Return to Map

HIGHEST IMPACT
US 101 Eastbound - Vehicle fire on US 101 eastbound at milepost 266.0 near Simdars Rd beginning at 9:47 pm on August 1, 2014 until further notice. Eastbound lanes are blocked. Last Updated: 8/1/2014 9:49 PM More Info
At milepost 266
HIGHEST IMPACT
SR 20 Both Directions - SR 20 is closed from milepost 196 at Twin Lakes Road to milepost 202 at Twisp due to fire activity. There is a detour available using local roads. Last Updated: 8/1/2014 2:53 PM More Info
From milepost 196 to milepost 202
HIGH IMPACT
I-5 Northbound - Left lane on I-5 northbound at milepost 56.0 is closed for debris clean up from earlier collision. Use caution in the area. Last Updated: 8/1/2014 11:27 PM More Info
At milepost 56
HIGH IMPACT
I-90 Both Directions - The Blue Angels practices and the Seafair Air Shows will close the I-90 mainline, I-90 Express Lanes and associated ramps and roadways. The entire length of the I-90 Express Lanes will close from I-5 Interchange to I-405, and both directions of mainline I-90 will close from I-5 Interchange to Island Crest Way on Thursday, July 31, 2014, from 9:45 a.m. to 12:00 p.m. and 1:15 p.m. to 2:40 p.m. On Friday, August 1, 2014 through Sunday, August 3, 2014 they will close from 12:15 p.m. until 2:40 p.m Last Updated: 7/30/2014 1:05 PM More Info
From milepost 0 to milepost 10
HIGH IMPACT
SR 3 Southbound - Road work on SR 3 southbound from milepost 46.5 near Trigger Ave to milepost 45.0 near Anderson Hill Rd beginning at 8:54 pm on August 1, 2014 until about 8:00 am on August 2, 2014. Last Updated: 8/1/2014 9:00 PM More Info
From milepost 46 to milepost 45
HIGH IMPACT
SR 241 Both Directions - SR 241 milepost 1: Roadway is closed to all traffic until repairs to bridge are completed. State Route 223 to State Route 22 is the alternate route. As well as a signed detour route utilizing local roads. Last Updated: 7/31/2014 1:40 PM More Info
At milepost 1
HIGH IMPACT
SR 520 Westbound - Friday, August 1 to the morning of Monday, August 4 - The westbound SR 520 off-ramp to 108th Avenue Northeast will close from 11 p.m. Friday to 5 a.m. Monday for intersection reconstruction. Last Updated: 8/1/2014 2:46 PM More Info
At milepost 6
HIGH IMPACT
SR 520 Both Directions - Friday, August 1 to the morning of Monday, August 4 - The 108th Avenue Northeast on-ramps to eastbound and westbound SR 520 will close from 11 p.m. Friday to 5 a.m. Monday for concrete work. Last Updated: 8/1/2014 2:45 PM More Info
At milepost 6
MODERATE IMPACT
I-5 Both Directions - I-5, Mellen Street to Blakeslee Junction - Stage 2 (mileposts 79.81 to 84.15) Monday, Aug. 4 to Friday, Aug. 8: Daytime and nighttime, intermittent, single-lane and shoulder closures on both directions of I-5. Nighttime closures and flaggers on Mellen Street and Ellsbury Street. Monday, Aug. 4 to Friday, Aug. 8: Nighttime, on and off-ramp closures on both directions of Mellen Street, from 10 p.m. Monday, Aug. 4 to 6 a.m. Friday, Aug. 8. Last Updated: 8/1/2014 9:19 AM More Info
From milepost 80 to milepost 85
MODERATE IMPACT
I-5 Both Directions - Tuesday, July 8 to November - Both directions of I-5 near the Stillaguamish River Bridge have been reduced to two lanes until bridge work is complete in November. Drivers should be prepared for some delays throughout the day. The heaviest northbound congestion is expected Thursdays and Fridays 3-6 p.m., and Saturdays and Sundays 11 a.m. to 4 p.m. The heaviest southbound congestion is expected Sundays 4 to 6 p.m. Drivers should plan for up to 35 minutes of extra travel time during these hours. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
MODERATE IMPACT
I-5 Southbound - All southbound I-5 traffic is reduced to two lanes and will use a new crossover across the median to two lanes of northbound I-5 across the Stillaguamish River Bridge, crossing back over on the other side of the bridge, until the project is complete in November. Northbound I-5 is reduced to two lanes from SR 530 to 236th Street Northeast as well. Drivers should prepare for a 55 mile per hour speed limit in both directions in the work zone. Last Updated: 7/17/2014 10:39 AM More Info
From milepost 208 to milepost 210
MODERATE IMPACT
I-90 Westbound - I-90 westbound, right lane and both on ramps at Harvard Road closed, milepost 296, in Liberty Lake, from 7:08 pm on August 1, 2014 until about 11:00 PM. Last Updated: 8/1/2014 8:54 PM More Info
At milepost 296
MODERATE IMPACT
I-90 Eastbound - Right lane closed for road work, I-90 both directions, milepost 283.5, Altamont to Thor Freya in east Spokane, from 8:25 pm on August 1, 2014 until about 6:00 am August 2, 2014. Last Updated: 8/1/2014 8:36 PM More Info
At milepost 282
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie pass rock blasting scheduled Monday through Thursday at 7:30 p.m. and lasting one hour or more. During blasting I-90 will be closed milepost 56 near Gold Creek to milepost 61 near Price Creek. During blasting closures there are no services eastbound past milepost 53 and westbound past milepost 70. Last Updated: 8/1/2014 10:35 AM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 56 to 61: Drivers should prepare for intermittent rolling slowdowns both directions Monday through Friday, during daytime hours. Nighttime Restrictions: Traffic will be reduced to one lane both directions, Monday through Friday, during nighttime hours. Last Updated: 7/31/2014 9:06 PM More Info
From milepost 56 to milepost 61
MODERATE IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 47 to 55 eastbound: Right lane closures 24 hours a day. Work hours are primarily Monday through Saturday from 10 p.m. to 9 a.m. A center lane will be closed during the week, this will require traffic to shift to the right or left. Westbound: Single lane closures 24 hours a day Monday through Saturday from 10 pm to 9am. Last Updated: 7/31/2014 7:35 AM More Info
From milepost 47 to milepost 55
MODERATE IMPACT
I-90 Both Directions - Resurfacing work will be under way on Interstate 90 from the Lincoln Spokane county Line to the Salnave Road Interchange. Drivers should be alert for lane restrictions, rough pavement, and reduced legal speed limits. Motorcyclists should use caution. Last Updated: 6/26/2014 11:39 AM More Info
From milepost 255 to milepost 265
MODERATE IMPACT
I-405 Southbound - Friday, August 1 to the morning of Sunday, August 3 – The Northeast 85th Street on-ramp to southbound I-405 will close from 10 p.m. to 6 a.m. nightly for paving and lane restriping work. Last Updated: 7/31/2014 3:05 PM More Info
At milepost 18
MODERATE IMPACT
I-405 Southbound - Friday, August 1 to the morning of Sunday, August 3 – The southbound I-405 off-ramp to Northeast 70th Street will close from 9 p.m. to 6 a.m. nightly for paving and lane restriping work. Last Updated: 7/31/2014 3:04 PM More Info
At milepost 17
MODERATE IMPACT
I-405 Southbound - Friday, August 1 to the morning of Saturday, August 2 – Up to three lanes of southbound I-405 between Northeast 85th Street and Northeast 70th Street will close starting at 7 p.m. nightly for paving and lane restriping work. Two lanes will close at 10 p.m., and three lanes will close at 11:30 p.m. All lanes will reopen by 7 a.m. each day. Last Updated: 7/31/2014 3:04 PM More Info
From milepost 18 to milepost 18
MODERATE IMPACT
US 2 Both Directions - Re surfacing work will be underway from Espanola Road to Interstate 90. This includes US 2 through Airway Heights. Most asphalt paving work will be done during evening and overnight hours. Drivers should be alert for lane restrictions, rough pavement, and possible delays. Motorcyclists should use cuation on rogh pavement. Last Updated: 6/26/2014 11:39 AM More Info
From milepost 271 to milepost 284
MODERATE IMPACT
US 97 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23, SR 14 mileposts 100.5 to 102.0) Traffic Impacts: Monday, Aug. 4 to Thursday, Aug. 7: Daytime, single-lane closures, with flaggers. Last Updated: 8/1/2014 9:53 AM More Info
From milepost 2 to milepost 3
MODERATE IMPACT
SR 14 Both Directions - US 97 / SR 14 Maryhill Interchange couplet (US 97 milepost 2.23 and SR 14 mileposts 100.5 to 102.0) Traffic Impacts: Monday, Aug. 4 to Thursday, Aug. 7: Daytime, single-lane closures, with flaggers. Last Updated: 8/1/2014 9:51 AM More Info
From milepost 100 to milepost 102
MODERATE IMPACT
SR 14 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, Aug. 4 to Friday, Aug. 8: Daytime, intermittent, single-lane closures with flaggers and a pilot car, on SR 14, SR 141 and on the SR 141 Spur. Last Updated: 8/1/2014 9:33 AM More Info
From milepost 67 to milepost 103
MODERATE IMPACT
SR 141 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, Aug. 4 to Friday, Aug. 8: Daytime, intermittent, single-lane closures with flaggers and a pilot car, on SR 14, SR 141 and on the SR 141 Spur. Last Updated: 8/1/2014 9:50 AM More Info
From milepost 0 to milepost 30
MODERATE IMPACT
US 197 Both Directions - SR 14, US 197, SR 141 Klickitat County Chip Seal (SR 14 MP 67.10 to 102.32, SR 14 Spur MP 100.66 to 101.05, SR 141 mileposts 0.0 to 29.30 and SR 141 Spur MP 6.85 to 4.69) Monday, Aug. 4 to Friday, Aug. 8: Daytime, intermittent, single-lane closures with flaggers and a pilot car, on SR 14, SR 141 and on the SR 141 Spur. Last Updated: 8/1/2014 9:49 AM More Info
From milepost 1 to milepost 4
MODERATE IMPACT
SR 508 Both Directions - SR 508 to SR 7 - Paving and Sealing Road improvements (mileposts 0.20 to 32.84) Traffic Impacts: Monday, Aug. 4 to Friday, Aug. 8: Daytime, single-lane closures with pilot car for paving and sealing along SR 508, from 7 a.m. to 7 p.m. Last Updated: 8/1/2014 9:54 AM More Info
From milepost 0 to milepost 33
MODERATE IMPACT
SR 508 Both Directions - SR 508, Both directions at the South Fork Newaukum River Bridge (milepost 13.65) - Weight Resctriction Traffic Impacts: SR 508 is restricted to vehicles weighing more than seven tons. Trucks and large passenger vehicles should follow posted detour signs: Eastbound drivers, take Leonard Road to US 12. Westbound drivers, take Cinebar Road to Silver Creek Road/SR 122 to US 12. Last Updated: 3/14/2014 10:53 AM More Info
At milepost 14
MODERATE IMPACT
SR 522 Eastbound - Tuesday, July 29 to the morning of Thursday, August 21 - The SR 522 ramp to eastbound US 2 will be closed around-the-clock from 10 p.m. Tuesday, July 29 to 12:01 a.m. Thursday, August 21 for bridge repaving. Drivers will follow a short detour to access US 2. Last Updated: 7/28/2014 10:36 AM More Info
At milepost 25
LOW IMPACT
I-5 Both Directions - I-5 Paving, both directions, between Northeast 39th Street and 99th Street (mileposts 2.47 to 4.93) Monday, Aug. 4 to Wednesday, Aug. 6: Daytime, and nighttime, single and double-lane closures, with intermittent shoulder closures, on northbound I-5, from Northeast 39th Street to 99th Street, from 10 p.m. Monday, to 7 a.m. Wednesday. Thursday, Aug. 7 to Friday, Aug. 8: Nighttime, single and double-lane closures on I-5, northbound, from 10 p.m. Thursday, to 7 a.m. Friday. Last Updated: 8/1/2014 9:55 AM More Info
From milepost 2 to milepost 5
LOW IMPACT
I-5 Northbound - I-5, Northbound, Gee Creek Rest Area, Discovery Corridor Wastewater Transmission System (milepost 10.75) Friday, Aug. 1 to Monday, Aug. 4: Nighttime, full-lane closure of the left, southbound lane on I-5, between mileposts 13.74 to 12.88, Friday, from 9 p.m. to 8 a.m., Saturday, from 7 p.m. to 9 am., Sunday, 9 p.m. to 6 a.m. Monday, Aug. 4 to Friday, Aug. 8: Daytime narrow lanes with temporary striping and barriers at the entrance of the Gee Creek Rest Area for sewer line installation. Last Updated: 8/1/2014 9:31 AM More Info
At milepost 11
LOW IMPACT
I-5 Both Directions - I-5, N. Fork Lewis River Bridge - Painting (mileposts 19.83 to 20.08) Traffic Impacts: Monday, Aug. 1 to Saturday, Aug. 9: Daytime and nighttime, single-lane closures on both directions of I-5. NOTE: The posted speed limit will be reduced to 60 mph, both directions, throughout the construction zone. Workers will be present and working beyond the shoulder during daylight hours, 7 days a week. Last Updated: 8/1/2014 9:20 AM More Info
From milepost 20 to milepost 21
LOW IMPACT
I-5 Both Directions - Salmon Creek Interchange Project (I-205, mileposts 36.07 to 36.83 and I-5 mileposts 6.95 to 9.51) Sunday, Aug. 3 to Wednesday, Aug. 6: Nighttime, alternating single-lane closures on both directions of I-205 and I-5. Sunday, Aug. 3 to Wednesday, Aug. 6: Nighttime, ramp closures, both on and off-ramps at NE 134th Street and I-205, and both on-and off-ramps at NE 139th Street and I-5. Last Updated: 8/1/2014 8:26 AM More Info
From milepost 7 to milepost 10
LOW IMPACT
I-5 Both Directions - I-5, NE 179th Street to N. Fork Lewis River Bridge - Paving (mileposts 9.51 to 19.46) Traffic Impacts: No scheduled traffic impacts. Last Updated: 7/3/2014 9:12 AM More Info
From milepost 10 to milepost 20
LOW IMPACT
I-90 Both Directions - I-90 Snoqualmie Pass milepost 61 to 65 nightly single lane closures can be expected both directions Monday through Friday, from 10 p.m. until 9 a.m. There will be intermittent short term ramp closures at the Cabin Creek and Stampede Pass Interchanges at night from 10 p.m. until 9 a.m. August 4 and 5 the eastbound off and on ramps at Stampede Pass Interchange will be closed from 10 p.m. until 9 a.m. Last Updated: 7/31/2014 4:28 PM More Info
From milepost 61 to milepost 65
LOW IMPACT
I-90 Both Directions - Drivers should expect lane restrictions from 7 p.m. in the evening until 6 a.m. the following morning. Possible slow traffic during those hours. Work will be underway 6 days per week. Drivers should be alert for grooved pavement all hours. The legal speed limit on grooved pavement is 60 mph. Drivers should watch for reduced legal speed signs. Motorcyclists should use extreme caution on grooved pavement. Last Updated: 7/21/2014 8:10 AM More Info
From milepost 294 to milepost 300
LOW IMPACT
I-205 Both Directions - Salmon Creek Interchange Project (I-205, mileposts 36.07 to 36.83 and I-5 mileposts 6.95 to 9.51) Sunday, Aug. 3 to Wednesday, Aug. 6: Nighttime, alternating single-lane closures on both directions of I-205 and I-5. Sunday, Aug. 3 to Wednesday, Aug. 6: Nighttime, ramp closures, both on and off-ramps at NE 134th Street and I-205, and both on-and off-ramps at NE 139th Street and I-5. Last Updated: 8/1/2014 8:27 AM More Info
From milepost 36 to milepost 38
LOW IMPACT
US 2 Both Directions - Monday through Thursday, 6 a.m. to 8 p.m., expect lane shifts and shoulder closures in the four lane section. This week, crews continue grinding pavement in preparation for paving. Speed through the work zone is reduced to 45. When an outside lane and shoulder needs to be closed, bicyclists and pedestrians are being bussed around the work zone. Last Updated: 8/1/2014 11:17 AM More Info
From milepost 64 to milepost 72
LOW IMPACT
US 2 Northbound - Right lane closed Division St northbound, in Spokane just north of Spokane River, 7:00 am until about 5:00 pm weekdays, through August 11, 2014. Last Updated: 7/31/2014 4:09 PM More Info
At milepost 288
LOW IMPACT
US 2 Both Directions - Paving is underway evenings and overnight hours, from about 7 p.m. until as late as 6 a.m. the following morning. Drivers should be alert for single-lane traffic directed by flaggers and pilot cars with delays up to 20 minutes. Drivers should be very alert for grooved pavement and abrupt lane edges. Motorcyclists need to use extreme caution on grooved surfaces and abrupt lane edges. Last Updated: 7/3/2014 10:30 AM More Info
From milepost 306 to milepost 316
LOW IMPACT
US 101 Both Directions - US 101 traffic will shift to a new alignment for 1.5 miles east of Port Angeles while crews work on an old highway segment. Two lanes will remain open to traffic. Speed limits through the area are reduced to 45 miles per hour. Last Updated: 7/22/2014 2:36 PM More Info
From milepost 257 to milepost 259
LOW IMPACT
US 101 Both Directions - US 101 - Middle Nemah River Bridge Replacement (mileposts 33.04 to 33.99) Traffic Impacts: No scheduled traffic impacts. Last Updated: 5/16/2014 9:06 AM More Info
From milepost 33 to milepost 34
LOW IMPACT
US 101 Both Directions - US 101, Astoria Megler Bridge Painting Project (milepost 0.00 to 0.72) – ODOT A 35 mph speed limit through the construction zone will be maintained for the duration of the project. Expect single-lane traffic and 20-minute delays anytime on weekdays and weekends. Last Updated: 1/19/2012 11:49 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 4 Both Directions - SR 4, Elochoman River Vic. Culvert Replacement (mileposts 33.89 to 34.14) Traffic Impacts: Monday, Aug. 4 to Friday, Aug. 8: Daytime, single-lane and shoulder closures. Last Updated: 8/1/2014 9:59 AM More Info
From milepost 34 to milepost 35
LOW IMPACT
SR 4 Both Directions - SR 4, Ocean Beach Highway Sanitary Sewer Replacement (mileposts 60.3 to 60.8) Sunday, Aug. 3 to Friday, Aug. 8: Daytime, and nighttime, single-lane closures, westbound on Ocean Beach Highway, between Washington Way and 9th Avenue, from 9:30 p.m. Sunday, Aug, 3 to 8 a.m. Friday, Aug. 8. Last Updated: 8/1/2014 9:32 AM More Info
From milepost 60 to milepost 61
LOW IMPACT
SR 6 Both Directions - SR 6, Willapa River Bridge - Bridge Replacement (mileposts 6.86 to 7.26) Traffic Impacts: Monday, Aug. 4 to Thursday, Aug. 7: No scheduled traffic impacts. Thursday, July 3: Starting Thursday, July 3, the speed limit on SR 6 will return to 55 mph. Last Updated: 8/1/2014 8:50 AM More Info
From milepost 7 to milepost 8
LOW IMPACT
SR 14 Both Directions - SR 14 at Bridge of the Gods (milepost 41.6) Drivers crossing the Bridge of the Gods should expect intermittent delays of up to 20 minutes. Last Updated: 4/4/2014 1:34 PM More Info
At milepost 42
LOW IMPACT
SR 105 Both Directions - SR 105, Smith Creek and North River - Bridge Replacements (mileposts 6.25 to 13.65) Traffic Impacts: Sunday, Aug. 2 to Saturday, Aug. 9: Daytime, intermittent, single-lane closures with flagger. The speed limit is 55 mph in the project area. Last Updated: 8/1/2014 8:29 AM More Info
From milepost 6 to milepost 14
LOW IMPACT
SR 215 Both Directions - Monday through Wednesday (no work Thursday for the Stampede), 7 a.m. to 5 p.m., expect lane shifts, shoulder closures and pedestrian detours as crews continue to upgrade sidewalks in Okanogan. Night work: Paving begins this week and requires lane shifts or closures with some alternating one-lane flagger controlled traffic. Last Updated: 8/1/2014 11:20 AM More Info
From milepost 0 to milepost 7
LOW IMPACT
SR 410 Both Directions - SR 410 milepost 26 to 57.5: Friday, motorists can expect one lane flagger controlled traffic with delays of 15 minutes during daylight hours, and until 4 p.m. on Fridays. Note: There will be no project activity on Thursday, July 31 allowing for unrestricted access for the Ramrod Bicycle event. Last Updated: 7/31/2014 4:26 PM More Info
From milepost 26 to milepost 58
LOW IMPACT
SR 410 Both Directions - East of Chinook Pass summit: Work has been completed for the week. Last Updated: 7/31/2014 4:25 PM More Info
From milepost 69 to milepost 71
LOW IMPACT
SR 411 Both Directions - SR 411, City of Kelso - West Main Street Realignment (mileposts 1.50 to 1.75) Traffic Impacts: Monday, Aug. 4 to Friday, Aug. 8: No scheduled traffic impacts. NOTE: Access on SR 411 between Washington and Grant is now open to through-traffic. The intersection of SR 411 and Main Street/Allen Street is controlled by a four-way stop. Last Updated: 8/1/2014 2:39 PM More Info
From milepost 2 to milepost 2
LOW IMPACT
SR 411 Both Directions - SR 411, City of Castle Rock - Front Avenue Improvement (mileposts 12.6 to 13.2) Traffic Impacts: No scheduled traffic impacts. Last Updated: 12/20/2013 8:44 AM More Info
From milepost 13 to milepost 14
LOW IMPACT
SR 433 Both Directions - SR 433 at the Lewis and Clark Bridge (milepost 0.0) Traffic Impacts: Monday, Aug. 4 to Friday, Aug. 8: Daytime, lane shifts on both directions of SR 433, and right shoulder closures, with traffic control for utilities work. There will be wide-load restrictions in place. Last Updated: 8/1/2014 8:25 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 502 Both Directions - SR 502 Widening from I-5 to Battle Ground (MP 0.59 to 6.61) Friday, Aug. 1 to Monday, Aug. 4: Full weekend closures of NE 50th Avenue at SR 502, from 8 p.m. Friday, Aug. 1 to 6 a.m. Monday, Aug. 4. Saturday, Aug. 2: Daytime, single-lane closures with flaggers, throughout the 6 mile length of the project limits, from 6 a.m. to 2 p.m. Sunday, Aug. 3 to Friday, Aug. 8: Multiple, daytime, and nighttime, intermittent, single-lane closures with flaggers, throughout the 6 mile length of project limits. Last Updated: 8/1/2014 9:29 AM More Info
From milepost 1 to milepost 7
LOW IMPACT
SR 504 Both Directions - SR 504, Both directions between Hummocks Trail east to Loowit viewpoint (mileposts 45.0 to 52.0) SR 504 has been closed for the winter season starting Saturday, Nov. 16. Last Updated: 11/22/2013 2:34 PM More Info
From milepost 45 to milepost 52
LOW IMPACT
SR 507 Both Directions - SR 507, Yew Street Intersection Improvements (mileposts 0.22 to 0.32) Traffic Impacts: Monday, Aug. 4 to Friday, Aug. 8: No scheduled traffic impacts. Last Updated: 8/1/2014 9:58 AM More Info
From milepost 0 to milepost 1
LOW IMPACT
SR 530 Both Directions - Monday, July 28 to Saturday, August 2 - Traffic will be flagged through in both directions of SR 530 in Oso from 6 a.m. to 6 p.m. daily to allow trucks to load and unload material. Wait times have typically been about 5 minutes. Last Updated: 7/24/2014 7:54 AM More Info
From milepost 36 to milepost 39
LOWEST IMPACT
I-90 Both Directions - I-90 Easton Hill paving MP 65 to 67: Work will resume in the summer of 2014. Last Updated: 7/31/2014 7:35 AM More Info
From milepost 65 to milepost 67
LOWEST IMPACT
I-90 Both Directions - Bicycle Alternate Route: I-90 is closed to bicycles in both directions between Hyak (Exit 54) and Stampede Pass interchange (exit 62) because there is no shoulder for bicycles to use. Bicyclists can use the John Wayne Pioneer Trail, weather permitting, as an alternate route. Last Updated: 7/28/2014 8:51 AM More Info
From milepost 54 to milepost 62
LOWEST IMPACT
US 2 Both Directions - Chip seal is underway. Drivers should expect delays at work locations with flaggers and pilot cars directing single lane, alternating traffic. Motorists should be alert for loose gravel in some areas. Motorcyclists should use extreme caution. Last Updated: 7/21/2014 8:08 AM More Info
From milepost 230 to milepost 251
LOWEST IMPACT
SR 6 Both Directions - SR 6, Rock Creek East and West Bridges - Replacement (mileposts 25.95 to 26.94) Traffic Impacts: Friday, Aug. 1 to Tuesday, Aug. 5: Around-the-clock, single-lane closures with flaggers for earthwork on HWY 6 and McCormick Road. Traffic will be shifted to a detour bridge by end of day, Tuesday, Aug. 5. Wednesday, Aug. 6 to Friday, Aug. 8: Daytime, single-lane closures with flaggers. Last Updated: 8/1/2014 9:23 AM More Info
From milepost 26 to milepost 27
LOWEST IMPACT
SR 20 Both Directions - Chip seal is underway. Drivers should expect delays at work locations with flaggers and pilot cars directing single lane, alternating traffic. Motorists should be alert for loose gravel in some areas. Motorcyclists should use extreme caution. Last Updated: 7/24/2014 10:44 AM More Info
From milepost 421 to milepost 437
LOWEST IMPACT
SR 211 Both Directions - Chip seal is underway. Drivers should expect delays at work locations with flaggers and pilot cars directing single lane, alternating traffic. Motorists should be alert for loose gravel in some areas. Motorcyclists should use extreme caution. Last Updated: 7/24/2014 10:52 AM More Info
From milepost 0 to milepost 16
LOWEST IMPACT
SR 225 Both Directions - State Route 225 through Benton City will be closed Saturday, Aug. 2 for the Benton City Daze Parade. Detour is available via local roads. Last Updated: 8/1/2014 7:13 PM More Info
From milepost 1 to milepost 2
LOWEST IMPACT
SR 401 Both Directions - SR 401, Both directions, between Megler Ferry Landing and Mile Post Marker 3.00 (mileposts 1.70 to 3.21) Monday, Aug. 4 to Friday, Aug. 8: Daytime, single-lane and shoulder closures for roadside maintenance. Last Updated: 8/1/2014 10:00 AM More Info
From milepost 2 to milepost 4
LOWEST IMPACT
SR 411 Both Directions - SR 411 - Huntington Avenue Sidewalk Improvements (mileposts 12.46 to 12.7) Traffic Impacts: Monday, Aug. 4 to Friday, Aug. 8: No scheduled traffic impacts. Last Updated: 8/1/2014 9:22 AM More Info
From milepost 12 to milepost 13