Emergency alert symbol

COVID-19

For the latest COVID-19 health guidance, statistics and resources, visit Coronavirus.wa.gov.

Return to Map

HIGHEST IMPACT
SR 167 Northbound - Update 8:19 PM : On SR 167 northbound just south of I-405 (MP 26) there is a collision partially blocking the right lane. Tow Assistance and the State Patrol have arrived on the scene. Last Updated: 9/25/2021 8:19 PM More Info
At milepost 26
HIGHEST IMPACT
I-405 Northbound - Update 8:14 PM : On I-405 northbound just north of SR 181 (MP 1) there is a collision blocking the 2 right lanes. Medical Aid, Fire Assistance, and the State Patrol have arrived on the scene. Last Updated: 9/25/2021 8:14 PM More Info
At milepost 1
HIGHEST IMPACT
I-5 Southbound - Update 7:47 PM : On I-5 southbound just south of SR 529 (MP 198) there is a collision blocking the left lane. The State Patrol has arrived on the scene. Last Updated: 9/25/2021 7:47 PM More Info
At milepost 198
HIGH IMPACT
SR 19 Both Directions - Road work on SR 19 both directions from milepost 9 near Chimacum Rd to milepost 9.5 near West Valley Rd beginning at 1:33 pm on September 25, 2021 until about 7:00 pm. Last Updated: 9/25/2021 1:33 PM More Info
From milepost 9 to milepost 10
HIGH IMPACT
US 197 Both Directions - Beginning Thursday, Sept. 9, 2021, until Memorial Day 2022: The US 197 - Dalles Bridge will be fully closed between Washington and Oregon from 8 p.m. Thursday nights through 6 a.m., Monday mornings, for bridge deck replacement work.

Note:
During the full weekend bridge closures, travelers will follow a signed detour using the US 97 Biggs Junction Bridge. These closures will occur every weekend until Memorial Day 2022. Last Updated: 9/24/2021 10:27 AM More Info
From milepost 3 to milepost 1
HIGH IMPACT
SR 105 Both Directions - From 8 a.m. to 7 p.m. Monday and Tuesday, Sept. 27-28, travelers can expect one-way alternating traffic on SR 105 for a safety enhancement project. Travelers are encouraged to plan additional time to help prevent delays. Last Updated: 9/23/2021 9:33 AM More Info
From milepost 44 to milepost 44
HIGH IMPACT
SR 3 Both Directions - Work to help return Chico Creek under SR 3 to a more natural state is about to get underway. As soon as Monday, Sept. 27, crews working for WSDOT will install orange signs in and around the Chico Way interchange near Bremerton to notify users that construction is imminent. Travelers using both directions of the highway will see lanes shifted to the outside shoulders of SR 3 and night ramp closures. Last Updated: 9/20/2021 8:09 AM More Info
At milepost 41
HIGH IMPACT
US 2 Both Directions - On US 2/97 near Cashmere (milepost 110), Eastbound off ramp and westbound turn lane to W. Cashmere Bridge/Goodwin Rd. are closed. The road will be torn up and a crew builds a roundabout just north of Vale Road. Traffic will be shifted around the work area and travelers can expect flagger controlled traffic during working hours. Plan for construction in the Hay Canyon area to continue through the year. Last Updated: 9/20/2021 8:01 AM More Info
From milepost 110 to milepost 110
HIGH IMPACT
US 97 Both Directions - On US 97 between milepost 159 and 160 (Swauk campground), Tuesday through Thursday from 6 a.m. to 6 p.m. expect flagger controlled traffic with delays up to 20 minutes as the contractor is performing shoulder repair. A reduced speed zone is in place 24/7 through the project work site while the contractor completes construction. Last Updated: 9/19/2021 4:42 PM More Info
From milepost 159 to milepost 161
HIGH IMPACT
I-5 Northbound - Monday, September 20, to the morning of Tuesday, September 28 –on northbound I-5 between MP 166.9 and 168.10 the two left lanes will be closed from 8 p.m. to 5 a.m. nightly. Last Updated: 9/17/2021 11:49 AM More Info
From milepost 167 to milepost 169
HIGH IMPACT
SR 6 Both Directions - Beginning Oct. 5, 2020 through Sept. 2021: Travelers in both directions of SR 6, near Twin Oaks Road can expect traffic switched to a 2-lane 25 mph detour bypassing the closure.  Work includes excavation for bridge piers, bridge construction and culvert removal/installation. Last Updated: 9/17/2021 9:31 AM More Info
From milepost 46 to milepost 47
HIGH IMPACT
SR 11 Both Directions - 6 p.m. on Friday, Sept. 24 through 6 a.m. on Monday, Sept. 27 - Intersection of SR11 and 30th Street will be fully closed. Last Updated: 9/15/2021 5:13 PM More Info
At milepost 21
HIGH IMPACT
SR 99 Both Directions - Starting Oct. 1 toll rates in the SR 99 tunnel will increase. The current weekday peak Good To Go! rate of $2.25 will increase to $2.60, and the weekday peak Pay By Mail rate of $4.25 will rise to $4.60. Drivers with a Good To Go! pass will continue to pay the lowest toll rate. Last Updated: 9/15/2021 9:44 AM More Info
From milepost 30 to milepost 33
HIGH IMPACT
SR 520 Both Directions - Flammable cargo is prohibited on SR 520 eastbound & westbound from Montlake Blvd (MP 1) to 84th Ave NE (MP 5). Last Updated: 9/13/2021 7:00 AM More Info
From milepost 1 to milepost 5
HIGH IMPACT
I-5 Southbound - Beginning Monday, Aug. 30, until further notice: Up to two lanes of southbound I-5 will close nightly, between East Fork Lewis River at milepost 18.0 and North Fork Lewis River at milepost 20.0, from 7 p.m. to 7 a.m., for paving and concrete panel replacement work.

Note: Travelers should plan ahead for significant delays. For your safety, reduce your speed and stay focused when entering and traveling through the work zone. The speed limit is reduced to 55 mph throughout the project limits. Last Updated: 8/30/2021 2:25 PM More Info
From milepost 18 to milepost 20
HIGH IMPACT
I-90 Both Directions - Construction at the intersection of Geiger Blvd. and Grove Road beginning on August 2, until further notice. Construction includes the third roundabout of the I-90 Geiger interchange improvements project just north of I-90. Drivers will need to follow signed detours. Last Updated: 7/30/2021 3:34 PM More Info
At milepost 276
HIGH IMPACT
SR 164 Both Directions - Monday, July 12 – SR 164 between 176th Way Southeast and Southeast 413th Place will fully close for both directions of traffic for 90 days beginning at 8 a.m. Monday, July 12. Signed detours will be in place. Last Updated: 7/11/2021 12:25 PM More Info
From milepost 8 to milepost 9
HIGH IMPACT
I-90 Eastbound - The Freya Street on-ramp to eastbound I-90 will close beginning at 7:00 pm on June 28, 2021 until about 5:00 pm on September 19, 2021. The closure is part of the paving project between Hamilton Street interchange to the Sprague interchange on I-90. Last Updated: 6/25/2021 12:34 PM More Info
At milepost 284
HIGH IMPACT
I-5 Both Directions - Wednesday, June 23 – The southbound lanes of I-5 on the Stillaguamish River Bridge are closed long-term for construction. Traffic in both directions will share specially configured northbound lanes of I-5 during this closure between 236th Street Northeast and the SR 530 interchange. Last Updated: 6/25/2021 7:49 AM More Info
At milepost 209
HIGH IMPACT
I-90 Both Directions - Various lane and ramp closures on I-90 both directions from milepost 295.7 near Harvard Rd Off-Ramp to milepost 296.6 near Harvard Rd Off Ramp until further notice. Crews will be widening the Harvard Road overpass. Expect nightly closures of various ramps at the interchange and to I-90. Last Updated: 6/23/2021 7:41 AM More Info
From milepost 296 to milepost 297
MODERATE IMPACT
SR 501 Eastbound - Maintenance on SR 501 eastbound from milepost 2.2 near 26th Street to milepost 1.3 near Thompson Avenue. Left lane is closed through the work zone, use caution beginning at 7:40 pm on September 25, 2021 until further notice. Last Updated: 9/25/2021 7:40 PM More Info
From milepost 2 to milepost 2
MODERATE IMPACT
SR 18 Both Directions - On SR 18 eastbound & westbound from West Valley Hwy (MP 2) to Auburn Way (MP 4) the left lanes are closed due to roadwork. Last Updated: 9/25/2021 7:40 AM More Info
From milepost 2 to milepost 4
MODERATE IMPACT
SR 410 Both Directions - SR 410 Chinook Pass remains open in both directions: Due to fire activity east of the pass, SR 410 travelers may also encounter areas of dense smoke, poor visibility at times, and fire equipment and crews working near the roadway. Delays are possible. Last Updated: 9/25/2021 7:13 AM More Info
From milepost 69 to milepost 74
MODERATE IMPACT
I-90 Both Directions - I-90 milepost 34 to 136, North Bend to Vantage: There are a number of maintenance and construction work zones between North Bend and Vantage. Motorists will experience minor delays this week due to lane closures and intermittent rolling slowdowns. Pay attention and slow down as you enter and exit our work zones. Last Updated: 9/24/2021 7:23 PM More Info
From milepost 34 to milepost 136
MODERATE IMPACT
I-5 Southbound - Monday, September 27, to the morning of Thursday, September 30 – northbound I-5 two left lanes between Mercer Street and Roanoke will be closed from 8 p.m. to 5 a.m. nightly. Last Updated: 9/24/2021 3:38 PM More Info
From milepost 167 to milepost 169
MODERATE IMPACT
I-5 Southbound - Southbound I-5 exit to 56th Street and the 56th Street on-ramp to southbound I-5 will close from 10 p.m. Tuesday, Sept. 28 to 5 a.m. Wednesday, Sept. 29 for construction. Last Updated: 9/24/2021 2:18 PM More Info
From milepost 131 to milepost 131
MODERATE IMPACT
I-5 Northbound - 56th Street on-ramp to northbound I-5 and the northbound I-5 exit to 56th Street will close from 10 p.m. Monday, Sept. 27 to 5 a.m. Tuesday, Sept. 28 for construction. Last Updated: 9/24/2021 2:14 PM More Info
From milepost 130 to milepost 131
MODERATE IMPACT
SR 3 Northbound - From 8 a.m. to 3 p.m. Monday, Sept. 27, crews will close the northbound SR 3 exit to SR 303 for guardrail repair. Travelers will follow alternate routes. Last Updated: 9/24/2021 2:02 PM More Info
At milepost 46
MODERATE IMPACT
I-5 Southbound - Southbound I-5 exit to Berkeley Street and Thorne Lane will close from 10:30 p.m. Saturday, Sept. 25 to 8:30 a.m. Sunday, Sept. 26 for construction. Drivers will detour south to 41st Division Drive and return north on I-5 to Thorne Lane. Last Updated: 9/24/2021 1:51 PM More Info
From milepost 124 to milepost 124
MODERATE IMPACT
I-5 Northbound - Northbound I-5 exit to Berkeley Street and the Berkeley Street on-ramp to northbound I-5 will close from 10:30 p.m. Saturday, Sept. 25 to 8:30 a.m. Sunday, Sept. 26 for construction. Last Updated: 9/24/2021 1:48 PM More Info
From milepost 122 to milepost 123
MODERATE IMPACT
SR 20 Both Directions - Monday, Sept. 20 through Friday, Oct. 7 – A lane in both directions of SR 20 at the Deception Pass Bridge will be closed each weekday overnight from 8 p.m. to 6 a.m. Last Updated: 9/24/2021 10:20 AM More Info
At milepost 42
MODERATE IMPACT
SR 20 Both Directions - Eastbound & westbound traffic is alternating on SR 20 at Grassmere Rd (MP 87) due to roadwork. Last Updated: 9/24/2021 9:50 AM More Info
At milepost 87
MODERATE IMPACT
SR 20 Both Directions - From 7 a.m. to 4:30 p.m. Monday through Thursday, Sept. 27-30, expect a slow moving vehicle in both directions of SR 20 approaching the Port Townsend ferry terminal for mowing. Crews will pull over as needed to let traffic pass. Please slow down in work zones and watch for road crews. Last Updated: 9/23/2021 4:35 PM More Info
From milepost 0 to milepost 10
MODERATE IMPACT
SR 104 Eastbound - From 7 a.m. to 4:30 p.m. Monday and Tuesday, Sept. 27-28, expect an eastbound single lane closure near Shine Road for hazard tree removal. Crews may need to temporarily pause traffic to remove debris, but will reopen and clear as quickly as possible. Expect delays through the area and plan ahead. Last Updated: 9/23/2021 4:30 PM More Info
From milepost 12 to milepost 12
MODERATE IMPACT
US 2 Both Directions - Lane closures for road work on Hayford Road North of US 2 both directions at milepost 279. at the Hayford Rd intersection, Airway Hts. beginning at 7:03 am on September 20, 2021 until further notice. Use other routes, expect delays. Last Updated: 9/20/2021 8:24 AM More Info
At milepost 279
MODERATE IMPACT
SR 9 Both Directions - Friday, Sept. 17 through Friday, Sept. 30 - A lane in both directions of SR 9 just south of Devil's Creek Road over Lake Creek will be closed 24 hours each day during this timeframe. Traffic will be alternated through a 24-hour automated signal. Last Updated: 9/17/2021 7:43 PM More Info
At milepost 44
MODERATE IMPACT
Belt Both Directions - The City of Spokane will close Belt Street from Boone Ave. to Maxwell Ave. in both directions, part of an arterial grind and inlay project. Last Updated: 9/17/2021 2:40 PM More Info

MODERATE IMPACT
Wall Both Directions - Construction for the Spokane Transit City Line will occur on North Wall Street between West Riverside Avenue and West Main Avenue. North Wall Street is currently closed. Last Updated: 9/17/2021 2:35 PM More Info

MODERATE IMPACT
I-5 Northbound - Monday, September 20, to the morning of Monday, September 27 –The Right shoulder on the express lanes between mile post 167 and 168.8 will be closed 24 hours each day. Last Updated: 9/17/2021 1:14 PM More Info
From milepost 168 to milepost 169
MODERATE IMPACT
I-5 Southbound - Monday, September 20, to the morning of Monday, September 27 –Southbound I-5 to Mercer Street will have one right and left lane on the ramp will be closed from 12 p.m. to 4 a.m. nightly. Last Updated: 9/17/2021 1:11 PM More Info
From milepost 16 to milepost 168
MODERATE IMPACT
Wellesley Av Both Directions - Spokane County will have lane closures for road work, on Wellesley Ave between Railroad Ave and Murray Road, starting on September 17th through November 30, 2021. Watch for flaggers. road closures, lane restrictions. and detour route, Expect delays, use other routes. Last Updated: 9/12/2021 5:27 PM More Info

MODERATE IMPACT
US 101 Both Directions - Crews have begun a slope stabilization project along US 101 near Cosmopolis. Expect traffic to alternate with a temporary signal through spring 2022. Since the slide was discovered, the roadway has dropped more than five feet. Most work will take place away from the highway, near the embankment. Last Updated: 9/9/2021 12:01 PM More Info
From milepost 78 to milepost 79
MODERATE IMPACT
US 101 Both Directions - Crews have begun a new slope stabilization project along US 101 near Cosmopolis. Expect alternating traffic with a temporary signal through summer 2022. Any highway closures will be announced in advance. Most slope work will take place away from the road. Last Updated: 9/9/2021 11:34 AM More Info
From milepost 78 to milepost 79
MODERATE IMPACT
US 2 Eastbound - Rest Area is closed on US 2 eastbound at milepost 237.71 near Telford Rd beginning at 3:59 pm on September 3, 2021, until further notice. Last Updated: 9/3/2021 4:03 PM More Info
At milepost 238
MODERATE IMPACT
SR 512 Both Directions - Travelers using SR 512 near the state fairgrounds in Puyallup may see occasional delays during daytime and evening hours Friday, Sept. 3 through Sunday, Sept. 26. Last Updated: 9/2/2021 3:16 PM More Info
From milepost 8 to milepost 11
MODERATE IMPACT
Howard Both Directions - The City of Spokane will close Howard Street between Mallon and Boone Avenue in both directions beginning on Tuesday, August 17, for two and half weeks. Work is part of a grind and inlay of the roadway. Last Updated: 8/13/2021 2:56 PM More Info

MODERATE IMPACT
Spokane Falls Both Directions - Closure on Spokane Falls from Pine St to Sherman St in both directions until further notice. Spokane Transit Authority will have ongoing construction for the new City Line. Last Updated: 8/4/2021 8:47 AM More Info

MODERATE IMPACT
US 101 Both Directions - The City of Port Angeles is adding bike lanes, improved pedestrian crossings and transit stops along S Lincoln St/US 101 in downtown Port Angeles. Expect weekday daytime construction through late fall 2021. Questions about this project should be sent to publicworks@cityofpa.us. Last Updated: 7/15/2021 5:46 PM More Info
From milepost 248 to milepost 248
MODERATE IMPACT
SR 290 Both Directions - Lane Closures for construction on SR 290 in both directions at milepost 12.5 at Barker Rd, Spokane Valley, the Eastbound Exit to Wellesley Ave will also be closed, beginning at 10:49 am on March 17, 2021, until August 2022. Use other routes and expect long delays at times. Last Updated: 4/30/2021 1:26 PM More Info
At milepost 12
MODERATE IMPACT
Euclid Both Directions - North Spokane Corridor construction will cause Euclid Ave. to be reduced one lane in each direction from Market St to Freya St in both directions beginning at 7:00 pm on April 22, 2021 until further notice. Last Updated: 4/16/2021 1:11 PM More Info

MODERATE IMPACT
US 195 Southbound - Right Lane Closure on US 195 SB at MP 81.5 near Cornwall Road for Bridge work near Spangle, expect slight delays, Maximum bridge weight 105,500 legal loads only, no over legal axle weights.beginning at 6:53 am on May 29, 2020 until further notice. Last Updated: 2/23/2021 7:18 AM More Info
At milepost 81
MODERATE IMPACT
I-5 Northbound - Beginning Monday, Jan. 4, until further notice: All freight trucks will encounter a traffic shift to use the center lane on northbound I-5 along the Lewis River Bridge, between mileposts 19.36 and 20.0, just south of Woodland.
Note: All travelers should slow down through the area and freight traffic should watch for advanced signs advising them when to shift to use the center lane. Last Updated: 12/30/2020 1:35 PM More Info
From milepost 19 to milepost 20
MODERATE IMPACT
SR 290 Both Directions - SR 290 closed for bridge replacement starting near MP 0.5 at the Spokane River, City of Spokane, EB 290 is closed at Hamilton Street, WB 290 is closed at Iron Court, commercial vehicles are diverted to Freya Street, all other traffic can use Mission Street, beginning at 6:18 am on June 3, 2020 until further notice. Follow signed detour route and expect delays. Last Updated: 6/3/2020 8:04 AM More Info
From milepost 1 to milepost 2
MODERATE IMPACT
Wellesley Both Directions - The City of Spokane: Starting Wednesday, Nov. 20, contractor crews working for the Washington State Department of Transportation will begin constructing the North Spokane Corridor (NSC) Wellesley Avenue interchange. During this time, Wellesley Avenue between Market Street and Freya Street will be closed to pedestrian, bicycle and vehicular traffic. The closure and interchange work will last until the end of 2022. Please use alternate routes. Last Updated: 11/12/2019 8:53 AM More Info

LOW IMPACT
US 97 Northbound - US 97 northbound milepost 69 to 74 Wapato vicinity: There will be single lane closures Thursday September 23, 7 p.m. to Friday September 24 at 9 a.m.
Friday September 24, 7 p.m. to Saturday September 25 at 7 a.m.
Minimal delays are anticipated. Last Updated: 9/24/2021 7:21 PM More Info
From milepost 69 to milepost 74
LOW IMPACT
US 97 Both Directions - US 97 milepost 63 to 64, north of Toppenish: There is a northbound traffic revision with a single lane in both directions for construction work. No access is available to and from US 97 to Becker Rd. and McDonald Rd. Last Updated: 9/24/2021 7:20 PM More Info
From milepost 63 to milepost 64
LOW IMPACT
Short Rd Both Directions - Spokane County will have lane closures for road work on Short Road between Mason Road and Bridges Road, starting on September 27 to September 30, 2021. Watch for flaggers and expect delays. Last Updated: 9/19/2021 1:06 PM More Info

LOW IMPACT
US 101 Both Directions - US 101 near Quilcene will be closed on Saturday, Oct. 2 from 11 a.m. to noon for a community parade. A signed detour will be in place. Law enforcement officers will be on scene to direct traffic while the parade is underway. Last Updated: 9/14/2021 5:08 PM More Info
From milepost 294 to milepost 295
LOW IMPACT
Appleway Av Both Directions - Spokane County will have Appleway Ave closed at Spokane Bridge Road for road work, on September 13, 2021. Use other routes. Last Updated: 9/12/2021 5:20 PM More Info

LOW IMPACT
Bigelow Gulch Rd Both Directions - Spokane County will have lane closures for road work on Bigelow Gulch Road between Weile Ave and Argonne Road. Expect delays. South and North Jensen Road is open. Last Updated: 9/12/2021 5:17 PM More Info

LOW IMPACT
US 97 Both Directions - On US 97 at milepost 330 (railroad crossing south of Oroville), there is a 35 m.p.h. advisory speed zone in place due to road conditions. Travelers should not attempt to pass slower vehicles through the advisory speed zone. Last Updated: 9/10/2021 2:59 PM More Info
From milepost 330 to milepost 331
LOW IMPACT
SR 508 Both Directions - Beginning at 7 a.m., Monday, Aug. 16 until further notice: Travelers on both directions of SR 508 between Hyak Road at milepost 7.31 and Gheer Creek at milepost 7.42, will alternate through a single lane with flaggers daily, Monday through Friday, from 7 a.m. to 7 p.m., for roadway improvements. Last Updated: 8/27/2021 1:19 PM More Info
From milepost 7 to milepost 8
LOW IMPACT
Frideger Rd Both Directions - Spokane County has the road closed for bridge replacement on Frideger Rd at the Little Spokane River. Use other routes, expect delays. Last Updated: 8/9/2021 9:51 AM More Info

LOW IMPACT
Greene Both Directions - Construction will be ongoing next to North Greene Street from Mission Ave. to Ermina Ave. in both directions until further notice. Work is part of the North Spokane Corridor work that is being constructed in the Spokane Community College parking lot. Last Updated: 7/14/2021 1:24 PM More Info

LOW IMPACT
Sprague Both Directions - Construction on Sprague Ave. from Grant St to Division St has the roadway closed in both directions until further notice.

Business access is available via First Avenue and the alley north of Sprague. Arterial traffic is detoured via Second and Third Avenues. Last Updated: 6/18/2021 3:15 PM More Info

LOW IMPACT
Post Both Directions - Construction on the Post Street bridge will keep the bridge closed in both directions until further notice. The bridge is set to reopen in 2022. Last Updated: 6/18/2021 3:11 PM More Info

LOW IMPACT
SR 123 Both Directions - SR-123 Cayuse Pass is open for the season Last Updated: 5/29/2021 8:55 AM More Info
From milepost 2 to milepost 17
LOW IMPACT
SR 401 Both Directions - Beginning on Thursday, April 15, 2021, until further notice: a single lane remains closed on SR 401, due to roadway settlement caused by heavy rain. Travelers will be shifted to use a single lane bypass road, with temporary signals alternating traffic on either side.

NOTE: Travelers should slow down and watch for road crews as work continues to stabilize the slope and repair the road. Last Updated: 4/23/2021 11:38 AM More Info
From milepost 0 to milepost 13
LOWEST IMPACT
US 395 Both Directions - US 395 both directions milepost 13 to 14: Access to S Bofer Canyon Rd from SB & NB US 395 via SR 397 will be closed to the public due to roadway excavation for thru traffic until further notice. Christensen Rd will be closed between the intersections of Christensen Rd & Southridge Blvd and Christensen Rd & Ridgeline Dr. Starting on Monday, Sept 20, access to Ridgeline Dr on the westside will be closed until further notice. Last Updated: 9/24/2021 7:22 PM More Info
From milepost 13 to milepost 14
LOWEST IMPACT
SR 109 Both Directions - From 6 a.m. to 6 p.m. Monday through Friday, Sept. 20-24, expect alternating traffic with flaggers for installation of guide posts, pavement markings and road signage. Chip seal and road preservation work is complete. All work is expected to wrap up early October. Last Updated: 9/9/2021 11:04 AM More Info
From milepost 6 to milepost 17
LOWEST IMPACT
I-90 Eastbound - The loop on-ramp from Grove Road to eastbound I-90 will close beginning at 7 p.m., Wednesday, August 4. Crews will be grinding and extending the ramp for its new alignment with I-90. The directional on-ramp to eastbound I-90 will remain open. Last Updated: 8/4/2021 8:54 AM More Info
At milepost 276
LOWEST IMPACT
Lincoln Both Directions - City Construction: Post Street Bridge and intersection of Lincoln Street and Summit Boulevard is closed. The bridge will open in 2022. Last Updated: 6/25/2021 12:53 PM More Info

LOWEST IMPACT
Rosamond Both Directions - The Rosamond bridge over I-90 is closed in both directions until further notice. Drivers in the area will need to detour via the Lindeke Street bridge to cross over I-90. Last Updated: 6/13/2021 12:18 PM More Info