Return to Map

MODERATE IMPACT
SR 21 Both Directions - One lane bridge and road construction on SR 21 at milepost 145 at the San Poil River bridge beginning at 3:52 pm on June 11, 2019 until 6:00 pm November 15, 2019. Watch for slow-moving vehicles over the bridge and in the area. Last Updated: 8/23/2019 10:29 AM
At milepost 145