Return to Map

HIGH IMPACT
I-5 Northbound - Maintenance on I-5 northbound at milepost 109.0 near Martin Way beginning at 5:00 pm on August 2, 2015 for about the next 60 minutes. Last Updated: 8/2/2015 5:04 PM More Info
At milepost 109
HIGH IMPACT
I-5 Northbound - Heavy traffic is causing backups and possible delays on I-5 northbound from milepost 103.0 near Trosper Rd to milepost 109.0 near Martin Way beginning at 4:12 pm on August 2, 2015 until further notice. Last Updated: 8/2/2015 4:20 PM More Info
From milepost 103 to milepost 109
HIGH IMPACT
I-5 Both Directions - Sunday, Aug. 2 – Seafair Weekend festivities that begin at 7:30 a.m. at Genesee Park and Playfield and Lake Washington will cause additional congestion on highways leading into Seattle, including I-5, I-90, SR 520 and SR 99. Last Updated: 7/27/2015 12:54 PM More Info
From milepost 162 to milepost 174
HIGH IMPACT
US 101 Both Directions - Road work on US 101 both directions at milepost 72.5 near Rock Crusher Hill beginning at 2:30 pm on July 6, 2015 until further notice. Reduced to a single lane, alternating traffic in effect. Last Updated: 7/15/2015 6:57 PM More Info
At milepost 72
HIGH IMPACT
SR 164 Both Directions - Sunday, Aug. 2 – A Fall Out Boy concert that begins at 7 p.m. at the White River Amphitheatre will cause additional congestion on SR 164. Last Updated: 7/27/2015 4:10 PM More Info
From milepost 0 to milepost 15
HIGH IMPACT
SR 167 Both Directions - 8 p.m. Friday, Aug. 7, through 5 a.m. Monday, Aug. 10. – Both northbound and southbound SR 167 Puyallup River Bridges (Meridian) in Puyallup will close. Drivers are advised to plan trips in advance and expect heavy congestion while the closures are underway. Signed detours will be provided. Last Updated: 7/30/2015 1:16 PM More Info
From milepost 5 to milepost 6
MODERATE IMPACT
I-5 Northbound - I-5: Clark County - Discovery Corridor Wastewater Transmission System (milepost 10.75) Traffic impacts:
Saturday, July 25 to the morning of Sunday, July 26: One lane of northbound I-5 will be closed between SR 501 near Ridgefield and SR 502 near Battle Ground, from 8 p.m. to 5 a.m., for concrete barrier moving. Last Updated: 7/24/2015 1:26 PM More Info
At milepost 11
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass rock blasting closures are schedules Monday, Wednesday, and Thursday starting at 8 p.m. and lasting for one hour or more. During blasting closures, crews will close I-90 in both directions between Gold Creek (milepost 56) to Price Creek (milepost 61). During closures, there are no services eastbound past milepost 53, near the summit, and westbound past milepost 70, near Easton. Last Updated: 8/1/2015 8:26 PM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 62 to 69: Eastbound travelers will encounter night time lane closures and traffic revisions Monday, August 3 through Friday, August 7. Minimal delays are expected. Westbound traffic will be reduced to a single lane 24 hours a day starting at 8 p.m. Monday, August 3 until 9 a.m. Friday, August 7, between mileposts 59 to 60. Drivers should plan for delays. Last Updated: 8/1/2015 8:22 PM More Info
From milepost 62 to milepost 69
MODERATE IMPACT
I-90 Both Directions - Friday, July 31 - The I-90 express lanes will close at 11:50 a.m. for the Seafair Air Show. The lanes will reopen eastbound by 3 p.m. Last Updated: 7/21/2015 12:01 PM More Info
From milepost 2 to milepost 10
MODERATE IMPACT
US 2 Eastbound - On US 2 at Rayrock Springs (near the Knife shop) Monday through Thursday, 7 a.m. to 7 p.m., expect the eastbound outside lane to be closed and traffic shifted to the center lane while the Yakama Nation restores fish habitat in Nason Creek. Last Updated: 7/10/2015 10:16 AM More Info
From milepost 78 to milepost 79
MODERATE IMPACT
US 195 Both Directions - Intermittent lane closures in Spokane on US 195 in both directions from Interstate 90 to Excelsior road, for road work, until further notice. Last Updated: 7/14/2015 7:10 AM More Info
From milepost 96 to milepost 89
MODERATE IMPACT
US 195 Both Directions - Asphalt paving project underway. Expect delays. Most work will be scheduled during evening and overnight hours. Last Updated: 6/17/2015 1:17 PM More Info
From milepost 37 to milepost 45
MODERATE IMPACT
SR 4 Both Directions - SR 4 - 3.1 Miles East of US 101 - Culvert Rehabilitation (milepost 3.1) Traffic impacts: A temporary bypass road is now open on both directions of SR 4. Drivers will follow a marked detour route along Youth Camp Road. Last Updated: 4/24/2015 11:46 AM More Info
At milepost 3
MODERATE IMPACT
SR 9 Northbound - Monday, July 20 to September 25 - Both directions of SR 9 at Lake Creek will be closed from 7 a.m. Monday, July 20 until late September for culvert replacement and bridge construction. A detour will be in place. Last Updated: 7/13/2015 10:18 AM More Info
From milepost 42 to milepost 43
MODERATE IMPACT
SR 21 Both Directions - One lane alternating traffic for roadwork on SR 21 at milepost 136, near Bear Creek Campground, from 1:55 pm on May 21, 2015 until further notice. Expect delays. Last Updated: 5/21/2015 1:56 PM More Info
At milepost 136
MODERATE IMPACT
SR 28 Both Directions - On SR 28, west of Quincy, Wednesday & Thursday 6 a.m. to 8 p.m., expect up to 20 minute delays with flaggers and a pilot car as crews spray liquid asphalt to seal the new roadway surface. Last Updated: 7/31/2015 11:31 AM More Info
From milepost 19 to milepost 28
MODERATE IMPACT
SR 285 Southbound - On the SR 285 Couplet - Chelan Avenue - Monday through Thursday expect single lane closures between 8 and 9 p.m.; double lane closures 9 p.m. to 6 a.m. where crews are installing traffic detection loops at intersections and paving the driving lanes. Last Updated: 7/31/2015 11:34 AM More Info
From milepost 1 to milepost 3
MODERATE IMPACT
SR 290 Both Directions - Asphalt paving project underway. Drivers should expect delays during evening and overnight hours. Last Updated: 6/22/2015 1:34 PM More Info
From milepost 10 to milepost 19
MODERATE IMPACT
SR 503 Northbound - Monday, Aug. 3 to Saturday, Aug. 8: Drivers on northbound SR 503, between Fourth Plain Boulevard and Northeast 119th Street, should expect intermittent single-lane closures daily from 9 p.m. to 6 a.m. Last Updated: 7/31/2015 2:28 PM More Info
From milepost 1 to milepost 6
MODERATE IMPACT
SR 506 Both Directions - SR 506 over Lacamas Creek Bridge, between Telegraph Road and Frontage Road (milepost 8.0)
Both directions of SR 506 will alternate through a single-lane across the Lacamas Creek Bridge until further notice. Last Updated: 5/29/2015 11:18 AM More Info
At milepost 8
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction
Traffic Impacts:
NOTE: The bridge is now open to traffic. Drivers should expect around-the-clock, alternating, single-lane traffic across the bridge. Drivers should follow signed traffic revisions and wait until the bridge is clear before proceeding across. Last Updated: 1/23/2015 8:17 AM More Info
At milepost 14
MODERATE IMPACT
SR 539 Northbound - Effective through Winter 2016: Canada Border Services Agency has made changes to its Aldergrove border crossing that could result in back-ups on SR 539. Processing has been reduced from three lanes to two. Drivers should consider using the Sumas, Pacific Highway or Peace Arch border crossings to avoid delays. Last Updated: 10/17/2014 8:24 AM More Info
At milepost 15
MODERATE IMPACT
SR 542 Both Directions - Tuesday, July 14 - Both directions of SR 542 at Squalicum Lake Road will close at 12:01 a.m. until late September for culvert replacement work. A signed detour will be in place. Last Updated: 7/9/2015 11:17 AM More Info
From milepost 6 to milepost 7
LOW IMPACT
I-90 Eastbound - I-90 eastbound milepost 53: Thursday the right shoulder will be closed for maintenance work from 6 a.m. to 4:30 p.m. Last Updated: 8/1/2015 8:35 PM More Info
At milepost 53
LOW IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 56 to 61: Drivers should be prepared for rolling slowdowns and lane closures both directions Monday through Saturday, day and night. I-90 is closed to bicycles, both directions, between the Hyak interchange, Exit 54, and Stampede Pass interchange, exit 62. The John Wayne Pioneer Trail may be used as an alternate route. Last Updated: 8/1/2015 8:28 PM More Info
From milepost 56 to milepost 61
LOW IMPACT
I-90 Eastbound - I-90 Vantage Bridge eastbound milepost 136 to milepost 137: Eastbound drivers will experience delays due to a single lane closure 24 hours a day, 7 days a week. In order to avoid delays, drivers may consider taking an alternate route using US 97, I-82 or SR 24. Loads over 14 feet wide are prohibited through the project area. Last Updated: 8/1/2015 8:24 PM More Info
From milepost 137 to milepost 138
LOW IMPACT
I-90 Both Directions - I-90 milepost 84 to 87 near Cle Elum: Monday through Friday nights traffic will be reduced to a single lane both directions. Motorists may experience added travel time and delay. Last Updated: 8/1/2015 8:13 PM More Info
From milepost 84 to milepost 87
LOW IMPACT
I-90 Westbound - I-90 westbound milepost 51: Monday August, 3 through Friday, August 7, there will be a right lane closure to repair the bridge deck. This closure will be 24 hours a day. There will be two lanes available. Last Updated: 8/1/2015 7:57 PM More Info
At milepost 51
LOW IMPACT
I-90 Both Directions - Saturday, Aug. 1, to Sunday, Aug. 2 - The I-90 express lanes will close at 11:50 a.m. daily for the Seafair Air Show. The lanes will reopen westbound by 3 p.m. Last Updated: 7/27/2015 4:09 PM More Info
From milepost 2 to milepost 10
LOW IMPACT
I-405 Southbound - Up to three lanes of southbound I-405 between SR 522 and Northeast 160th Street will close starting at 10 p.m. for striping work. All lanes will be open by 6:30 a.m. Last Updated: 7/31/2015 1:56 PM More Info
From milepost 24 to milepost 23
LOW IMPACT
US 2 Both Directions - Uniformed officers will intermittently stop both directions of U.S. 2 traffic at the Old Cascade Highway Saturday through Monday Aug. 1-3 to allow Courage Classic bicyclists to cross from Westbound U.S. 2 onto the Old Cascade Highway. Last Updated: 7/31/2015 3:21 PM More Info
At milepost 50
LOW IMPACT
US 195 Both Directions - During daylight hours, drivers should expect delays of up to 20 minutes with flaggers and pilot cars directing single-lane, alternating traffic. Drivers with time-sensitive travel should seek alternate routes or add extra time for their journey. Last Updated: 6/25/2015 8:26 AM More Info
From milepost 20 to milepost 30
LOW IMPACT
US 195 Southbound - Pavement rehabilitation project underway. Expect southbound lane restrictions. Last Updated: 6/17/2015 1:09 PM More Info
From milepost 88 to milepost 96
LOW IMPACT
US 395 Southbound - US 395 southbound milepost 45 to 61 (Vicinity of SR 17 Interchange to Muse Rd.) Thursday through Friday, 7 a.m. to 5 p.m. drivers should expect lane closures and narrowed lanes. Last Updated: 8/1/2015 8:14 PM More Info
From milepost 46 to milepost 61
LOW IMPACT
SR 823 Northbound - SR 823 northbound milepost 1 to milepost 3 (City of Selah): Monday, August 3 through Wednesday, August 5, there will be a right lane closure for pavement repair from 8 a.m. to 3 p.m. Last Updated: 8/1/2015 7:54 PM More Info
From milepost 1 to milepost 3
LOW IMPACT
SR 971 Both Directions - On SR 971 Monday through Thursday, 8 a.m. to 4:30 p.m., between Minneapolis Beach and Pat and Mike's, expect shoulder closures, lane shifts or flagger controlled traffic as needed where utility crews are replacing power poles and power lines. Last Updated: 7/10/2015 10:11 AM More Info
From milepost 14 to milepost 15
LOWEST IMPACT
I-5 Both Directions - SR 432 to I-5 / Old Hwy 99 Intersection Improvements (Roundabout)
(Mileposts: 36.0)
Traffic Impacts:
No scheduled traffic impacts. Last Updated: 7/24/2015 1:59 PM More Info
At milepost 37
LOWEST IMPACT
I-82 Eastbound - I-82 eastbound milepost 8, there will be a right lane closure for guardrail repair Monday August 3. Last Updated: 8/1/2015 7:56 PM More Info
At milepost 8
LOWEST IMPACT
I-90 Eastbound - I-90 eastbound milepost 36 to 37: Tuesday, August 4 between 6 a.m. and 4:30 p.m., WSDOT crews will close multiple lanes for road panel replacement work. Last Updated: 8/1/2015 7:58 PM More Info
At milepost 36
LOWEST IMPACT
I-90 Westbound - I-90 westbound milepost 38: Wednesday, August 5, between 6 a.m. and 4:30 p.m., WSDOT crews will close multiple lanes for road panel replacement work. Last Updated: 8/1/2015 7:58 PM More Info
At milepost 38
LOWEST IMPACT
I-90 Eastbound - I-90 eastbound milepost 55 to milepost 57: Monday, August 3, from 6 a.m. to 4:30 p.m., the right shoulder will be closed for maintenance work. Last Updated: 8/1/2015 7:55 PM More Info
From milepost 55 to milepost 57
LOWEST IMPACT
I-90 Eastbound - Recreational vehicle dump station at Sprague Lake Rest Area on I-90 eastbound, milepost 245, will be closed for repairs from 12:30 pm on April 30, 2015 until further notice. Last Updated: 4/30/2015 12:33 PM More Info
At milepost 245
LOWEST IMPACT
I-182 Westbound - I-182 milepost 5, westbound, Monday and Tuesday, August 3 and 4 between 9 a.m. and 4 p.m. WSDOT crews will close the right lane for pavement marking. Last Updated: 8/1/2015 8:12 PM More Info
At milepost 5
LOWEST IMPACT
SR 10 Both Directions - SR 10 milepost 88 to 104: Wednesday and Thursday drivers will experience delays due to pavement repair in various locations during the day. Last Updated: 8/1/2015 8:38 PM More Info
From milepost 88 to milepost 104
LOWEST IMPACT
SR 24 Both Directions - SR 24 milepost 17 to 18: Monday through Wednesday there will be a paving operation from 8 a.m. to 4 p.m. Flaggers will direct traffic through the work zone. Last Updated: 8/1/2015 8:39 PM More Info
From milepost 17 to milepost 18
LOWEST IMPACT
SR 241 Both Directions - SR 241 near Mabton at the intersection of SR 22: SR 241 at the intersection of SR 22 is open to through traffic. Possible shoulder closures on SR 241 throughout the week. Last Updated: 8/1/2015 8:17 PM More Info
At milepost 1
LOWEST IMPACT
SR 504 Both Directions - SR 504: Cowlitz County Public Utility District
(Mileposts: 19.73 to 21.0)
Traffic Impacts:
Monday, July 27 to Thursday, July 30: Both directions of SR 504 will alternate through a single-lane near the entrance of the North Fork Toutle River from 6 a.m. to 4:30 p.m. daily for utility work, roadside maintenance and tree trimming. Last Updated: 7/24/2015 2:01 PM More Info
From milepost 20 to milepost 21
LOWEST IMPACT
SR 906 Both Directions - SR 906 Snoqualmie Pass summit: Flagged traffic control for core drilling operations on SR 906 between Exit 52 off ramp and Exit 54 on ramp. Work will be Monday, Aug. 3 through Thursday, Aug. 6 between 6 a.m. to 4:30 p.m. Work locations will vary along SR 906 and all on and off ramps. Last Updated: 8/1/2015 8:00 PM More Info
From milepost 1 to milepost 3