Return to Map

HIGHEST IMPACT
I-5 Northbound - On I-5 northbound at NE 45th St (MP 169) there is a collision blocking the right lane. Fire Assistance has arrived on the scene. Last Updated: 4/18/2014 4:53 PM More Info
At milepost 169
HIGHEST IMPACT
SR 530 Both Directions - Update 2:00 PM : On SR 530 eastbound & westbound from Whitman Rd (MP 36) to 310th St NE (MP 39) there is an incident blocking all lanes. The Incident Response Team has arrived on the scene. Last Updated: 4/15/2014 2:01 PM More Info
From milepost 36 to milepost 39
HIGH IMPACT
I-82 Both Directions - I-82 from Milepost 82 to Milepost 132, Near Prosser to the Oregon State Line. The movement of mobile homes is restricted from Prosser to the Oregon state line due to high winds. Last Updated: 4/18/2014 9:35 AM More Info
From milepost 82 to milepost 132
HIGH IMPACT
I-90 Both Directions - I-90 milepost 56 to 61, east of the summit, traffic revisions to build detours for use this construction season. Two lanes open eastbound until 8 p.m., westbound travel remains limited to a single lane. Drivers should prepare for up to 2 hours of added travel time until April 25. To minimize added travel time, drivers should be over the pass before 8 a.m., travel after 8 p.m., or consider alternate routes. After 8 p.m. travel will be limited to single lane both directions through the workzone. Last Updated: 4/18/2014 10:13 AM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15) Traffic Impacts: Monday, April 21 to Friday, April 25: Nighttime single-lane closures on both directions of I-5. Last Updated: 4/18/2014 9:16 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - Drivers should anticipate congestion and delays in both directions of I-5 in Skagit County due to the tulip festival. Last Updated: 4/18/2014 7:22 AM More Info
From milepost 218 to milepost 243
MODERATE IMPACT
I-90 Both Directions - One lane will be open in each direction at all times. The speed through the work zones is reduced to 50 mph. Monday through Wednesday, 7 a.m. to 9 p.m., expect single lane closures, and narrowed lanes where a crew is paving both EB and WB. This should complete the paving. Monday through Friday, Expect no lane closures during crack sealing on shoulders and ramps. One day detours are allowed on the ramps at Silica and SR 26 interchanges but none are planned for this week. Last Updated: 4/18/2014 4:34 PM More Info
From milepost 137 to milepost 148
MODERATE IMPACT
I-90 Eastbound - Indian John Rest Area eastbound milepost 89: The eastbound rest area will be closed Monday, April 21 at 6 a.m. until Thursday, April 24 at 7 p.m. Last Updated: 4/18/2014 8:28 AM More Info
From milepost 87 to milepost 89
MODERATE IMPACT
US 12 Both Directions - US 12 White Pass: Traffic is restricted to one lane through the work zone seven days a week, 24 hours a day. Alternating traffic will be controlled by a traffic signal or flaggers. Motorists can expect delays up to 15 minutes. For freight-related restrictions please visit the Commercial Vehicle Services Road Restrictions Web page. Last Updated: 4/18/2014 8:21 AM More Info
At milepost 154
MODERATE IMPACT
US 195 Both Directions - Interchange Construction on US 195 NB, milepost 94, in Spokane at Cheney-Spokane Road until further notice. Last Updated: 3/25/2014 2:24 PM More Info
At milepost 94
MODERATE IMPACT
SR 21 Both Directions - Rough roadway on SR 21 milepost 177, 17 miles north of Republic, from 6:30 AM on March 18, 2014 until further notice. Speed limit 35 mph and motorcycles use caution. Last Updated: 3/20/2014 12:26 PM More Info
From milepost 176 to milepost 177
MODERATE IMPACT
SR 150 Northbound - Monday through Thursday, 7 a.m. to 5 p.m., expect shoulder and lane closures and detours for pedestrians. When the traffic signals are taken out of service, the intersection will be treated as a four way stop. This week work continues on the curb ramps and sidewalks on all four corners. Pedestrian routes are maintained on three of four quadrants at all times. In-ground work for the signal system begins. Last Updated: 4/18/2014 4:47 PM More Info
At milepost 8
MODERATE IMPACT
SR 243 Both Directions - At Mattawa, Monday through Friday, 7 a.m. to 5 p.m., expect occasional delays of up to 20 minutes with flaggers directing traffic on SR 243 or Road 24 SW as needed where crews are constructing a roundabout. Last Updated: 4/11/2014 4:51 PM More Info
At milepost 14
MODERATE IMPACT
SR 504 Both Directions - Closure on SR 504 both directions at Milepost 45 near Hummocks Trailhead to Johnston Ridge for the winter beginning at 11:37 a.m. on November 16, 2013 Last Updated: 11/16/2013 11:46 AM More Info
At milepost 45
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction Traffic Impacts: SR 508 is restricted to vehicles weighing more than seven tons. Trucks and large passenger vehicles should follow posted detour signs: Eastbound drivers, take Leonard Road to US 12. Westbound drivers, take Cinebar Road to Silver Creek Road/SR 122 to US 12. Last Updated: 3/14/2014 10:53 AM More Info
At milepost 14
LOW IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08) Traffic Impacts: Saturday, April 21 to Friday, April 25: Workers will be present beyond the shoulder during daylight hours 7 days-a-week. Last Updated: 4/18/2014 9:17 AM More Info
From milepost 20 to milepost 21
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46) Monday, April 21 to Friday, April 25: No scheduled traffic impacts. Last Updated: 4/18/2014 9:15 AM More Info
From milepost 10 to milepost 20
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, mileposts 36.07 to 36.83 and I-5 mileposts 6.95 to 9.51) Monday, April 21 to Friday, April 25: Daytime single-lane closures on both directions of I-205. Rolling slowdowns, flagging and shoulder closures throughout the project area. Last Updated: 4/18/2014 9:04 AM More Info
From milepost 7 to milepost 10
LOW IMPACT
I-90 Both Directions - Oakes Ave. Interchange Milepost 84: Monday, April 21 through Thursday, April 24, expect periodic shoulder closures on both ramps at this interchange. Last Updated: 4/18/2014 8:17 AM More Info
At milepost 84
LOW IMPACT
I-90 Both Directions - Thorp Road Interchange Milepost 101: Monday, April 21 through Thursday, April 24, expect periodic shoulder closures on all ramps at this interchange. Last Updated: 4/18/2014 8:13 AM More Info
At milepost 101
LOW IMPACT
I-205 Both Directions - Salmon Creek Interchange Project (I-205, mileposts 36.07 to 36.83 and I-5 mileposts 6.95 to 9.51) Monday, April 21 to Friday, April 25: Daytime single-lane closures on both directions of I-205. Rolling slowdowns, flagging and shoulder closures throughout the project area. Last Updated: 4/18/2014 9:05 AM More Info
From milepost 36 to milepost 38
LOW IMPACT
US 97 Both Directions - US 97 milepost 137 to 138 north of Ellensburg: A single lane temporary detour is in place. Traffic on the detour is limited to one lane and is controlled by a traffic signal. Oversize vehicle restrictions are in place. Minor delays can be anticipated. Drivers may consider alternate routes via I-90 or SR 10. Last Updated: 4/18/2014 8:28 AM More Info
From milepost 137 to milepost 138
LOW IMPACT
US 101 Both Directions - US 101 - Middle Nemah River Bridge Replacement (mileposts 33.04 to 33.99) Traffic Impacts: Traffic is reduced to a single lane and will be controlled by a flagger or temporary traffic signal 24 hours-a-day. NOTE: The speed limit is reduced to 25 mph. Last Updated: 3/28/2014 11:48 AM More Info
From milepost 33 to milepost 34
LOW IMPACT
US 101 Both Directions - US 101, Astoria Megler Bridge Painting Project (milepost 0.00 to 0.72) – ODOT A 35 mph speed limit through the construction zone will be maintained for the duration of the project. Expect single-lane traffic and 20-minute delays anytime on weekdays and weekends. Last Updated: 1/19/2012 11:49 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 6 Both Directions - SR 6, Willapa River Bridge - Bridge Replacement (mileposts 6.86 to 7.26) Traffic Impacts: Starting Feb. 17 and lasting through April, traffic on the bridge will be reduced to a single lane controlled by an automatic signal 24 hours a day, seven days a week. Last Updated: 3/14/2014 10:54 AM More Info
From milepost 7 to milepost 8
LOW IMPACT
SR 14 Both Directions - SR 14 at Bridge of the Gods (milepost 41.6) Drivers crossing the Bridge of the Gods should expect intermittent delays of up to 20 minutes. Last Updated: 4/4/2014 1:34 PM More Info
At milepost 42
LOW IMPACT
SR 20 Both Directions - The North Cascades Highway remains closed, however the reopening work is underway and should take until mid-May to complete. Last Updated: 4/8/2014 12:03 PM More Info
From milepost 178 to milepost 134
LOW IMPACT
SR 105 Both Directions - SR 105, Smith Creek and North River - Bridge Replacements (mileposts 6.25 to 13.65) Traffic Impacts: A temporary signal will control single-lane traffic on the new North River Bridge. Both lanes on the Smith Creek Bridge will be open. The speed limit has been reduced to 25 mph in the project area. Last Updated: 4/18/2014 3:24 PM More Info
From milepost 6 to milepost 14
LOW IMPACT
SR 129 Both Directions - SR 129 milepost 0 to 11: Monday, April 21 through Friday, April 25, motorists will experience one lane traffic control and up to 30 minute delays between the hours of 7 a.m. and 4 p.m. for slope stabilizing work. Last Updated: 4/18/2014 8:19 AM More Info
From milepost 1 to milepost 12
LOW IMPACT
SR 241 Both Directions - SR 241 milepost 0 to milepost 13: Friday April 18, motorists can expect one lane flagger controlled traffic with delays of 10 minutes between the hours of 7 a.m. and 5 p.m. Last Updated: 4/18/2014 8:09 AM More Info
From milepost 0 to milepost 13
LOW IMPACT
SR 410 Both Directions - Chinook Pass, State Route 410 is closed for the Season from milepost 74.5 near Morse Creek to milepost 57.5 near Crystal Mountain Blvd. due to heavy snowfall, strong winds and avalanche danger. Last Updated: 4/14/2014 7:26 PM More Info
From milepost 74 to milepost 57
LOW IMPACT
SR 411 Both Directions - SR 411, City of Kelso - West Main Street Realignment (mileposts 1.50 to 1.75) Traffic Impacts: Saturday, April 19 to Friday, April 25: SR 411 is open Access on SR411 between Washington and Grant is now open to thru traffic. Traffic at the intersection of SR411 and Main/Allen is controlled by a four way stop. NOTE: The right lane of SR 4 eastbound is closed from Vandercook Way to 7th Avenue SW. Last Updated: 4/18/2014 9:18 AM More Info
From milepost 2 to milepost 2
LOW IMPACT
SR 411 Both Directions - SR 411, City of Castle Rock - Front Avenue Improvement (mileposts 12.6 to 13.2) Traffic Impacts: No scheduled traffic impacts. Last Updated: 12/20/2013 8:44 AM More Info
From milepost 13 to milepost 14
LOW IMPACT
SR 433 Both Directions - SR 433 at the Lewis and Clark Bridge (milepost 0.0) Traffic Impacts: No scheduled traffic impacts. Last Updated: 3/7/2014 10:39 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 504 Both Directions - SR 504, Both directions between Hummocks Trail east to Loowit viewpoint (mileposts 45.0 to 52.0) SR 504 has been closed for the winter season starting Saturday, Nov. 16. Last Updated: 11/22/2013 2:34 PM More Info
From milepost 45 to milepost 52
LOW IMPACT
SR 507 Both Directions - SR 507, Reynolds Avenue - Signal Replacement (mileposts 2.64 to 2.76) Traffic Impacts: Monday, April 21 to Friday, April 25: Daytime single-lane closures with flaggers. Last Updated: 4/18/2014 9:16 AM More Info
From milepost 3 to milepost 3
LOWEST IMPACT
I-5 Southbound - I-5, Northbound from Pioneer Street to N. Fork Lewis River Bridge (mileposts 14.5 to 18.21) Monday, April 14 to Thursday, April 17: Nighttime single and double-lanes closures, southbound, and nighttime intermittent ramp closures on the following ramps from 7 p.m. to 6 a.m. Battle Ground (Exit 11), Ridgefield (Exit 14) and La Center (Exit 16), for paving. Last Updated: 4/11/2014 11:14 AM More Info
From milepost 14 to milepost 19
LOWEST IMPACT
US 2 Westbound - The Iron Goat Interpretive Site is closed for the winter. Last Updated: 11/8/2013 11:54 AM More Info
At milepost 58
LOWEST IMPACT
US 12 Eastbound - US 12 milepost 201.9, Tuesday April 22 and Wednesday April 23, between 8 a.m. and 3:30 p.m., WSDOT crews will close one eastbound lane for bridge deck repair work. Last Updated: 4/18/2014 8:09 AM More Info
At milepost 201
LOWEST IMPACT
US 12 Northbound - US 12, Eastbound between Avery Road and Larmon Road (mileposts 69.16 to 70.39) Monday, April 14 to Friday, April 18: Daytime single-lane and shoulder closures for roadside maintenance. Last Updated: 4/11/2014 10:04 AM More Info
From milepost 69 to milepost 71
LOWEST IMPACT
SR 6 Both Directions - SR 6, Rock Creek East and West Bridges - Replacement (mileposts 25.95 to 26.94) Traffic Impacts: Wednesday, April 23 to Friday, April 25: Daytime shoulder closures within project limits. Last Updated: 4/18/2014 9:22 AM More Info
From milepost 26 to milepost 27
LOWEST IMPACT
SR 128 Both Directions - State Route 128 milepost 0 to mp 2.5, Monday, April 21st through Thursday, April 24th, between the hours of 7 a.m. to 4 p.m., expect single lane flagger controlled traffic, as maintenance workers grind and patch the road surface. Ten minutes delays can be anticipated. Last Updated: 4/18/2014 8:11 AM More Info
From milepost 0 to milepost 3
LOWEST IMPACT
SR 411 Both Directions - SR 411 - Huntington Avenue Sidewalk Improvements (mileposts 12.46 to 12.7) Traffic Impacts: Monday, April 14 to Friday, April 18: No scheduled traffic impacts. Last Updated: 4/11/2014 11:29 AM More Info
From milepost 12 to milepost 13
LOWEST IMPACT
Francis Both Directions - Bridge construction on Francis. Drivers should expect delays. Last Updated: 3/25/2014 2:39 PM More Info