US 395 was resurfaced with hot mix asphalt. ADA sidewalk work was included. Some minor corrective items remain. Central Washington Asphalt of Moses Lake, WA handled the project with a construction bid of $3,491,873.
High traffic volumes with normal wear and tear had deteriorated the pavement surface. Resurfacing provides a better experience for drivers with a reduced need for repairs and patching.
The project was mostly constructed during 2017. A few corrective items remained as of March 27, 2018. The project was completed in September 2018.
Financial Data for PIN 639522T
Amount ($ in thousands)
Mark Allen, Project Engineer
WSDOT Eastern Region
2714 N. Mayfair
Spokane, WA 99207