Central Washington Cameras

Alerts

As of 7/22/2019 5:22 AM
Blocking Incidents
  • The SR 162 Spiketon Creek Bridge has been permanently closed due to recently discovered pier settlement. A detour is in effect using Mundy Loss Road, SR 410 and SR 165. View our next steps for a path towards replacement.
  • Advance Notice: I-90 westbound Ryegrass Rest Area milepost 126, 16 miles east of Ellensburg will be closed Tuesday July 23 at 1 a.m. to Wednesday July 24 at 1 a.m. for a paving project.
  • I-90 westbound milepost 110 near Ellendburg to milepost 52 near the summit of Snoqualmie pass: Heavy weekend traffic is causing backups and up to 30 minutes of added travel time. An estimated time for the backups to clear out is not determined.
Construction Closures
  • SR 28 between Ephrata and Soap Lake (MP 44 to 53)- Monday through Thursday, from 7 a.m. to 7 p.m., expect delays up to 20 minutes with flaggers, lane shifts and alternating one-way traffic between Martin Road and the south end of Ephrata, and between the north end of Ephrata and Soap Lake where the contractor is chip sealing. **travel with care**
  • I-90 milepost 33 to 136 North Bend to Vantage: This week we have a number of construction and maintenance activities taking place between North Bend and Vantage during the day and at night which could cause delays due to lane closures. Please plan for added travel time and pay attention and slow down as you enter and exit our work zones.
  • US 97 south of Blewett Pass at Swauk Campground (MP 159), Monday and Tuesday, 7 a.m. to 5 p.m., expect flagger controlled traffic with delays up to 20 minutes near Swauk Campground as the contractor continues drilled shaft construction. Traffic in both directions has been shifted to detour lanes requiring a 12 ft. width restriction and a reduced speed of 50 mph through the work zone. These restrictions will remain in place during non-working hours through the duration of the project.
  • ON US2/97 east of the Odabashian Bridge-the Cascade Avenue exit is closed for construction of the 35th St. extension until July. There is a signed detour.
  • On SR 243 between Vernita and Vantage (MP 0 to 28), Monday and Thursday only, 6 a.m. to 6 p.m. expect delays up to 30 min. with flaggers and pilot car controlled traffic where the contractor is chip sealing. Monday through Thursday nights from 7 p.m.to 5 a.m., expect mobile slow downs where the contractor will be brooming. Please do not pass brooming operations.
  • On US 97 beginning at the junction of SR 970 for 15 miles to Tronson Creek campground, Monday through Thursday, 6 a.m. to 8 p.m., expect one lane, flagger controlled traffic with delays up to 20 minutes in the work zone where the contractor will be paving, starting at the Mineral Springs area working north toward the summit of Blewett Pass.
  • At US 97 Blewett Pass at milepost 159 in both directions near Swauk Creek campground, Thursday only expect flagger controlled traffic with delays of up to 20 minutes as the contractor pours concrete for the drilled shaft construction. Traffic in both directions has been shifted to detour lanes requiring a 12 ft. width restriction and a reduced speed of 50 mph through the work zone. These restrictions will remain in place during non-working hours. Bypass lane has narrow shoulders.
  • On US 2 near Peshastin (MP 103.5) Monday and Tuesday only, from 8 a.m. to 3:30 p.m., expect flagger controlled traffic with delays where a maintenance crew is repairing a shoulder wash out.
  • Sunday, July 21, to the morning of Friday, July 26 – Up to three right lanes of eastbound I-90 between East Sunset Way and 468th Avenue Southeast will close from 9 p.m. to 6 a.m. nightly. This work is weather-dependent.
  • On I-90 in Moses Lake (milepost 175.5 to 176.1) Wednesday and Thursday, 7 a.m. to 4 p.m., expect right lane closures and reduced speed zone of 55 mph through work zone where crews are repairing concrete on bridge slab edges. Speed limit returns to 70 mph during non-working hours, including weekends.
  • I-90 and I-82 Ellensburg to Vantage Paving
    Traffic should anticipate delays with added travel times in both directions.
    Multiple Lane Closures Sunday July 21, 12 a.m. through Thursday July 25 at 9 a.m., milepost 122 to milepost 130
    I-90 Westbound Lane Closures: 6 a.m. to 6 p.m.
    I-90 Eastbound Lane Closures: 6 a.m. to 6 p.m.
    Multiple Lane Closures Sunday July 21, 12 a.m. through Thursday July 25 at 9 a.m. milepost 130 to milepost 122
  • I-82 South Union Gap Interchange – Construct Ramps
    I-82 Eastbound:
    Day Work – July 22 & July 24: Shadow Vehicle Left Lane
    Night Work – July 23(7 P.M. – 6 A.M.): Left Lane Closure.
    I-82 Westbound:
    Night Work – July 22 and July 23 (7 P.M. – 6 A.M.): Left Lane Closure.
    Exit 38 Westbound Off-Ramp:
    Day Work – July 23 – July 25: Flagging Operation
  • White Pass Vicinity Major Drainage Phase 2
    Monday July 22 through Friday July 26, 7 a.m. to 5 p.m. MP 153- Drivers should anticipate alternating one way traffic with up to 20 minute delays.
  • North 1st Street to I-82 Eastbound Ramp Closure:
    Monday July 22 through Saturday July 27 the on ramp from North 1st Street to I-82 eastbound will be closed.
Special Events
  • None reported