Emergency alert symbol

COVID-19

For the latest COVID-19 health guidance, statistics and resources, visit Coronavirus.wa.gov.

Return to Map

LOW IMPACT
US 97 Both Directions - On US 97 Blewett Pass milepost 159-160 (near Swauk Creek Campground), Monday through Friday from 8 a.m. to 5 p.m. there is the potential for flagger controlled traffic with delays when the contractor is staging equipment.
Traffic has been shifted to a bypass lane with a reduced speed limit and 12 ft. width restriction. The speed reduction and width restrict are in place 24/7. Last Updated: 7/5/2020 4:39 PM
At milepost 160
Report Detail: US 97 Boundary Bridge #9323 County: Kittitas Highway: US 97 Region: North Central Location: MP 159-160 (Swauk Campground) Description: In this $4.5M project, WHH Nisqually Construction Services will construct a concrete bridge to replace an old culvert that created a fish passage barrier. Work will include a detour widening to shift traffic while the bridge is constructed half at a time. Two-way traffic will be maintained outside working hours throughout the life of the project, except some instances of work that may require overnight flagging. No full closures of US 97 are planned for this project. Work started on March 9 and is scheduled to be complete in late October. Work schedule: Monday through Friday from 8 a.m. to 5 p.m. there is the potential for flagger controlled traffic with delays when the contractor is staging equipment. Traffic has been shifted to a bypass lane with a reduced speed limit and 12 ft. width restriction. The reduced speed and width restriction are in place 24/7. Monday through Friday, 8 a.m. to 5 p.m. there is the potential for some traffic control with brief delays as the contractor stages equipment. Contact: Project Engineer Brian Pearson 509-667-2880 https://www.wsdot.wa.gov/projects/us97/boundary-bridge/home