Southwest Washington Travel Alerts

Travel Alerts
MODERATE IMPACT
SR 503
SR 503 Both Directions - Construction on SR 503 both directions at milepost 1.2 near 87th Street the right lane is closed beginning at 9:19 pm on September 20, 2018 until further notice.
Last Updated: 9/20/2018 9:27 PM
At milepost 1 More
MODERATE IMPACT
SR 503
SR 503 Both Directions - Monday, Sept. 17 to Friday, Sept. 21: Travelers on both directions of SR 503/SR 503 Spur between Northeast Rock Creek Road and Williams Road will alternate through a single lane, with flaggers and a pilot car, daily from 6:30 a.m. to 7 p.m., for chip sealing and paving work.
NOTE: All work is weather dependent.
Last Updated: 9/14/2018 1:21 PM
From milepost 14 to milepost 31 More
LOW IMPACT
SR 503
SR 503 Both Directions - Monday, Sept. 17 to Friday, Sept 21: Travelers on both directions of SR 503/SR 503 Spur between Northeast Rock Creek Road and Williams Road will alternate through a single lane, with flaggers and a pilot car, daily from 6:30 a.m. to 7 p.m., for chip sealing and paving work. NOTE: Travelers should expect delays of up to 20 minutes during construction on SR 503 and on the SR 503 Spur, and significantly longer delays on cross streets when paving occurs at the intersections.
Last Updated: 9/14/2018 3:40 PM
From milepost 14 to milepost 31 More
LOW IMPACT
SR 503
SR 503 Both Directions - Monday, Sept. 17 to the morning of Sunday, Sept. 23: Travelers on both directions of SR 503, between Northeast 87th Street and Northeast 95th Street will be shifted to a single-lane, nightly, from 6 p.m. to 5 a.m., for drainage replacement work.
NOTE: One lane in each direction will remain open.
NOTE: Pedestrians and cyclists should watch for advanced signage, and will be guided by traffic control to either the northbound or southbound side of the work zone, nightly, from 6 p.m. to 5 a.m.
Last Updated: 9/14/2018 1:27 PM
From milepost 1 to milepost 2 More
LOW IMPACT
SR 503
SR 503 Both Directions - Monday, Sept. 17 to Friday, Sept. 21: Traffic on both directions of SR 503, between Northeast Caples Road and Northeast 154th Street, will be reduced to a single-lane, with flaggers, daily, from 6 a.m. to 6 p.m., for construction of bus/truck pullout lanes.
NOTE: During construction a single-lane on both directions of SR 503 will remain open through the work zone.
NOTE: All work is weather dependent.
Last Updated: 9/14/2018 1:25 PM
From milepost 4 to milepost 5 More
Western
Zoom to Vancouver Zoom to East Clark County Zoom to Centralia/Chehalis Zoom to East Clark County
South Central
Alerts Legend

Zoom in on the map to view more routes.
If you do not see the route you are looking for,
no problems have been reported.

Interstate:
I-5  I-205 
US Highways:
State Highways:
Countywide:
No Travel Alerts have been reported at this time.