Return to Map

MODERATE IMPACT
SR 21 Both Directions - Construction on SR 21 both directions at milepost 145.6 near W Fork Sanpoil River until further notice. Drivers will need to be alert approaching the bridge as the temporary structure is a single lane bridge with alternating traffic. Last Updated: 7/30/2019 8:42 AM
At milepost 146
Report Detail: Construction on SR 21 both directions at milepost 145.6 near W Fork Sanpoil River until further notice. Drivers will need to be alert approaching the bridge as the temporary structure is a single lane bridge with alternating traffic.