Travel Alerts South Central Washington

Travel Alerts
LOW IMPACT
US 97 Both Directions - US 97 milepost 46: Traffic will be reduced to single-lane alternating traffic. Pilot car will escort drivers through the 35 mph work zone. Drivers can expect delays up to 20 minutes as crews work seven days a week, both day and night.
Last Updated: 5/16/2013 5:52 AM
From milepost 44 to milepost 47
Report Detail
US 97 / Satus Creek Vicinity – Replace Br. 97/106 and Paving Contact: Moe Davari, WSDOT Project Engineer (509) 222-2402 Construction Begins: Spring 2012 Scheduled Completion: Fall 2012 Project Description: The US 97 / Satus Creek Vicinity – Replace Br. 97/106 and Paving project will construct a new bridge to current standards, preserving route continuity and improve safety. The project will also realign and widen this section of highway and restore signing, striping and other safety features. Traffic will be driving on a temporary bridge while the new structure is constructed.
Traffic Cameras
There are no traffic cameras in this vicinity.
Central
South West
Zoom to Tri Cities
South East
Alerts Legend

Zoom in on the map to view more routes.

If you do not see the route you are looking for,
no problems have been reported.

Interstate:
I-82 
US Highways:
State Highways:
Countywide:
No Travel Alerts have been reported at this time.