the right lane on Northbound US 395 for overhead light replacements. Hours of operations for both days are from 9 a.m. to 3 p.m. Watch for signs, cones and portable message boards. Last Updated: 5/16/2013 8:14 AM
More InfoFrom milepost 18 to milepost 20
MODERATE IMPACT
SR 14 Both Directions -
SR 14, Marble Road Safety Improvements (mileposts 22.60 to 23.70)
Traffic Impacts:
Monday, May 20 to Friday, May 24: Daytime intermittent single lane closures with flaggers within project limits. Last Updated: 5/17/2013 10:37 AM
More InfoFrom milepost 23 to milepost 24
MODERATE IMPACT
SR 14 Both Directions -
SR 14, Camas-Washougal Widening and Interchange (mileposts 11.93 to 15.54)
Monday, May 20 to Friday, May 24: Daytime single lane closures on both directions of SR 14. Nighttime single lane closures on the west end of project limits, including the West Camas Slough Bridge. Nighttime signed intermittent ramp closures throughout the project area. Last Updated: 5/17/2013 10:28 AM
More InfoFrom milepost 12 to milepost 16
MODERATE IMPACT
SR 26 Both Directions -
Monday through Friday-Days, 7 a.m. to 4 p.m., expect lane shifts and occasionally, flaggers, directing traffic where crews are working on sidewalks on Columbia and Wahluke Streets and electrical crews are working along First St.
Monday through Thursday-Nights, 6 p.m. to 6 a.m., expect lane shifts and closures on Columbia and Wahluke Streets as crews grind old asphalt off and then pave it back. Last Updated: 5/17/2013 3:51 PM
More InfoFrom milepost 41 to milepost 41
MODERATE IMPACT
SR 99 Northbound -
On SR 99 northbound from Western Ave (MP 32) to Valley St (MP 33) all lanes are closed due to roadwork. Last Updated: 5/18/2013 12:19 AM
More InfoFrom milepost 32 to milepost 33
MODERATE IMPACT
SR 99 Southbound -
On SR 99 southbound from Valley St (MP 33) to Battery St (MP 32) all lanes are closed due to roadwork. Last Updated: 5/18/2013 12:18 AM
More InfoFrom milepost 33 to milepost 33
MODERATE IMPACT
SR 99 Both Directions -
On SR 99 northbound & southbound from Harrison St (MP 33) to Roy St (MP 33) the right lane northbound and the ramp southbound are closed due to roadwork. Last Updated: 5/17/2013 2:20 PM
More InfoFrom milepost 32 to milepost 33
MODERATE IMPACT
SR 105 Both Directions -
SR 105, Smith Creek and North River - Bridge Replacements (mileposts 16.25 to 13.65)
Traffic Impacts:
Monday, May 20 to Friday, May 24: Daytime single lane and shoulder closures with flaggers throughout the project area.
NOTE: Traffic will be reduced to a single lane with a temporary signal control across the Smith Creek Bridge 24 hours-per-day. The speed limit has been reduced to 25 mph within project limits. Last Updated: 5/17/2013 10:36 AM
More InfoFrom milepost 16 to milepost 14
MODERATE IMPACT
SR 169 Both Directions -
Uniformed Police Officers will intermittently control both directions of traffic on SR 169 at the SE 416th St intersection on Sunday, May 19, 2013, for the annual Mutual of Enumclaw Ride Event. This traffic control will take place between 8:00 AM and 5:00 PM. Last Updated: 5/17/2013 3:35 PM
More InfoAt milepost 2
MODERATE IMPACT
SR 285 Northbound -
Monday through Thursday-DAYS, 6 a.m. to 5 p.m.: expect no traffic impacts. Crews continue to work on the bridges, driveways and sidewalks on Ferry St. from Wenatchee Ave. to Mission St. Permanent stop and street signs are being installed.
Monday -Thursday NIGHTS, 9 p.m. to 6 a.m., expect only occasional lane shifts and minimal delays where crews are raising utility covers and also completing work in the merge area from the loop ramp to the bridge that's being widened. Last Updated: 5/17/2013 4:00 PM
More InfoFrom milepost 1 to milepost 0
MODERATE IMPACT
SR 410 Both Directions -
Uniformed police officers will intermittently contol both directions of SR 410 traffic on Sunday, May 19, 2013 at the intersections of 284th Ave SE/Farman SR NE and Mud Mountain Dam Rd for the annual Mutual of Enumclaw Ride Event. This traffic control will take place between 8:00 AM and 5:00 PM. Last Updated: 5/17/2013 3:38 PM
More InfoFrom milepost 26 to milepost 30
MODERATE IMPACT
SR 500 Both Directions -
SR 500, St. Johns Blvd. Interchange (mileposts 0.42 to 1.55)
Monday, May 20 to Friday, May 24: Daytime single lane and shoulder closures on both directions of St. Johns Boulevard and the on- and off-ramps. Daytime single lane closures on 39th, 42nd and 44th Streets. Trucks entering and exiting the work zone. Last Updated: 5/17/2013 10:29 AM
More InfoFrom milepost 0 to milepost 2
MODERATE IMPACT
SR 501 Both Directions -
SR 501, Pioneer Street Reconstruction - Port of Ridgefield (milepost 16.91)
Traffic Impacts:
Monday, May 20 to Friday, May 24: Daytime single lane traffic at the intersection of SR 501 and Main Avenue. Last Updated: 5/17/2013 10:30 AM
More InfoAt milepost 17
MODERATE IMPACT
SR 502 Both Directions -
SR 502, Widening from I-5 to Battle Ground, Stage 1 (mileposts 2.29 to 6.61)
Traffic Impacts:
No scheduled traffic impacts. Last Updated: 12/27/2012 2:54 PM
More InfoFrom milepost 2 to milepost 7
MODERATE IMPACT
SR 503 Both Directions -
SR 503, Widening Work - City of Woodland
Traffic Impacts:
Monday, May 20 to Thursday, May 23: Daytime single lane traffic and minor delays between Fir Street and Insel Road. Last Updated: 5/17/2013 10:33 AM
More InfoFrom milepost 53 to milepost 54
MODERATE IMPACT
SR 503 Both Directions -
SR 503, NE 65th Street to Padden Parkway - Median Curb Installation (mileposts 0.17 to 1.04)
Traffic Impacts:
Monday, May 20 to Tuesday, May 21: Daytime shoulder closures and sidewalk closures within project limits.
Wednesday, May 22 to Thursday, May 23: Nighttime single and left-turn-lane closures on both directions of SR 503 between 65th and 71st Streets. No left turns will be permitted. Last Updated: 5/17/2013 10:32 AM
More InfoFrom milepost 0 to milepost 2
MODERATE IMPACT
SR 508 Both Directions -
SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction
Traffic Impacts:
SR 508 is restricted to vehicles weighing more than seven tons. Trucks and large passenger vehicles should follow posted detour signs: Eastbound drivers, take Leonard Road to US 12. Westbound drivers, take Cinebar Road to Silver Creek Road/SR 122 to US 12. Last Updated: 7/6/2012 9:28 AM
More InfoAt milepost 14
LOW IMPACT
I-5 Both Directions -
Salmon Creek Interchange Project (I-205, mile posts 36.07 to 36.83 and I-5 mile posts 6.95 to 9.51
Monday, May 20 to Thursday, May 23: Daytime shoulder closures and rolling slowdowns on both directions of I-5 and I-205 within project limits. Daytime single lane closures on I-205 southbound and NE 16th Avenue from 7 a.m. to 3:30 p.m.
NOTE: Access to NE 17th Avenue at NE 139th is now permanently closed. Last Updated: 5/17/2013 10:25 AM
More InfoFrom milepost 7 to milepost 10
LOW IMPACT
I-5 Both Directions -
I-5, E. Fork Lewis River Bridge to Todd Road - Paving / Safety (I-5 mileposts 18.37 to 26.47, SR 503, mileposts 54.24 to 54.38)
Traffic Impacts:
No scheduled traffic impacts. Last Updated: 12/27/2012 2:55 PM
More InfoFrom milepost 18 to milepost 27
LOW IMPACT
I-5 Both Directions -
I-5, SR 501 Ridgefield Interchange
• No scheduled traffic impacts.
Traffic has been shifted to the new roundabout at the intersection of Pioneer and 65th Avenue. Last Updated: 12/14/2012 12:09 PM
More InfoAt milepost 14
LOW IMPACT
I-205 Both Directions -
Salmon Creek Interchange Project (I-205, mileposts 36.07 to 36.83 and I-5 mileposts 6.95 to 9.51)
Monday, May 20 to Thursday, May 23: Daytime shoulder closures and rolling slowdowns on both directions of I-5 and I-205 within project limits. Daytime single lane closures on I-205 southbound and NE 16th Avenue from 7 a.m. to 3:30 p.m.
NOTE: Access to NE 17th Avenue at NE 139th is now permanently closed. Last Updated: 5/17/2013 10:24 AM
More InfoFrom milepost 36 to milepost 38
LOW IMPACT
US 12 Both Directions -
US 12 White Pass slope stabilization: Milepost 154 and milepost 165, Drivers can expect lane closures Sunday through Thursday during day light hours. Delays up to 30 minutes may be encountered at either location. Last Updated: 5/16/2013 8:56 AM
More InfoFrom milepost 154 to milepost 165
LOW IMPACT
US 97 Both Directions -
Monday through Thursday, 7 a.m. to 5 p.m., expect two - way traffic to be maintained, by shifting lanes to the west side of the highway while crews build the new passing lane on the east side. Last Updated: 5/17/2013 3:53 PM
More InfoFrom milepost 300 to milepost 302
LOW IMPACT
US 97 Both Directions -
US 97 milepost 46: Traffic will be reduced to single-lane alternating traffic. Pilot car will escort drivers through the 35 mph work zone. Drivers can expect delays up to 20 minutes as crews work seven days a week, both day and night. Last Updated: 5/16/2013 5:52 AM
More InfoFrom milepost 44 to milepost 47
LOW IMPACT
US 101 Both Directions -
US 101 Bone River Bridge Replacement Project (mileposts 41.7 to 45.32)
Traffic impacts:
Traffic is reduced to a single, alternating lane with a temporary traffic signal.
NOTE: The speed limit on US 101 through the project area is temporarily reduced to 25 mph. Last Updated: 5/17/2013 10:35 AM
More InfoFrom milepost 42 to milepost 46
LOW IMPACT
US 101 Both Directions -
US 101, Astoria Megler Bridge Painting Project (milepost 0.00 to 0.72) – ODOT
A 35 mph speed limit through the construction zone will be maintained for the duration of the project. Expect single-lane traffic and 20-minute delays anytime on weekdays and weekends. Last Updated: 1/19/2012 11:49 AM
More InfoFrom milepost 0 to milepost 1
LOW IMPACT
US 195 Both Directions -
One lane only, northbound US 195 at Cheney-Spokane Rd. just south of I-90, from April 10, 2013 until further notice, for bridge work. No left turns to Cheney-Spokane from 195. Last Updated: 4/12/2013 3:51 PM
More InfoAt milepost 94
LOW IMPACT
US 730 Both Directions -
US 730: MP 0 to MP 6: Monday through Friday, during daylight hours there will be intermittent lane closures with traffic piloted through the construction zone. Drivers can expect delays. Last Updated: 5/16/2013 5:49 AM
More InfoFrom milepost 6 to milepost 1
LOW IMPACT
SR 142 Both Directions -
SR 142, Both directions on the Klickitat River Bridge (mileposts 17.0 to 18.0)
The bridge reopened on June 28, 2012. Drivers should expect single-lane traffic and a reduced speed limit of 25 mph.
Vehicles more than nine feet wide will not be able to cross the bridge. Overwidth vehicles should use US 97 and SR 14 as a detour. Last Updated: 6/29/2012 8:22 AM
More InfoAt milepost 18
LOW IMPACT
SR 433 Both Directions -
SR 433 at the Lewis and Clark Bridge (milepost 0.0)
Monday, May 20 to Friday, May 24: Daytime lane shifts with up to 10-minute delays. Nighttime single lane closures with up to 10-minute delays. Last Updated: 5/17/2013 10:33 AM
More InfoFrom milepost 0 to milepost 1
LOW IMPACT
SR 433 Both Directions -
Construction on SR 433 at the Lewis and Clark Bridge (milepost 0)
SR 433, Lewis and Clark Bridge Painter
No scheduled traffic impacts. Last Updated: 1/4/2013 2:25 PM
More InfoFrom milepost 0 to milepost 1
LOWEST IMPACT
I-82 Both Directions -
I-82, milepost 23.5 to 24.7, over the Fred Redmond Bridge, on Tuesday, May 21 and Wednesday, May 22, there will left lane closures for bridge inspection work. On Tuesday the left lane Eastbound will be closed and on Wednesday the Westbound left lane will be closed. Hours of operations are 7:00 a.m. to 3:00 p.m. Watch for signs, cones and portable message boards. Last Updated: 5/16/2013 7:26 AM
More InfoFrom milepost 24 to milepost 25
LOWEST IMPACT
US 97 Both Directions -
US 97 milepost 70, W. Wapato Road to milepost 75, Lateral A Road, Tuesday through Friday, during daylight hours there will be intermittent single lane closures through the work zone. Last Updated: 5/16/2013 5:47 AM
More InfoFrom milepost 62 to milepost 63