Southeast Washington Cameras

Alerts

As of 8/24/2019 1:47 AM
Blocking Incidents
  • Schrag rest area on I-90 at MP 198 is open in both directions with portable toilets but no water available, about 22 miles west of Ritzville. beginning at 11:25 am on July 12, 2019 until further notice.
Construction Closures
  • SR 28 between Ephrata and Soap Lake (MP 44 to 53)- Monday through Friday 7 a.m. to 7 p.m., expect delays up to 20 minutes with lane shifts and alternating 1-way traffic through Ephrata and between the north end of Ephrata and Soap Lake where the contractor is installing pavement markers, signage and guideposts.
  • On I-90 east of Blue Heron Park near Moses Lake (milepost 175-176), Monday - THursday from 6 a.m. to 4:30 p.m., expect lane closures and a reduced speed zone of 55 mph where a bridge maintenance crew is repairing the concrete bridge slab edges. Speed limit returns to 70 mph during non-working hours.
  • SR-129 milepost 1: A traffic signal is in place to monitor single lane closures 24 hours a day.
    Caution: Steep grade. Width restrictions in effect.
  • US-12 milepost 340: Traffic detour, US-12 to the Isaacs Avenue exit, to Mill Creek Road to Interchange Road and back onto westbound US-12.

    US-12 Bridge over E. Isaacs Ave. milepost 341: Wednesday, Aug. 28, traffic should be prepared for alternating one way traffic during daytime hours. Minimal delays are anticipated.
  • SR-224 milepost 5 vicinity: Monday, Aug. 26 from 6 A.M. to 5 P.M., the City’s contractor will be constructing a slip lane to divert both lanes of traffic around work site.
    Wednesday, Aug. 28 to Friday, Aug. 30, from 6 A.M. to 5 P.M., the City will divert traffic onto slip lane and install underground utilities across SR- 224.
  • US-395 northbound milepost 44: Monday Aug 26 from 8 a.m. to 3 p.m. there will be a left lane closure for bridge deck repairs. Tuesday Aug. 27 from 8 a.m. to 3 p.m. there will be a right lane closure for bridge deck repair.
    US-395 southbound milepost 44: Wednesday Aug. 28 from 8 a.m. to 3 p.m. there will be a right lane closure for bridge deck repair. Thursday Aug. 29 from 8 a.m. to 3 p.m. there will be a left lane closure for bridge deck repair.
  • SR-240 all directions milepost 28: Sunday Aug. 25 from 7 a.m. to 5 p.m. there will be single lane flagged traffic for traffic light revisions.
Special Events
  • None reported