Return to Map

HIGHEST IMPACT
I-5 Southbound - Intermittent bridge lifts in progress on I-5 southbound at the Interstate Bridge (MP 0), Expect delays or use alternate route, from 12:01 AM to 5:00 AM. Last Updated: 9/18/2019 12:09 AM More Info
At milepost 0
HIGH IMPACT
I-5 Northbound - Road work on I-5 northbound from milepost 89 near US 12 to milepost 93 near Maytown Rest Area beginning at 10:16 pm on September 17, 2019 until about 5:00 am on September 18, 2019. Last Updated: 9/17/2019 10:22 PM More Info
From milepost 89 to milepost 93
HIGH IMPACT
SR 506 Both Directions - Beginning at 7 a.m. on Tuesday, June 18, until further notice: Both directions of SR 506, between Telegraph Road and the end of the Lacamas Creek Bridge, will be fully closed, for bridge replacement work.
Note: During construction, travelers will follow a signed detour using South Military Road and SR 505. The bridge closure and detour will remain in place until construction of the new bridge is complete. Last Updated: 6/14/2019 4:59 PM More Info
From milepost 8 to milepost 8
MODERATE IMPACT
I-205 Northbound - On 205 northbound at MP 32 to MP 37 the right lane is closed due to roadwork. Last Updated: 9/17/2019 11:38 PM More Info
From milepost 32 to milepost 37
MODERATE IMPACT
SR 502 Westbound - On the SR 502 westbound off-ramp to Southbound I-5 (MP 0) the ramp will be closed tonight from 10:05 PM to 5:00 AM due to roadwork. Please use alternate route. Last Updated: 9/13/2019 10:12 PM More Info
At milepost 0
MODERATE IMPACT
I-205 Northbound - Sunday, Sept. 15 to the morning of Saturday, Sept. 21: ?Up to two lanes of northbound I-205, between SR 14/Columbia River and the I-5/I-205 split, will close nightly, from 9 p.m. to 6 a.m., for concrete panel replacement work. Last Updated: 9/13/2019 12:32 PM More Info
From milepost 27 to milepost 37
MODERATE IMPACT
SR 14 Both Directions - Beginning Monday, Sept. 16, through the end of October: Travelers should plan for nighttime delays, as they alternate through a single-lane of SR 14 near 32nd Street, nightly from 7 p.m. until 7 a.m. Last Updated: 9/6/2019 1:46 PM More Info
At milepost 17
MODERATE IMPACT
SR 14 Both Directions - Saturday, Sept. 14: Both directions of the Bridge of the Gods will close from 7 a.m. until 8:30 a.m. for the Bridge of the Goddess event. Travelers should use an alternate route during the closure. Last Updated: 9/6/2019 1:18 PM More Info
At milepost 42
MODERATE IMPACT
SR 6 Both Directions - Tuesday, Aug. 13 until further notice: Travelers on both directions of SR 6, between mileposts 22.60 and 22.69, will be shifted onto a temporary single-lane, bypass road. This detour allows travelers to safely bypass construction around-the-clock, and will be controlled with an automated signal.
Note: Travelers should expect delays of up to 20 minutes, for additional intermittent, daytime single-lane closures, as needed. Last Updated: 8/9/2019 2:41 PM More Info
From milepost 23 to milepost 23
MODERATE IMPACT
SR 6 Both Directions - Beginning Monday, July 26, until further notice: Travelers on both directions of SR 6, near Jones Creek just east of Pe Ell, will be shifted onto a temporary single-lane, bypass road. This detour allows travelers to safely bypass construction around-the-clock, and will be controlled with an automated signal.
Note: Travelers should expect delays of up to 20 minutes, for additional intermittent, daytime single-lane closures, as needed. Last Updated: 7/26/2019 1:29 PM More Info
From milepost 31 to milepost 32
MODERATE IMPACT
I-5 Southbound - Beginning Monday, July 15 until further notice: A single lane on southbound I-5 between mileposts 51.43 and 52.79 will be closed around-the-clock until construction on the bridge is complete. Overnight double-lane closures will be in place from 9 p.m. to 6 a.m. nightly Monday through Friday.
Note: The speed limit has been reduced to 55 mph throughout the length of the work zone for the duration of construction. Last Updated: 7/5/2019 5:45 PM More Info
From milepost 52 to milepost 53
MODERATE IMPACT
SR 14 Both Directions - Monday, July 8 until further notice: Beginning at 7 a.m., all travelers within the intersection of SR 14 and 32nd Street will be shifted to a temporary roundabout for approximately five weeks. Last Updated: 7/5/2019 5:13 PM More Info
At milepost 17
MODERATE IMPACT
SR 409 Both Directions - Beginning Friday, March 22, 2019, until further notice: Traffic will alternate through a single lane, around-the-clock, for bridge painting and deck replacement work. For everyone’s safety, the speed limit across the bridge is 25 mph. Please slow down and give crews room to work. Last Updated: 3/29/2019 11:55 AM More Info
At milepost 3
LOW IMPACT
SR 14 Both Directions - Monday, Sept. 15 to Friday, Sept. 20: Travelers on eastbound SR 14, between the intersection of Hot Springs Avenue and Wind River, will be alternated intermittently through a single lane, with flaggers daily, from 6 a.m. to 6 p.m., for railroad bridge replacement work. Last Updated: 9/13/2019 10:49 AM More Info
At milepost 49
LOW IMPACT
SR 7 Both Directions - A section of SR 7 north of Alder from milepost 23.6 to milepost 23.7 has a temporary speed limit reduction in place from 50 mph to 25 mph. Crews are monitoring a hillside adjacent to the highway after recent rains bought small debris onto the shoulder. The temporary speed limit reduction will remain in place until further notice. Last Updated: 9/12/2019 2:41 PM More Info
From milepost 24 to milepost 24
LOW IMPACT
SR 6 Both Directions - Beginning Tuesday, Aug. 13, until further notice: Travelers on both directions of SR 6 near Salmon Creek will be shifted to use a temporary detour road along SR 6, as work to replace an undersized culvert with a larger box culvert continues. During the work, travelers will pass through the area, around-the-clock, via an automated signal. The speed limit will be reduced to 25-mph, throughout the work zone. Travelers should expect delays of up to 20 minutes, and may encounter lane closures. Last Updated: 8/14/2019 9:11 AM More Info
From milepost 28 to milepost 29