Return to Map

HIGHEST IMPACT
I-5 Southbound - Update 11:44 AM : On the I-5 southbound off-ramp to N Northgate Way EB (MP 173) there is a collision partially blocking the ramp. The Incident Response Team and the State Patrol have arrived on the scene. Last Updated: 5/6/2016 11:46 AM More Info
At milepost 173
HIGHEST IMPACT
I-5 Northbound - On I-5 northbound just south of 44th Ave W (MP 181) there is a collision blocking the right lane. Fire Assistance has arrived on the scene. Last Updated: 5/6/2016 11:41 AM More Info
At milepost 181
HIGHEST IMPACT
US 2 Both Directions - From 10 a.m. to 3 p.m. TODAY, FRIDAY MAY 6 ON US 2, MOTORIST CAN EXPECT DELAYS AND 1 LANE PILOTED TRAFFIC FROM MILE POST 99 AT LEAVENWORTH TO COLES CORNER AT MILEPOST 84.75 DUE TO A BICYCLE RACE. No wide loads permitted. Last Updated: 5/6/2016 8:53 AM More Info
From milepost 85 to milepost 99
HIGH IMPACT
I-5 Northbound - Monday, May 2, to the morning of Friday, May 6 – Northbound I-5 before SR 528 is reduced to three narrower lanes with a speed limit of 45 mph for expansion joint replacement work. Last Updated: 5/3/2016 1:49 PM More Info
At milepost 198
HIGH IMPACT
I-90 Both Directions - This is an activation of the Washington Statewide Endangered Missing Person Advisory Plan, in response to the report of a missing and endangered person. The Washington State Patrol is asking for the public’s assistance, in locating the following vehicle. A silver, 2004, Ford, F350, Washington license, B30763W. If you have any information about this vehicle, please call nine one one immediately. Last Updated: 5/5/2016 3:23 PM More Info
At milepost 280
HIGH IMPACT
SR 7 Northbound - Northbound SR 7 on-ramp to southbound I-5 is closed for construction through winter 2017. Last Updated: 3/24/2016 9:27 AM More Info
From milepost 58 to milepost 59
HIGH IMPACT
SR 99 Both Directions - Until further notice - Both directions of the Alaskan Way Viaduct/SR 99 between the West Seattle Bridge and the south end of the Battery Street Tunnel closed on Friday, April 29, for approximately two weeks for tunneling work. Last Updated: 4/29/2016 7:01 PM More Info
From milepost 29 to milepost 33
HIGH IMPACT
SR 507 Northbound - Road work on SR 507 northbound from milepost 26.0 near Koeppen Rd SE to milepost 28.0 near Second St NE beginning at 7:52 am on May 6, 2016 until about 3:00 pm. Last Updated: 5/6/2016 10:49 AM More Info
From milepost 26 to milepost 28
MODERATE IMPACT
I-5 Southbound - Monday, May 2, to Friday, May 6 – Up to four right lanes of southbound I-5 from South 272nd Street to South 320th Street will be closed nightly for construction work beginning with one right lane at 8 p.m. All lanes will reopen by noon. Last Updated: 5/5/2016 6:21 PM More Info
From milepost 147 to milepost 144
MODERATE IMPACT
I-5 Southbound - Sunday, May 1, to Friday, May 6 – Up to four left lanes of southbound I-5 from South 200th Street to SR 516 will be closed nightly for construction work beginning with one left lane at 8 p.m. All lanes will reopen by noon. Last Updated: 5/5/2016 6:21 PM More Info
From milepost 151 to milepost 150
MODERATE IMPACT
I-5 Both Directions - Until further notice - The I-5 express lanes will remain open northbound until 11:59 p.m. nightly due to the Alaskan Way Viaduct/SR 99 closure. The lanes will open southbound on schedule at 5 a.m. weekdays and 8 a.m. on the weekend. Last Updated: 5/4/2016 5:14 PM More Info
From milepost 165 to milepost 173
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 57 to 60: Daytime: Monday through Friday noon, drivers should prepare for intermittent rolling slowdowns and possible added travel time in both directions. Nighttime: Monday night May 2 through Saturday morning May 7, eastbound traffic will be reduced to one lane each night. Motorists may experience added travel time and delays. I-90 is closed to bicycles in both directions between the Hyak interchange (Exit 54) and Stampede Pass interchange (exit 62). Last Updated: 5/6/2016 4:41 AM More Info
From milepost 57 to milepost 60
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 62 to 69 Snoqualmie Pass Wildlife Bridge: Motorists will encounter night time lane closures Monday thru Thursday in both directions of travel. Minor delays should be anticipated.
Scheduled rock blasting-related closure:
Thursday, May 5. Starting a 7 p.m., traffic will be stopped eastbound at milepost 56 near Gold Creek and westbound at milepost 63 near Cabin Creek for rock blasting. Last Updated: 5/6/2016 4:41 AM More Info
From milepost 62 to milepost 69
MODERATE IMPACT
I-90 Westbound - I-90 Oakes Ave Interchange to Peoh Rd. mileposts 84 to 87: Westbound traffic will be reduced to one lane 24 hours per day, weekdays. Both lanes will be open on the weekends. Westbound Oaks Ave. Exit 84 will be closed Monday through Friday. In mid May to mid June, Oaks Ave will be closed 24 hours per day. Drivers can access Cle Elum via the Peoh Road Bridge interchange at exit 85. Westbound on ramp at MP 85 will be closed during the same time frame. Last Updated: 5/6/2016 4:40 AM More Info
From milepost 84 to milepost 87
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass rock blasting operations are completed for the week. During blasting closures eastbound traffic will stopped at Gold Creek milepost 56, and westbound traffic will be stopped at milepost 62, Cabin Creek. No services are available past exit 53 eastbound and exit 70 westbound during blasting closures. Last Updated: 5/6/2016 4:39 AM More Info
From milepost 56 to milepost 62
MODERATE IMPACT
US 2 Both Directions - Motorists may encounter occasional flagger controlled traffic and possible delays on US 2 at milepost 131, at Baker Flats north of East Wenatchee, due to roundabout construction. Work zone speed is reduced to 35 mph. Work hours are Monday through Thursday, 7 am to 7 pm and Friday, 7 to noon. Last Updated: 5/6/2016 8:58 AM More Info
At milepost 131
MODERATE IMPACT
US 97 Both Directions - Single Lane traffic on US 97 at milepost 144 to milepost 149 as WSDOT crew works installing recessed pavement markers in the roadway. Motorists will experience intermittent 15 minute delays as the crew installs pavement markers. Last Updated: 5/6/2016 4:38 AM More Info
From milepost 144 to milepost 149
MODERATE IMPACT
SR 14 Both Directions - Sunday, May 1 to Sunday, May 8: Around-the-clock, single-lane closures on both directions of SR 14, between milepost 58.84 to 58.94, for rock scaling work. NOTE: Tunnel 3 will have height and length restrictions in place for the duration of the project.
NOTE: Drivers should expect delays of up to 20 minutes.
NOTE: The speed limit on SR 14 has been reduced to 25 mph, through this section of highway, for the duration of the project. Last Updated: 4/29/2016 1:19 PM More Info
At milepost 59
MODERATE IMPACT
SR 99 Both Directions - The SR 99 Alaskan Way Viaduct is closed due to construction for approximately 2 weeks from W Seattle Bridge to Battery Street Tunnel. Last Updated: 5/2/2016 2:30 PM More Info
From milepost 22 to milepost 26
MODERATE IMPACT
SR 169 Northbound - On SR 169 northbound at 131st Ave SE (MP 23) the right lane is closed due to roadwork. Last Updated: 5/6/2016 9:12 AM More Info
At milepost 23
MODERATE IMPACT
SR 433 Northbound - Saturday, April 30 to the morning of Sunday, May 1: Drivers on both directions of SR 433/Lewis and Clark Bridge, may be alternated through a single-lane, with flaggers, from 11 p.m. to 8 a.m., for wire installation along the length of the bridge. Last Updated: 4/29/2016 1:22 PM More Info
At milepost 0
MODERATE IMPACT
SR 433 Both Directions - Friday, April 29 to the morning of Saturday, April 30: Drivers on both directions of SR 433/Lewis and Clark Bridge, may be alternated through a single-lane, with flaggers, from 10 p.m. to 4 a.m., for wire installation along the length of the bridge. Last Updated: 4/29/2016 1:20 PM More Info
At milepost 0
MODERATE IMPACT
SR 433 Both Directions - Monday, May 2 to the morning of Friday, May 6: Drivers on both directions of SR 433/Lewis and Clark Bridge, may be alternated through a single-lane, with flaggers, from 9 p.m. to 5 a.m., for wire installation along the length of the bridge. Last Updated: 4/22/2016 2:41 PM More Info
At milepost 0
MODERATE IMPACT
SR 501 Both Directions - Monday, May 2 to Sunday, May 8: Drivers on both directions of SR 501 between North Smythe Road and North Reiman Road will be alternated through a single-lane of traffic around-the-clock for hillside stabilization and roadway repair work. Use caution and expect delays.
NOTE: The speed limit in this area has been temporarily reduced from 40 mph to 25 mph through the work zone. Last Updated: 4/29/2016 1:24 PM More Info
From milepost 18 to milepost 19
MODERATE IMPACT
SR 502 Both Directions - Monday, May 2 to Friday, May 6: A single-lane in either direction of SR 502 maybe closed intermittently between I-5 to Battle Ground daily from 9 a.m. to 3 p.m. for roadway widening.
NOTE: Work is weather dependent. Last Updated: 4/29/2016 1:25 PM More Info
From milepost 0 to milepost 7
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction
Traffic Impacts:
NOTE: The bridge is now open to traffic. Drivers should expect around-the-clock, alternating, single-lane traffic across the bridge. Drivers should follow signed traffic revisions and wait until the bridge is clear before proceeding across. Last Updated: 1/29/2016 11:47 AM More Info
At milepost 14
LOW IMPACT
I-90 Eastbound - I-90 milepost 137 Vantage Bridge: Both east and westbound: Daytime width restriction of 14’ from 6 a.m. to 8 p.m. Expect one lane to be closed as crews install containment nets above the roadway. Last Updated: 5/6/2016 4:40 AM More Info
At milepost 137
LOW IMPACT
I-405 Northbound - Thursday, May 5 to the morning of Friday, May 6 - One right lane of northbound I-405 between Northeast 70th Place and Northeast 85th Street will be closed from 8 p.m. to 5 a.m. Last Updated: 5/5/2016 3:13 PM More Info
From milepost 17 to milepost 19
LOW IMPACT
US 12 Both Directions - US 12 White Pass: The temporary washout repairs were completed Feb. 1. A traffic signal will continue to direct traffic through a single lane near these repair areas. Work to reconstruct the roadway in the three washout locations will resume in early May. Last Updated: 5/6/2016 4:40 AM More Info
From milepost 138 to milepost 156
LOW IMPACT
SR 224 Both Directions - SR-224/SR-225 Benton City: Monday through Friday when traveling through the new intersection work zone motorists will experience intermittent 15 minute delays between 7 a.m. and 5:30 p.m.
Restrictions:
For freight-related restrictions please see the Commercial Vehicle Services Road Restrictions webpage:
http://www.wsdot.wa.gov/commercialVehicle/Restrictions/roadlist.aspx Last Updated: 5/6/2016 4:40 AM More Info
At milepost 0
LOW IMPACT
SR 410 Both Directions - SR 410 remains closed as crews continue clearing Chinook Pass with the goal to reopen the highway by Memorial Day weekend. The pass is currently closed from milepost 74.5, Morse Creek to the SR 123 / SR 410 intersection. Last Updated: 5/6/2016 4:41 AM More Info
From milepost 65 to milepost 74
LOWEST IMPACT
I-90 Westbound - I-90 westbound milepost 62 to 64: Work to begin the summer of 2016. Last Updated: 5/6/2016 4:40 AM More Info
From milepost 62 to milepost 64
LOWEST IMPACT
I-90 Eastbound - I-90 milepost 63 Eastbound: No impacts to traffic other than shoulder closures. No delays are anticipated. Last Updated: 5/6/2016 4:40 AM More Info
At milepost 63
LOWEST IMPACT
I-90 Eastbound - I-90 milepost 67 to 69 Eastbound: Work will resume in Spring of 2016. Last Updated: 5/6/2016 4:40 AM More Info
From milepost 67 to milepost 69
LOWEST IMPACT
I-90 Both Directions - I-90 Elk Heights Vicinity both directions: Monday through Friday during the day, traffic will be reduced to one lane. Traffic delays are not anticipated. Last Updated: 5/6/2016 4:39 AM More Info
From milepost 87 to milepost 93
LOWEST IMPACT
US 12 Both Directions - Current Week Traffic Advisory: No anticipated traffic impacts. Last Updated: 5/6/2016 4:39 AM More Info
From milepost 380 to milepost 401
LOWEST IMPACT
SR 129 Both Directions - SR 129 milepost 32 to milepost 36: Friday May 6 between the hours of 7 a.m. and 5:30 p.m. motorists will experience pilot car directed traffic with up to 15 minute delays. Last Updated: 5/6/2016 4:39 AM More Info
From milepost 32 to milepost 36
LOWEST IMPACT
SR 397 Both Directions - SR-397 milepost 20 to milepost 22: Between East A Street and City View Cemetery Lane, motorists may experience minor delays while traffic is reduced by a single lane closure in each direction during daylight hours Monday through Friday. Last Updated: 5/6/2016 4:40 AM More Info
From milepost 20 to milepost 22